cap of pile 中文意思是什麼

cap of pile 解釋
樁帽
  • cap : n 1 無邊帽,便帽;制服帽;軍帽;頭巾。2 鞘,(筆)套,蓋,罩子;(鞋)尖。3 【建築】柱頭;【礦物...
  • of : OF =Old French 古法語。
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  1. In this paper, using the program ( epagpll ), the bored testing pile group of the chinese architecture science and research institute at luokou area are analysised. the comparisons among analytical results of four constitutive models of soil are made, and the deformation of piles and soil, the soil resistance of the piles, the friction beneath cap, the aclinic displacement of the ground soil before piles and the failure pattern of pile group are discussed in detail

    本文利用所編的程序,對上海地區豎向荷載作用下的單樁的流變效應進行了分析,並通過樁體位移?時間關系曲線,確定軟土地基上豎直受力樁的承載力,分析了豎直受力樁的最終沉降量的大小,並結合《上海地區地基基礎》地方規范就程序計算結果進行了對比。
  2. The influences of fender piles on pile cap reactions, settlements, moments and twist moments of raft are discussed herein

    討論了考慮圍護樁作用對樁頂反力、沉降及筏板彎矩、扭矩所帶來的影響。
  3. Application of ptc pile with cap for profundity soft soil ground treatment

    管樁在深厚軟土地基處理中的應用
  4. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮吊,完成了水上運輸、水上起重等作業,如鋼管樁的運輸、插打、水上施工平臺的搭設、鉆機吊車的水上轉移、承臺吊箱的起吊、鋼管樁的拔除等作業。
  5. In addition, the computer method is proposed to get the stochastic pile capacity and the random optimum analysis is done in virtue of the genetic algorithm which can easily think over the influence of the randomness of pile capacity on the internal force of capping beam based on the thorough analysis about the primary factors influencing the randomness of pile capacity. an optimization program is worked out for the analysis which can consider the pile - soil - cap interaction and the non - linear character of the foundation soil

    此外,本文對影響基樁承載力差異性的主要因素進行了深入分析,提出了基樁承載力隨機生成的計算機方法,並採用遺傳演算法對承臺梁內力進行隨機優化分析,可方便地考慮基樁承載力隨機性對承臺梁內力的影響,並開發出能考慮樁?土?承臺共同工作及地基土非線性特性的樁基承臺梁內力優化分析程序。
  6. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  7. Bundled in padded boots, a knit cap and layers of sweaters, li xiulan says that for all of her 73 winters in china ' s frigid northeast, her best weapon against the biting cold has been a pile of bricks

    腳蹬棉鞋、頭戴絨線帽、身穿幾件毛衣的李秀蘭說,在中國東北整整73個寒冬里,她抵禦嚴寒的最好武器是一炕土坯/磚頭。
  8. Mechanical impact dynamics is used to analyse the production and spread of stress wave when hydraulic pile hammer hammerblows piles, the stress wave influence the course of driving pile. slender hammer that is equal to wave resistance of the pile can bring ideal stress waveform. when the hammer weight is constant, efficiency of driving pile can be increased by means of selecting drive cap and cushion pad of different rigidity to match the hammer according to various geological condition and the pile. the structure and principium of hydraulic system of double - acting hydraulic pile hammer with double cylinders is studied in detail in the paper, the hydraulic system and electric control system of six - ton - double - actin hydraulic pile hammer with double cylinder is designed on the basis of it

    本文應用沖擊機械繫統動力學分析打樁過程中錘體與樁撞擊時應力波的產生、傳播以及該波對沉樁過程的影響。認為與樁等波阻的細長狀錘體能夠產生理想的應力波波形;在樁錘重量一定的情況下,可針對不同的地質情況和樁,通過選擇不同剛度的樁帽和樁墊與其匹配來提高打樁效率。本文對雙缸雙作用液壓打樁錘液壓系統的結構和工作原理進行了深入的研究,並在此基礎上設計出六噸雙缸雙作用液壓打樁錘的液壓系統和電控系統。
  9. To counter the main reasons of piles ' displacement and inclination, i. e., 1 ) greater lodging after removal of pile cap ; 2 ) inclination of pile frame ; 3 ) driving into ballast course ; 4 ) obvious rolling of excavated mud surface, a set of effective measures dealing with deviation of marine driving are offered

