built in procedure 中文意思是什麼

built in procedure 解釋
內部過程
  • built : adj. 1. 建造成的,組合的,拼成的。2. 〈俚語〉體型美的。n. 〈俚語〉體型美,肉體美。
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • procedure : n. 1. 工序,過程,步驟。2. 程序,手續;方法;訴訟程序;(議會的)議事程序。3. 行為,行動,傳統的做法;(外交、軍隊等的)禮儀,禮節。4. 〈罕用語〉進行。
  1. The main contents of the reform of trial preceding in economic case is the reform of the system of the evidence. adjustment of the standard of proof in chinese is to built dualistic system for procedural standard of proof. so the proof on the balance of probabilities will be the procedural standard in chinese civil procedure

    我國目前正在進行的民事審判方式改革,主要是證據制度方面的改革,以形成符合我國國情的民事證明標準,本文試從對民事證明標準概念,證明標準在證據制度上的意義和證明標準模式的評析,揭示我國奉引的一元制證明標準的弊端,並結合國情,得出我國應建立高度蓋然性的民事證明標準的結論,並指出該證明標準在實踐中的可行性和相應的配套制度的建設。
  2. In order to illustrate the main procedure of this design method, the more complicated application software system is founded to imitate practical precision casting products design. product - cases library is built by use of relative data model, which can be expanded. view retrieve interfaces are made in case retrieve

    編寫應用軟體系統來模擬鑄件產品設計實踐,實現本課題設計方法的主要過程,建立可視化鑄件產品實例檢索界面,採用可擴展的鑄件產品實例庫關系模型。
  3. The construction of the bridge began in oct 1999, and the closing up of the steel tube was in dec 2000. during that period, i learned and analyzed the current construction methods fairly comprehensively, and collected the construction technique data of the cfst arch bridges having been built. based on this, aided by the simulation of construction procedure using finite element program, i proposed the operation program to make the steel tube segment be located at one time, and the scheme of dividing rooms to segment pouring

    大橋於99年10月開工, 2000年12月主橋鋼管合龍,在此期間,本人就目前鋼管混凝土拱橋的施工方法進行了較全面的了解和分析,搜集了此類已建橋梁的施工技術資料,在此基礎上,又藉助有限元程序對施工過程模擬計算的支持,提出了在梅溪河大橋懸臂安裝過程中,鋼管節段一次就位的操作程序和鋼管混凝土分倉灌築的方案,並為施工單位采納應用。
  4. So, it is essential to deepen the understanding in theory to second instance procedure system and provide legislative suggestion to it which is perfectly and scientifically being built - up progressively

    因此有必要從理論上加深對第二審程序制度的研究,並為逐步建立一套科學、完善的第二審程序制度體系提供立法建議。
  5. Secondly, grounded on the study of the distribution of the high external waterpressure and high geostress and the characteristic of the rock in engineering area, the paper built the elastoplastic fem numerical simulation model, and think over the procedure in tunnels excavation and the history of work of water load, and then get the relations between the different tunnels diameter, different permeability coefficient and depth of the grouting rock and the deformation, stress distribution and plastic range of the surrounding rock and support structure. finally, according to the modern design theory of tunnels construction, the particular design of country rock reinforcement and support structure are researched and presented for diversion tunnels

    接著,本文在深入研究工程區高外水壓力及高地應力分佈規律及巖體特性的基礎上,建立起高地應力、高外水壓力作用下隧洞圍巖結構非線性有限元模擬計算模型,然後考慮隧洞的開挖過程、水荷載的作用歷史,通過計算分析得出了不同洞徑、不同的灌漿圈滲透系數和不同的灌漿圈深度以及不同開挖過程與圍巖及支護結構的應力、位移和塑性區的關系。
  6. According to three dimension braided composites for braided technology - four - step and technology - two - step procedure, and with reference to theories of braided fabric geometry and force models, a geometric model is built. in this model, the cross - section of thread is described as a circle and thread path as a cubic b - spline. braided - fabric structures in three dimensions are displayed by using solid - modeling techniques

    本文三維編織物根據四步法和二步法編織工藝,從紗線的力學模型出發,建立了以圓形近似描述紗線的截面形態,以三次b樣條曲線近似描述紗線的屈曲形態的織物空間幾何模型,利用計算機三維實體造型技術,分別建立各自的編織物實體模型,用來模擬織物內部各紗線的空間位置,完成織物結構模擬。
  7. In pl / 1, a function procedure ( programmer - specified or built - in ), a procedure that is invoked by the appearance of one of its entry names in a function reference and which returns a value to the point reference

    在pl 1語言中,一種函數過程(程序員規定的或內部的) ,在引用函數時,出現一個函數過程名就調用一次過程,並返回一個值給引用點。
  8. We have built a full set of value chain in r & d, procedure control, logistics and services after sale

    公司已建立一套完善的產品研發、生產控制、物流配送及售後服務體系。
  9. Based on the handling of problems shown in 110, 000dwt product carriers, built by dalian new shipyard for denmark, and the installation procedure of vlcc for iran, a detailed description is presented on the installation technical and problems disposals of main engine and shafting system

    通過大連船廠為丹麥的幾條11萬噸成品油輪的建造及問題處理和為伊朗建造的vlcc船上的安裝工藝的總結和改進為例,詳細闡述了主機和軸系的安裝工藝方法,問題處理方法。
  10. Part three is the related rationale about the idea of constructivism and action research, on which present study is built on. part four is a larger part, giving a detailed introduction about the general procedure in which the lesson - based case is carried, and exemplifying the specific lesson cases in in - service teacher training class

    所有的課例分為兩部分:一部分是課例的主體,主要採用敘述性的手法,用第三人稱描述一個教學任務在課堂中展開的過程;另一部分為輔助部分,包括呈現的教學任務,供討論的問題,以及教學注釋等內容。
分享友人