cable form 中文意思是什麼

cable form 解釋
電纜摸板
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  • form : n 1 形態;形狀;樣子,外貌;【哲學】形式 (opp content)。2 人影,物影。3 格式;表格紙 (= 〈美...
  1. Have enriched the chain producing, processing the production of highly processed agricultural products estate uttering with andeli juice as the leading role, wood job with dark labor of jilin as the leading role estate enchains, spinning and weaving estate with day rainbow spinning and weaving as the leading role enchains, machinery manufacturing industry with silver dragon cable as the leading role 4 - big estate enchains ; chain building feng cheng city chemical industry the sources of energy chemical industry estate taking form soon for the faucet in course of

    充實了以安德利果汁為龍頭的生產、加工出口的農產品深加工產業鏈,以吉林森工為龍頭的木業產業鏈,以天虹紡織為龍頭的紡織產業鏈,以銀龍電纜為龍頭的機械製造業四大產業鏈;正在建設即將形成的豐城化工為龍頭的能源化工產業鏈。
  2. Skin the insulation material of wires with a length 5 cm more than that of wire clip, and hang c form parts and splitting wire on the main cable, and then insert the wedge between the two wires with force

    剝離絕緣導線絕緣層,剝離長度應大於線夾長度5厘米,將c形元件和分接線一起掛在主線上,將楔塊用力插入兩導線之間。
  3. Abstract : this paper expounds the main construction method of west cable tower of chongqing egongyan yangtze river suspension bridge, and gives a detailed description of construction technology of climbing form system with an inner climbing scaffold

    文摘:介紹重慶長江鵝公巖大橋懸索橋西塔主要施工方法,對西塔塔柱內爬架爬模系統施工工藝作了詳細闡述。
  4. In this paper, the construction techniques of linjiangmen cable - stayed bridge in jilin, such as large sinking well technique of pier, climbing form panel technique of main tower, stay rope formwork traveler technique of girder and construction control, are summarized in details

    本文全面總結了吉林臨江門斜拉橋施工技術,詳細敘述了主墩大型沉井施工技術,主塔爬模施工技術,主梁牽索式掛籃施工新技術。斜拉索施工及施工控制等。
  5. Modify above model along with altering structural form or the constitution of the bridge, such as different standard, steel ratio, steel pipe diameter, concrete module, brace allocation, the length of concrete of the main ribs, suspending pole mode and cable local vibrations, calculate the variety of dynamic character, analyze this factors which will affect. 2

    對斜拉拱橋自振特性進行參數分析,分別考慮了不同規范、含鋼率、拱肋鋼管直徑、混凝土彈性模量、橫撐布置、拱肋段混凝土長度、吊桿形式對自振特性的影響,最後考慮了斜拉索局部振動對自振特性的影響。
  6. One end of the cable is permanently connected to the enclosed mercury switch and the entire assembly is encapsulated to form a completely water tight and impact resistant unit

    電纜的一端永久性連接在封閉的水銀開關內,這個完整的密封總裝形成完全不透水、抗撞擊裝置。
  7. Equilibrium form - finding analysis of cable - membrane structure

    索膜結構平衡法找形分析
  8. The thought of form - finding of the cable - strut - membrane structure is proposed. this is, according to the architectural appearance, request of constructing and the optimization result of cable - pole structure, the space form of cable - pole structure will be received

    提出索桿膜結構協同找形的分析思路:按建築外觀及構造要求,索桿體系優化的結果,確定索桿結構的空間形狀。
  9. One of the most important events in the history of the development of tv technologies is the implementation of digital compression technology, which leads tv industry into a new rapidly developing stage. with satellite, cable and terrestrial transmission channels, dvb, of which the digital compression is the core technology, has such features as two - way channels, interactive functions, etc. in dvb system, the information of video, audio and text is digitalized and integrated to form a new kind of tv program. furthermore, through online digital information broadcasting, people can browse information of other programs while watching several programs just as they have done on the internet

    電視技術發展史上最重要的里程碑是數字壓縮技術的廣泛應用,它將電視事業帶入一個新的高速發展時期,以數字壓縮為核心技術的數字電視廣播通過衛星有線和地面傳輸具有多功能雙向傳輸交互性等特點,不僅將圖像聲音和文字等信息數字化,而且將有關信息相互鏈接並有機地結合在一起形成了新的節目形態,特別是其採用了數字信息在線廣播方式,觀眾在收看到多套節目的同時還可以像訪問網際網路那樣瀏覽其它節目信息。
  10. The optimization model of the cable tensile force is established, resolving the ideal finished state of considering syntheticly the requirement including the dead load, active load and presress of structure, meanwhile, providing a forward - calculating method for determining the rational construction state on the foundation of the optimization model. on the other hand how to determine and adjust the important parameter, the cable midst tensile forces and the main feam form setting levels in constructing cable - stayed bridge, has also been analyzed, besides, the corresponding calculation method is introduced and applied to the actual construction controlling of xian tao han jiang highway bridge well

