bridge transition 中文意思是什麼

bridge transition 解釋
電橋式轉變
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  • transition : n 轉變,演變,變遷,變化;飛越;過渡期;【音樂】變調,轉調;【修辭學】語次轉變;【語法】轉換;【...
  1. Applicafion of semiarch - type transition slab at bridge head

    半拱式弧形橋頭搭板的應用
  2. Application of gravel piles for ground stabilization of transition zone between subgrade and bridge on qinhuangdo - shenyan occupation railway of passenger train

    碎石樁在秦沈客運專線加固路橋過渡段基礎中的應用
  3. Template making in construction of the bridge with transition curve

    緩和曲線上橋梁的施工放樣
  4. Anti - torsion - bridge real pioneering new devolpment of rackets which last historically long, like the transition of wood to carbon are rare

    抗扭橋羽毛球拍製作中最新的,最具革命性歷史意義的發展,意義等同於木拍到碳拍的過渡。
  5. P > anti - torsion - bridge real pioneering new devolpment of rackets which last historically long, like the transition of wood to carbon are rare

    抗扭橋羽毛球拍製作中最新的,最具革命性歷史意義的發展,意義等同於木拍到碳拍的過渡。
  6. Comprehensive reinforcement technique of bridge approach bump disease in the construction of transition section

    過渡段施工橋頭跳車病害的綜合加固施工技術
  7. Learened from the construction of composite ground for subgrade and transition zone between subgrade and bridge qinhuangdao - shenyang passenger special line a12 a13 section

    13標路基及路橋過渡段復合地基施工體會
  8. For example, when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s, the actual flow quantity is 23. 8m3 / s on the 30th of september in 1989, the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4. 3m, and the level between downstream and shang tian yuan tunnel was generally higher. it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value. this not only make the benefit of the irrigation district abnormal, but also greatly hinder the economic development of the irrigation district, and lead to the canal run frequently at small flow, high water level, lengthen the discharge duration

    如東一乾渠上段太平橋以上設計流量45m ~ 3 s , 1989年9月30日實測通水流量23 . 8m ~ 3 s時,東一乾渠郝灣渡槽出口漸變段末端水位已達到設計水位4 . 3m ,其下游至上天院隧洞水位也普遍偏高,即東一乾渠上段目前僅能通過流量24m ~ 3 s左右,只有設計值的50左右,不僅使灌區效益得不到正常發揮,嚴重阻礙了灌區范圍內的經濟發展,而且使渠道經常處于小流量、高水位運行,延長了次通水時間,大大增加了渠道工程的安全管理難度。
  9. Including the main body of the subgrade, protecting and supporting engineering. drainage equipment of road, culvert and the transition zone between the road and the bridge. through investigating the types of diseases, the author discusses the existing problems and causes of producing diseases, puts forward the protective measures in design and construction, and raises the treatment measures in highway maintenance, which makes it more scientific and perfect for highway construction and maintenance in the loess areas

    論文首先對黃土的工程特性及其影響因素進行了分析,然後對黃土地區路基病害及其防治技術進行了研究,具體包括路基主體、防護與支擋工程、公路排水設施、涵洞及路橋過波段等部分,對病害類型進行了調查,分析了使用中存在的問題與病害產生的原因,提出了在設計與施工中應採取的防範措施,給出了養護中的處治對策,使我國黃士地區公路建設與養護更加科學和完善。
  10. Based on the design case of shuangjianghe bridge on the segment from tongdao to jili in g209 national high - way which was being built, the linear cantilever slabs was made to fit transition curve of the route

    摘要以國道g209通道至吉利段改造工程中的雙江河大橋設計實例,研究位於小半徑緩和曲線上預制空心板梁的外懸臂折線逐步逼近緩和曲線線形,與橋上路線線形一致。
  11. Abstract : a mechanical model to analyze the dynamic performance of train and transition section between roadbed and railway bridge was established a nd a series of reasonable criterions were put forward too. based on this, the init ial deformation of rails due to different subsidence of roadbed and bridge abutm ent, the effects of the direction and speed of train on the dynamic performance o f wheel / track system were studied. at last, the method to determinate the length o f transition section was suggested

    文摘:建立了列車與路橋過渡段動力特性分析模型,確定了一套軌道過渡段動力特性的評價指標,分析了由基礎沉降差引起的鋼軌初始變形以及行車方向、行車速度對輪軌系統動力性能的影響,提出了確定路橋過渡段長度的方法。
  12. Adapter module servers as the bridge of different system and transmits messages. intelligent routing module can choose route automatically for a transaction. the format transition module completes the transition between various messages

    適配器模塊使中間業務平臺能很容易連接外部系統,或特定的主機;智能交換路由模塊能根據用戶設置的路由腳本,靈活地進行報文路徑的選擇;進行目標適配器的定位,控制報文信息的流轉。
  13. It features a brilliant uncirculated hk 10 coin with the design of a suspension bridge symbolising the smooth transition in 1997 ; and a first - day cover with a special lantau link stamp franked with a specially designed postmark dated 18 may 1997

    首日封內附有一枚刻上弔橋圖案,象徵主權回歸順利過渡的新鑄拾圓紀念幣。首日封上更附有以青嶼干線為設計圖案的紀念郵票及蓋有一九九七年五月十八日的特別郵戳。
  14. The results indicate that this method can minish settlement largely, decrease level thrusts on bridge abutment, make the settlements transition, improve the bearing capacity of foundation soil and its economic benefits are notable. the results of field test show that low intensity piles can put into widely use in soft foundation of express way

    研究結果表明,採用低強度樁復合地基加固橋頭軟基時,可以採用變樁長、變間距的設計思想,使沉降逐漸過渡,減輕橋頭跳車的危害,並且還可以減小沉降和深層土體水平位移,減小對橋臺及其樁基的水平推力,提高地基承載力。
  15. Three - phase full bridge controlled rectifier, filter circuit and the common loads " mathematics models are built and analyzed. according to the rate of the transition process, the controlled rectification power supply can be classified into fast response and slow response. based on identification of the transition processes using the slope method, the different fuzzy control strategy is adopted. the control method can meet the requirements of real time control and non - error regulation. the simulation results verify its practibility. after that. the design scheme based on dsp is introduced including the design of hardware and software flow chart. emc is an important aspect which can not neglected, so the designs of emc are summarized including hardware and software

    根據過渡過程的快慢將可控整流電源系統分為快響應過程和慢響應過程,本文在利用響應曲線斜率法辨以過渡過程的基礎上,分別針對快響應過程和慢響應過程採取了相應的模糊控制策略,以滿足快響應過程要求實時控制,快速跟蹤誤差變化,慢響應過程要求精確定位,無差調節的要求,模擬結果驗證了該方法的有效性,進而分析了用dsp實現該調節器的硬體電路和軟體流程的設計思路。
分享友人