calculation plot 中文意思是什麼

calculation plot 解釋
計算小區
  • calculation : n. 1. 計算,計演算法。2. 推定,預測。3. 深思熟慮,精打細算;慎重的計劃;算計。
  • plot : n 1 陰謀(事件),策劃。2 (小說、戲劇等的)情節。3 【炮兵】測算表。vt ( tt )1 密謀,圖謀;策劃...
  1. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水閘)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  2. According to the sr - nd isotopic characteristics of peridotite xenoliths and their host basalts, it indicates that xenoliths in hannuoba, puning area may represent source area of the host basalt because of the xenoliths and host rocks being in the same plot ; however, the xenoliths is not directly related to their host rocks of the others area for the xenoliths plot out of the range of their host basaltic rocks. thermal dynamics calculation shows that the peridotite xenoliths are formed in the condition of pressure of 9. 45 - 25kb and temperature of 945 - 1281

    橄欖巖包體及其寄主玄武巖的sr - nd同位素研究表明,漢諾壩與普寧地區部分包體樣品投點落在其寄主玄武巖nd和sr同位素的分佈范圍內,表明橄欖巖包體代表了寄主玄武巖的源區,而其它大部分地區的包體其寄主玄武巖范圍之外,表明寄主玄武巖和橄欖巖包體無成因聯系,橄欖巖包體只是偶然包體。
  3. Forgoing land premia for ura redevelopment sites and rehousing land ; exemption of gic facilities from plot ratio calculation

    豁免政府團體社區設施所佔樓面面積納入計算地積比率
  4. Exemption of gic facilities from plot ratio calculation, expedite land resumption procedures, and

    在計算地積比率時豁免政府團體社區設施的樓面面積;
  5. As another application instance, a subsystem monitoring ultra - high frequency partial discharge of transformer is developed, which can analyse, process, plot time - domain pd data and demodulated pd data, besides, it also has such discharge type recognition function as spectrum calculation and auto correlation

    作為另一應用實例,研製了變壓器超高頻局放監測子系統,此系統具有分析、處理、顯示超高頻時域波形及其包絡線波形數據的功能,還具有用於放電模式識別的時域波形及其包絡線波形的頻譜計算和自相關處理等功能。
  6. To exempt the proposed gic facilities from plot ratio calculation in private redevelopment projects

    在計算地積比率時豁免私人重建計劃中涉及政府團體社區設施的樓面面積。
  7. So by dimensional chain calculation we can improve the design level of the products plot, determine the tolerance of parts economically, assure the machine precision, and improve the quality of the products

    因此,根據產品技術要求,利用尺寸鏈進行計算,經濟合理的決定零部件的尺寸公差、模擬裝配過程,可以提高產品樣圖的設計水平,保證加工精度,提高產品質量,並使產品獲得最佳的技術水平和經濟效益。
  8. Capp ( computer aided process planning ) appears with the rapid development of modern machinery manufacture and computer technology. which makes use of the practical experiences of technician to process data, to make scientific decision, to create process regulations automatically, to aid the dimension calculation procedure, to plot working procedure drawings, to choose cutting parameter, to aid optimizing process planning and etc. and it also provides a powerful technological support for the digitalization, intelligentization and autoimmunization of process planning design

    計算機輔助工藝過程規劃系統( cappcomputeraidedprocessplanning )是伴隨著當代機械製造領域的轉型和計算機技術的迅猛發展而應運而生的,它在利用工藝人員的經驗知識和各種工藝數據進行科學的決策、自動生成工藝規程、輔助完成計算工序尺寸、繪制工序圖、選擇切削參數和優化工藝設計結果等方面的良好表現為工藝設計的數字化、智能化和自動化提供了很好的技術支撐。
  9. The data used by calculation program and post - processing are formed by dialog boxes, and fed back by figure. a finite element program which considers the influence of axial deformation can analyze the prestressed concrete frame structure, then the structure is designed according to the code of concrete structure gbj10 - 89. post - processing can give the result of calulation by text file and graph, and plot construction drawings in autocad

    前處理模塊通過對話框採集數據來建模,並利用圖形反饋建模結果;計算核心利用考慮了軸向變形的桿系有限元程序計算荷載效應和預應力效應,並按《混凝土結構設計規范》 gbj10 ? 89計算承載能力極限狀態和正常使用極限狀態;后處理模塊通過文本文件和圖形顯示來完成結果查詢,並直接在autocad環境下生成施工圖。
分享友人