built schedule 中文意思是什麼

built schedule 解釋
實際建造進度計劃
  • built : adj. 1. 建造成的,組合的,拼成的。2. 〈俚語〉體型美的。n. 〈俚語〉體型美,肉體美。
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  1. Integrated the 8th section of sui - yu railway project being built bycrec ( china railway engineering civil co. ltd ) into this paper and proceeding with the macrocosmic management of construction item, the author expatiates on how to focus on the center of the construction schedule goal and do well in schedule, quality, safety, cost and environment protection

    本文結合中鐵二局股份公司正在施工的遂(寧)渝(重慶)鐵路第8標段工程,從施工項目整體管理入手,闡述了如何圍繞施工進度總目標這個中心,從進度、質量、安全、成本、環水保管理搞好項目管理。
  2. Model is built by constraints of develop cost and schedule in the example fire control radar conceptual design, calculational conclusion demonstrates the effectiveness of the proposed model

    最後以火控雷達的概念設計為例,以研製費用和研製進度為約束條件建立模型,計算說明此模型是有效的。
  3. It is important to operate under new business process and built - in corporation culture of customer - oriented in every corner of company before starting up crm operation. the question of new business process must be discovered and corrected in time. crm is one project of time consumption, so corporate needs time to analyze his needs ; crm provider also needs time to comprehend deeply corporate business and needs, corporate should make a reasonable project schedule, not only for project deadline ; to program, to test and debug

    在正式推行crm之前,應用新的管理流程試運行,以顧客為中心的思想先建立在公司的員工心中,形成公司的文化,同時發現新流程的問題,及時調整並在crm系統中修正; crm系統的實施需要時間,實施企業需要時間分析自己的需求,軟體公司也需要時間理解企業的需求和軟體編寫和調試;企業應制定合理的項目進度表,而不是只追求進度。
  4. Schedule 6 ; special units to be built signed security agreements

    附表6特殊搭建的單位須簽安全協議。
  5. Built - up cleaning system, the cleaning company is according to the customer condition and schedule to modifies the first cleaning, the second, the third and the final test tasks

    潔凈室系統之建立,清潔公司會依照業主之設備裝設工程進度,施作第一次清潔,第二次清潔,第三次清潔. . .及驗收清潔工程。
  6. The lower tier of the new west stand was built on schedule but then problems with the local council over planning permission meant a 2 year delay before the rest of the stand could be built

    西看臺的底層已經按時完工,但由於沒有獲得當地政府的計劃編制許可,餘下的工程必須在兩年以後才能開工。
  7. In this thesis, to study the construction management system of highway engineering project. the cost, resources and schedule are considered. in the management system presented here, a multi - serise management model for highway engineering project construction is proposed. a data base system of engineering project information management is built up

    本文從公路工程項目施工管理部門的角度出發,以宏觀管理同微觀管理相結合為目標,從信息管理、計劃管理及施工過程評價與控制三大方面,綜合考慮工期、資源、成本三大指標,對公路工程項目施工管理系統進行了深入系統的研究。
  8. 2. the numerical model of engine jl474q1 has been built up base on the engine test which lays a foundation for the search of vehicle starting up and shift schedule. 3

    對jl474q1發動機進行臺架性能試驗,利用樣條插值方法構造了發動機轉矩模型和發動機燃油消耗模型,為amt起步和換檔規律的研究奠定了基礎。
  9. Pangang had built the erp system, it is based on the integrative for the produce and sale system, it also realized the centralized management for the first level schedule and first level account. it solved the data source problem of the erp and the problem for the command downloading and executing on time

    攀鋼確定以產銷一體化系統為龍頭建設公司整體產銷系統,實現一級計劃、一級核算的集中一貫制管理,解決整體產銷系統的「數據源」問題及指令的及時下達與執行問題。
  10. As - built schedule

    實際建造進度計劃
  11. Armitage showcase the latest erp solutions and ifs strategic human resource planning for the manufacturing and government sector in a new and efficient way. what s more. our recommend solution enables you a built - in functionality to link with work orders, production schedule or any particular project, our parcel is fit for any integration and all complex it environment