    針對其中影響樁跑位和樁傾斜的主要原因,即: 1 )起帽后樁倒伏大; 2 )樁架不垂直; 3 )碎石層上沉樁; 4 )挖泥泥面起伏大,總結出一套控制水上沉樁偏位行之有效的方法。
  10. Main tower - pile cap construction - stainless rebar tt layer - couplers for walls of main pylon

    主塔樁帽-鋼筋tt層及供連接主塔韁墻壁內之鋼筋的聯接器
  11. Crack control of pile cap mass concrete of sea - span bridge

    跨海大橋大體積承臺混凝土裂紋控制
  12. It could be seen that the curve of settlement and load of pile, the distribution of axial force on the pile top, the curve of load on cap and axial force on the top pile obtained with numerical analysis were agreed with those measured in centrifugal model test

    分析結果表明,數值分析所得承臺沉降與承臺荷載的關系曲線、樁頂軸力分佈、樁頂軸力隨承臺荷載變化的關系曲線,與其離心模型試驗實測成果較一致。
  13. At last, the resultes are compared with those without adoption of random field model and the reliability of pile foundation under vertical load is systematically studied. the conclusion is that the interaction of piles group - soil - pile cap has great effect on the reliability of the pile foundation

    並與未採用隨機場模型的計算結果相比較,對豎向荷載下樁基可靠性進行了較系統的研究,說明樁群?土?承臺相互作用的特性對整個樁基礎的可靠度有很大影響。
  14. At the same time, the corresponding programs on the above two methods can be compiled in frotran90 respectively, which are used to analyze the influence of several factors on behaviour of barrette pile group and barrette pile group - soil - cap interaction, including collocation of pile, ratio of length to width, pile spacing, ratio of depth to equivalent diameter, ratio of modulus of pile to soil, possion ' s ratio, the finite layer, the number of piles etc. lastly a series of model tests on vertically - loaded bahaviour of single pile are made, tests results are analyzed, and the causes of tests failure are preliminarily discussed in this paper

    分析了群樁布置形式、長寬比、樁與樁之間的相對距離,樁徑比、樁土剛度比、泊松比、有限壓縮層深度以及群樁根數等因素對壁板樁群樁和壁板樁群樁?土?承臺的相互共同作用問題的影響。論文最後做了一組壁板樁和圓形樁單樁模型試驗,對試驗數據進行了分析,並對試驗中存在的問題進行了初步探討。
  15. Through the choice of pile - cap concrete ' s raw material and the mix optimization design, it is concluded that the mix design of mass concrete not only satisfy all the design requirements, but also attain the anti - crack concrete

    實例證實:通過對大體積混凝土的原材料選擇和配合比的優化設計,不僅能保證大體積混凝土的設計要求,也實現了大體積混凝土防裂的目標。
  16. An experimental study on steel fiber reinforced concrete ( sfrc ) thick cap with four piles indicates that the factors affecting its ultimate loads are composed of its effective thickness, steel fiber volume ratio, concrete strength grade, shear span length, steel ratio and the form of reinforcement, in which the factor of the form of reinforcement affecting the ultimate loads of pile cap is distinct

    摘要鋼纖維混凝土四樁厚承臺的性能試驗研究結果表明,影響其極限荷載的因素主要有承臺有效厚度、鋼纖維體積率、混凝土基體強度等級、承臺的剪跨比、縱向鋼筋配筋率和配筋形式等,其中,配筋形式對鋼纖維混凝土厚承臺承載力的影響是很顯著的。
  17. Bearing capacity and settlement of super large pile - cap and pile foundation were thoroughly analyzed with numerical analytical results validated by centrifugal model test

    在用離心模型試驗成果驗證數值分析的正確性下,用其數值分析成果進一步深入分析群樁基礎的承載變形特性。
  18. Construction of pile cap at yuen long highway

    位於元朗公路的樁帽工程
  19. Construction of pile cap at ngau hom shek

    位於鰲?石的樁帽建設工程
  20. The load of the foundation of pile - cap related with not oniy the load of upper structure, the strength of material, the style of structure, the rigidity of pile etc., but also the variable soil, as forms a cornplex system

    樁基承臺的受力不僅與上部結構荷載、材料強度、結構形式、基樁的剛度等因素有關,而且受千變萬化的地基土質的制約,形成了一個非常復雜的體系。
分享友人