burst stress 中文意思是什麼

burst stress 解釋
爆破應力
  • burst : vi 1 破裂,迸裂,爆炸;爆發出,噴出;(花蕾等)綻開,(洪水等)潰決;〈俚語〉破產。2 突然發作,忽...
  • stress : n 1 壓力,壓迫,緊迫,緊張。2 【語音】重音;重讀;【詩】揚音;語勢,著重點。3 重要(性),重點,...
  1. Abstract : incompatible element nh11 and hybrid stress element 18 were employed to analyze rock burst occurring in coal face 9108 of sanhejian coal mine. compared with the results from ansys, the two optimized fems can execute more accurate numerical simulation in the research of rock burst as well as other rock problems and lessen the errors from inaedquately meshing in huge calculations due to the limitation of labor and computer time. in addition, the criterion of averaged generalized stress rate was proposed and used to determine the site and moment of rock burst. the given conclusion is in accordance with the face of coal face 9108 very well

    文摘:利用優化非協調元和雜交元分析了三河尖礦沖擊礦壓,並與ansys程序的計算結果進行了比較.認為優化有限元在沖擊礦壓乃至巖石材料的數值模擬中能給出更為精確的結果,也可減小大型計算中由於人力、機時所限粗分網格產生的誤差.分析中,採用了廣義平均應力率準則來判斷沖擊點位置和沖擊時刻,所得結論與實際情況吻合
  2. Research on prevention of rock burst in deep high - stress area of fankou deposit

    凡口礦深部高應力區巖爆防治研究
  3. The prevention and control of rock burst are of great significance for safely exploiting deep deposit in high - stress area

    摘要巖爆的預防和控制對深部高應力區礦床的安全開采具有十分重要的意義。
  4. Based on the analyses of the physical and mechanical properties of ore / rock and the behavior of ground stress field in the deep deposit of fankou lead - zinc mine, the authors researched the unloading measures to prevent and control rock burst in mining the deep deposit, and carried out numerical simulations of the stress distribution under different unloading mining situations by means of 3 - d elastic - plastic finite element program, so as to give decision - making basis for controlling rock burst in exploiting the deep deposit of fankou lead - zinc mine

    根據凡口鉛鋅礦深部礦巖體的物理力學性質及地應力場特性,對凡口礦深部礦床開採的巖爆防治措施進行了研究,並應用三維彈塑性有限元程序對各種防治措施引起的應力分佈進行了數值模擬分析,以期為凡口鉛鋅礦深部礦床開採的巖爆控制提供決策依據。
  5. Practice of rock burst prevention by stress relax boreholes

    利用卸壓鉆孔防治沖擊地壓的實踐
  6. Referring the universal methods of rockburst study used home and abroad and taking the actual situations of the project into account, we take the primary terrestrial stress and uniaxial compressive strength as the quantitative evaluation indexes for the prediction and evaluation of rock burst

    借鑒目前國內外巖爆判別的主要方法,並依據擬建工程場地實際情況,選用巖體初始應力及巖石單軸抗壓強度作為定量評估指標,對巖爆災害進行預測評估。
  7. Numerical simulation of rock burst stress and its control by stress - relief

    沖擊地壓應力狀態及卸壓治理數值模擬
  8. And besides, the dissertation develops the contents of traditional information construction, brings wall rock classification, high crustal stress distinguishing and rock pressure burst forecasting into information construction category, in this way, the information construction is more applicable and perfect

    並且,本文拓展了傳統信息化施工的內涵,將施工地質跟蹤調查與測試、圍巖分類、高地應力判別和巖爆預測也納入了信息化施工范疇。
  9. We certainly do not wish to see any blocked or burst pipes, particularly in times of stress

    我們當然不希望有任何堵塞或破裂,特別是在使用量最多最緊張的時間。
  10. With the decrease of the coal thickness, the stress in coal and rock will increase, while the harder the coal is, the greater the vertical stress in coal and rock will be, resulting man increase of risk of rock burst

    隨著煤層厚度的減小,在煤巖體中產生的應力集中將增大;隨著煤層硬度的增加,煤巖體中的最大垂直應力也將增大,從而也增加了沖擊危險性。
  11. Since the vertical stress distribution of coal and rock can reflect the risk of rock burst, the influence of hardness and thickness of coal seams with a hard roof and a hard floor on the vertical stress distribution of coal and rock was simulated

    摘要在堅硬頂板和底板的「兩硬」條件下,對不同煤層厚度和硬度對煤巖體中的垂直應力分佈的影響,也即反映了對煤巖體中發生沖擊礦壓危險性的影響進行了模擬。
分享友人