  1. In order to prove the feasibility of the control method mentioned, both the semiphysical test for the plant simulated by analogue computer and the model test for the cantilever beam are designed and finished with the study of the parameter selection in realization

    對離線建模的智能旋翼頻域神經控制方法進行了試驗驗證研究,試驗分兩種情況:以模擬計算機模擬受控對象的半物理模擬試驗與懸臂梁振動響應控制試驗,並研究了實現中的參數選擇問題。
  2. Approximately one-third of the span from the pier may be erected by the free cantilever method.

    大約三分之一的跨長可以由一個橋墩起靠自由懸臂的方法向前架設。
  3. Practical method for calculating equivalent wind loads on double cantilever bridges

    等長雙懸臂梁等效風荷載實用計算方法
  4. Cantilever test method for cold - formed steel diaphragms

    冷成型鋼隔板的懸臂試驗方法
  5. The bridge has builded by balanced cantilever construction technique. the beam camber of construction is a controlling index of construction quality control. it is nonlinear, and now is not mature forecasting method

    該橋採用節段式懸拼施工法,其施工預拱度的控制是關鍵指標,目前沒有一個成熟預測方法。
  6. The method is as follows : calculating the length, angles and coordinates of pre - cast hollow slab in cartesian coordinate system, and then adjusting the width of hollow slab beams and length of cantilever boards to make the linear cantilever slabs close to the transition of mute

    具體方法是:採用直角坐標系計算預制空心板斜長、首尾夾角和起終點坐標,根據計算結果與路線線形之差,多次調整空心板梁的梁板寬度和懸臂長度,使外懸臂折線滿足路線的緩和曲線線形。
  7. The content of this thesis comes from the fujian natural science found following research task 。 it studies on a space cantilever single beam attached to a moving support 。 inertia forces which are brought by the support ' s movement , are acceded to the equivalent initiative forces and the equivalent initiative moments 。 when we consider the relation of the forces and deformation , we change the method of material mechanical analysis to the elastic mechanical analysis 。 further more , we discusses the feasibility of the method which uses the multi - rigid - body discrete model to simulate the dynamic characteristic of a elastic body 。 first , the finite segment method is adopted to establish the models of the beam 。 based on kane ' s equations , dynamic math - model for the beam are derived 。 and by use of c - language and runge - kutta procedure , the computer - oriented procedure can give the whole responses of the beam 。 second , with compare to the numerical examples , the method which uses the multi - rigid - body discrete model to simulate the dynamic characteristic of a elastic body which is under the condition of movement is verified to be feasible 。

    本論文為福建省自然科學基金后續研究課題,以已知支撐運動的單個空間懸臂梁為對象,在等效主動力與等效主動力矩中加入支撐轉動引起的慣性力,並在考慮力與變形關系時,用更一般的彈性力學分析代替材料力學分析,進一步研究用多剛體離散模型來模擬其動力學特性的可行性。首先,用有限段建立機械臂的多剛體離散模型,用kane動力學方法建立其動力學方程。並用c語言編制演算法程序,採用了四階runge - kutta積分程序求解微分方程組,給出構件的全部動態歷程。
  8. Based on the arch - cantilever method, the stability of arch ring and cantilever beam against elastic buckling in arch dams are analyzed with the theory of elastic stability, and the conclusion is drawn that the stability of arch dam against elastic buckling is governed by the top arch ring

    按照拱梁分載法的思想,用彈性穩定理論分別對拱壩的拱圈和懸臂梁的抗屈曲穩定性進行了分析,得出拱壩的抗屈曲穩定性由壩頂拱圈控制的結論。
  9. Conversion formula between the strain mode and displacement mode is induced for the cantilever beam. present residual force method is improved and the new method is better than the old one for the engineering practice

    推導出位移模態和應變模態的換算公式,改進了現有的殘餘力向量法,使之在工程實際應用中有更現實的意義。
  10. Secondly, the construction techniques of cantilever concreting method of girder are analyzed in details. the construction program of stay rope formwork traveler, including the selection of formwork traveler type and the design of formwork traveler, is introduced

    本文重點分析了主梁的懸灌施工技術,從掛籃方案的比選與定型,到掛籃的設計與使用都做了詳細的介紹,本橋採用牽索式掛籃施工方案。
  11. According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis

    根據掛籃前端牽索錨固點處的變形協調條件建立了掛籃上混凝土澆築過程中牽索索力的增加量,並推導了掛籃上混凝土澆築過程中的各主要工況下掛籃前端標高的計算公式,對文暉大橋掛籃上混凝土澆築過程中的牽索索力和掛籃前端標高進行了細致地控制,確保了混凝土澆築的順利進行,為整個主梁線形和索力的雙控打下了良好的基礎。
  12. Through newton ’ s law of motion, the continuous model of the cantilever is built. the author discretizes the model through lumped mass method and supposed modal method, analyzes the discretized model through influence coefficients method. compare the results of the two models ; the general analysis method of non - uniform beams is obtained