    本文以仙桃漢江公路大橋為工程背景在斜拉橋設計計算方面進行了的研究,建立了斜拉橋索力優化模型,一方面解決了能綜合考慮結構恆載、活載及預應力等多方面因素的理想成橋狀態確定問題;另一方面在確定合理施工受力狀態問題上提出了一套以索力優化模型為基礎的正裝計演算法。同時對斜拉橋施工中關鍵參數斜拉索中間索力和主梁立模標高的確定和調整做了進一步的分析,提供了相應的計算方法,並應用於仙桃漢江公路大橋施工控制過程中,取得了良好的效果。
  11. In this paper, through the static analysis, the internal force and displacement of the different cable form projects and the relevant single - layer spherical latticed shell were compared ; the effect of different cable form project to the structural static stability was obtained

    本文對選定的三個布索方案進行了靜力分析,比較了各方案的內力和位移,並和相應單層球面網殼做了對比,得到了布索圈數對結構靜力性能的影響。
  12. Four prestressed projects set with two different basis was compared the static force stability, the prestressed project of less internal fore and displacement was obtained. according to this project, three projects of different cable form were given to compare the structural static stability, overall stability and dynamical stability

    在此方案的基礎上,確定了三個不同的布索方案,進行靜力、整體穩定和動力性能比較,得到了布索圈數對結構靜力性能、整體穩定性能和動力性能的影響。
  13. In this paper, through the overall stability analysis, the flexion eigenvalue, the nonlinear overall stability factor of the perfect structure and the nonlinear overall stability factor considering the initial imperfection of the different cable form projects and the relevant single - layer spherical latticed shell were compared ; the effect of different cable form projects to the structural overall stability was obtained

    本文對選定的三個布索方案進行了整體穩定分析,比較了各方案的屈曲特徵值、完善結構的非線性整體穩定系數和考慮初始缺陷的非線性整體穩定系數,並和相應單層球面網殼做了對比,得到了布索圈數對結構整體穩定性能的影響。
  14. In this paper, through the self oscillation analysis and the earthquake response analysis, the frequency, the oscillation mode, the transverse and vertical earthquake response of the different cable form projects and the relevant single - layer spherical latticed shell were compared, the effect of different cable form projects to the structural dynamical stability was obtained

    本文對選定的三個布索方案進行了自振特性分析和地震響應分析,比較了各方案的頻率、振型以及橫向和豎向地震反應,並和相應單層球面網殼進行了對比,得到了布索圈數對結構動力性能的影響。
  15. It is necessary to study the construction technology of concrete cable bent towers. the dissertation introduces construction sequence, construction methods ( supporter construction, slip - form construction, climbing formwork and turn - over formwork construction ), anti - overturning measures of the tilted tower, crossbeams " construction and its bracing structure

    本文主要介紹了混凝土塔柱的施工順序、施工方法(支架法、滑模法、爬模法和翻模法) 、傾斜塔柱的施工抗傾措施、橫梁施工及支撐系統。
  16. In this paper, the suspen - dome structure of the gymnasium for olympic badminton game in 2008 was used for example. three projects of different cable form was analyzed the static stability, overall stability and dynamical stability. in this paper, the basis of setting prestress for large span suspend - dome was discussed first

    本文以我校奧運羽毛球比賽館的弦支穹頂屋蓋結構(跨度93米)為工程應用對象,採用大型通用有限元分析軟體ansys ,選擇不同的布索方案進行了靜力、整體穩定和動力性能分析。
  17. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜拉橋的主體工程,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和橋墩;用可考慮幾何非線性的桁元模擬斜拉索、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張拉預應力鋼筋和張拉斜拉索。
  18. I want to send a cable, will you get me the cable form

    我要拍一封電報,幫我拿電報表格來好嗎?
  19. G : i want to send a cable, will you get me the cable form

    我要拍一封電報,幫我拿電報表格來好嗎?
  20. Will you get me the cable form

    幫我拿電報表格來好嗎?
分享友人