budget estimate 中文意思是什麼

budget estimate 解釋
概算
  • budget : n 1 預算,預算案。2 經營費;生活費;(有限制的)供應,來源。3 〈古語〉〈方言〉小皮包;小皮包中的...
  • estimate : vt 1 估計,估算;估價;估量。2 評價,評斷。3 〈古語〉尊重。vi 估計,估價。n 1 估計;預測;〈英國〉...
  1. The financial secretary announced in the 2003 - 04 budget the government s intention to dispose of or securitize 112 billion of assets in the next five financial years and set a target to raise an estimate of 21 billion in 2003 - 04

    在2003 - 04年度財政預算案中,財政司司長宣布,政府擬于未來5個財政年度將價值1 , 120億元的資產出售或證券化,並訂下目標,在2003 - 04年度籌措大約210億元。
  2. The financial secretary ( fs ) announced in the 2003 - 04 budget the government s intention to dispose of or securitize $ 112 billion of assets in the next five financial years and set a target to raise an estimate of $ 21 billion in 2003 - 04

    在2003 - 04年度財政預算案中,財政司司長宣布,政府擬于未來5個財政年度將價值1 , 120億元的資產出售或證券化,並訂下目標,在2003 - 04年度籌措大約210億元。
  3. Discussion on power project budget base estimate the value of total 183 ; net cost seperation determine

    基於量183 ;價分離確定電力工程預算的探討
  4. Potential for cost growth in production was contained within current budget estimate through cost reduction initiatives formalized in a government / industry memorandum of agreement

    潛在的成本生產增長則控制在目前的財政預算,通過降低成本的措施,正式在政府/產業協議備忘錄
  5. Formulation of budget estimate financed by foreign funds at zipingpu water conservancy project

    紫坪鋪水利樞紐工程外資概算的編制
  6. For the department, the income budget is united budget, the expenditure budget is divided into basic expenditure budget and project expenditure budget. and we use zero base budget to estimate the count of expenditure. as that finished, i design the chart of local department budget

    部門支出預算的編制首先要進行科學地分類,將部門支出預算分為基本支出預算與項目支出預算;支出預算編制的基本方法是零基預演算法,包括對基本支出實行定員定額管理,對項目支出實行項目庫管理。
  7. An estimate of vietnam ' s revenues in its fiscal budget from 2006 to

    2010年越南財政預算收入預測
  8. The important factors of compiling quality of highway engineering budget estimate and budget

    提高公路工程施工圖預算編制質量探討
  9. Latest construction cost estimate and budget provision for each contract package

    每份合同包的最新施工成本估算及預算準備。
  10. Now, there are many phenomenons of failure to keep within the cost budget / forecast / estimate / tender in construction industry

    目前在我國的建設領域仍普遍存在著嚴重的「三超」現象、 「釣魚工程」和「爛尾樓」工程。
  11. But in the construction field in our country, there are many serious problems in cost management. for example, there exists the appearance of budgetary estimate exceeding the estimate, the budget exceeding budgetary estimate, and the final accounts exceeding the budget

    但在我國的建設領域卻普遍存在著嚴重的成本問題:概算超估算、預算超概算、決算超預算的「三超」現象比比皆是,而「釣魚工程」和「爛尾樓」工程又是屢見不鮮的。
  12. Reporting to financial planning supervisor, the incumbent is responsible for preparing annual budget and targets setting based on dhl network and local requirements, analyses the actual results against budget and prepare monthly rolling estimate to reflect the latest trends and development plans of the company in forecasted financial results

    向財務計劃主管匯報,主要負責根據dhl網路和地方的要求準備年度預算和目標設定,實際結果與預算的對比分析,準備月度滾動預測,及時反映公司在財務預測結果方面的最新趨勢和發展計劃。
  13. A contract for survey or design includes terms such as the time limit for submission of the relevant basic information and documents ( including budget estimate ), the quality requirements, fees, and other conditions of cooperation, etc

    第二百七十五條施工合同的內容包括工程范圍、建設工期、中間交工工程的開工和竣工時間、工程質量、工程造價、技術資料交付時間、材料和設備供應責任、撥款和結算、竣工驗收、質量保修范圍和質量保證期、雙方相互協作等條款。
  14. When making estimate of the cash flow after the year of the budget or forecast, the growth rates adopted shall not, unless the enterprise can prove that it is reasonable to adopt higher growth rates, exceed the long - term average growth rate of the products, or the market, or the industrial field which the enterprise belongs to, or the country or region where the enterprise is located, or the long - term average growth rate of the market where the asset is situated

    在對預算或者預測期之後年份的現金流量進行預計時,所使用的增長率除了企業能夠證明更高的增長率是合理的之外,不應當超過企業經營的產品、市場、所處的行業或者所在國家或者地區的長期平均增長率,或者該資產所處市場的長期平均增長率。
  15. An overview of current methods to estimate carbon budget of terrestrial ecosystems

    陸地生態系統碳平衡主要研究方法評述
  16. The issue so - called “ thress excess ” ( i. e budgetary estimate in excess of reckon, budget in excess of budgetary estimate, settle accounts in excess of budget ) exists in many projects of campuses according to the investigation by myself

    根據本人調查,許多高校建設項目存在著概算超估算、預算超概算、結算超預算的「三超」問題。
  17. According to the methods of drawing up investment appraisal in feasibility study for chemical construction projects issued by former chemical ministry, initial budget estimate are made to engineering of both phases, total investments for submitted approval as following

    根據原化工部頒發的化工建設項目可行性研究投資估算編制辦法,對兩期工程進行了估算,經初步估算,本項目報批投資總額如下:
  18. Issues to be given attention to in preparation of estimate budget of bridge works

    橋梁工程預算編制中應注意的幾個問題
  19. C as the projected daily turnover of the stock market for 2001 - 02 underlying both the sfc budget and the government s original estimate for stamp duty on stock transactions for 2001 - 02 is similar, the income from stamp duty on stock transactions with reference to sfc s projected level of stock turnover would be the same as that projected by the government based on the government s projected level of stock turnover

    C由於證監會制訂二零零一至零二年度財政預算及政府對該年度股票交易印花稅的預算,其所依據的股票市場估計每日成交量相若,參考證監會所估計的股票成交量而計算的股票交易印花稅收入,與政府根據其估計的股票成交量而預計的將會一樣。
  20. In this connection, readers may wish to note that in four out of eight years the actual return was higher than the budget estimate, and averaging over the eight years the actual return is also higher than the budget estimate

    在這方面,讀者可以留意到外匯基金在過去8年內,有4年的實際回報都超出預算案的估計數字,而即使以這8年的平均數計,實際回報仍然高過估計數字。
分享友人