    其次,對懸臂梁結構進行了理論分析,應用牛頓運動定律,建立了懸臂梁系統的連續模型,並用集中質量法和假設模態法對懸臂梁系統進行了離散化,運用影響系數法對離散化后的系統進行了分析,並把分析結果和連續系統進行了對比,得到了變截面梁的一般分析方法。
  13. The paper lays a strong emphasis on discussing the realization of the autocontrol of raster scanning of the scanner in x - y dimension, the " tapping " of the cantilever of the tappingmode afm by a direct digital synthesizer. then a method of parallel communication between dsp and pc in epp mode is given. finally, the author discussed the digital pid closed loop control of the scanner in z - direction, the automatic approaching of the tip using step - motor, and also some electro - magnetic interferences

    論文首先簡單介紹了掃描探針顯微鏡的發展、分類、工作原理及應用;接著對ti公司的tms320vc5402dsp的特點及外圍擴展作了簡單介紹;然後分章節重點講述了利用vc5402dsp實現掃描探針顯微鏡的核心部件? ?壓電陶瓷管的x向和y向的光柵掃描控制;藉助直接數字集成器( dds )實現輕敲式原子力顯微鏡的微懸臂的「輕敲」 ; vc5402dsp的主機介面( hpi )與pc機在增強并行口( epp )模式下的通信;論文最後還介紹了掃描管z向的數字pid閉環控制,步進電機的自動進針,並對實際出現的一些電磁干擾問題作了討論。
  14. Besides experiments, the present domestic and abroad study on anti - slide pile is mainly analysis by traditional cantilever beam method, foundation coefficient method and elastic mechanic method. on the basis of previous studies, this paper carries out a research on relevant design and calculation theory about anti - slide piles, comprising the interaction between anti - slide piles and rock and soil of side slopes, the soil arching model of anti - slide piles and the internal stress calculation method of prestressed anchor cables

    目前國內外對抗滑樁的研究,除試驗研究外,主要採用傳統的懸臂梁法、地基系數法及彈性力學方法來進行分析。本文在前人的研究基礎上,通過對抗滑樁相關設計計算理論進行研究,包括抗滑樁與邊坡巖土體的相互作用,抗滑樁的土拱效應模型以及抗滑樁預應力錨索的內力計算方法進行分析。
  15. ( 3 ) this thesis deduces the predigestion calculating method for calculating the section stress redistributed by the effects of concrete shrinkage, creep and difference temperature of pre - stressed lager cantilever composite beam with corrugated steel webs

    ( 3 )推導了預應力波形鋼腹板組合挑梁關于徐變、收縮及溫度效應下的截面應力分佈簡化計算方法。
  16. ( 2 ) based on the existing theory of lateral load distribution rule, and combined the structure characteristic of pre - stressed lager cantilever composite beam with corrugated steel webs, this thesis proposed the modified rigid beam method. taking this method, it is facilitated to compute the lateral load distribution factor of bearing composite cantilever beam with variable - stiffness under the load in arbitrarily position

    ( 2 )以現有的橫向分佈理論為基礎,結合大懸臂波形鋼腹板組合挑梁的結構特點,提出了修正剛接梁法的計算方法,能夠方便地計算變剛度懸臂組合梁任意點位的橫向分佈系數。
  17. The simplified method, one time statically indeterminate plane truss, for the solution of sunflower - patterned cable dome and sunflower - patterned cantilever roof is introduced. this method is clear and convenient and the results are reliable

    提出了採用一次超靜定平面徑向桁架結構,求解荷載態下葵花型索穹頂和葵花型環形挑篷內力和位移的簡捷計算方法,該方法力學概念明確,思路清晰,計算簡便,結果可靠。
  18. The method of indirectly measuring force exerted on ground by bucket is used to check cantilever bucket - wheel stacker / reclaimer counter - weight, working out the hydraulic cylinder force to determine the force exerted on ground by bucket and thus counterweight value

    摘要針對懸臂斗輪堆取料機配重的校核提出了1種間接測定接地力的方法,即通過懸臂升降液壓缸上下油腔壓力計算出液壓缸受力,進一步推算出堆取料機的接地力,從而確定配重安裝量。
  19. Restrain alteration size is applied to improve the efficiency of structure optimization. approximate reanalysis technology is introduced to save the time of stress reanalysis. the multi - cantilever method and the finite element method is combined to analysis the arch dam, to enhance the capability of practical applications in engineer

    在拱壩優化設計中採用了約束變尺度演算法,提高了優化效率;在優化重分析過程中,採用近似重分析技術,節省應力分析時間;採用試載法和有限元相結合的應力分析方法,提高了解決實際工程問題的能力。
  20. This paper emphasizes on the construction control of concrete arch bridge, which is constructed by the precast segmental cantilever method. through analyzing this new erection method, it is considered that the cable forces directly influence the stresses of arch rib sections and the deflections of the arch axis, in addition, the stress of the arch rib section is the key factor in construction control

    本文以懸臂拼裝鋼筋混凝土拱橋的施工控制為研究對象,結合工程實例,分析了大跨徑鋼筋混凝土拱橋的懸臂拼裝施工方法,認為施工過程中拉索的索力直接影響拱肋截面的應力和拱肋軸線的標高,拱肋截面的應力是懸臂拼裝拱橋施工控制的關鍵因素。