carrying cable 中文意思是什麼

carrying cable 解釋
運輸索
  • carrying : adj. 1. 裝載的。2. 運送的,運輸的。n. 1. 運送,運輸。2. 【紡織;印染】墊紗,給線。
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  1. The cable crane is a sort of special hoisting machinery, which uses flexible cable hung between two fulcrums as carrying structure, makes use of the crane carriage moving over the carrying cable to work, and hold the ability of vertical transporting and horizontal transporting

    纜索起重機是一種以懸掛于兩支點之間的柔性鋼索作為大跨距承載結構、利用載重小車在其上往返移動進行工作、兼有垂直運輸和水平運輸的特種起重機械。
  2. It is inevitable that some crane ' s parameter such as working temperature, actual span and so on will change because of the affection of install precision, the change of working condition and actual needs. as a result, it will affect the tension force of carrying cable and carrying capacity. and the tension force and carrying capacity have close relation to the performance of cable crane and operational security

    由於纜索起重機工作環境和性質的特殊性,安裝精度的影響、工作環境的變化以及實際工作的需要,不可避免的會引起的各項參數的變化,如工作溫度,實際的跨度等,造成與設計參數之間的差異,從而影響承載索的張力和承載能力,因而直接關繫到起重機的性能和生產的安全性,因此論文研究這些因素變化對張力和承載能力產生的影響,分析張力及承載能力對各因素變化的靈敏度,從而對生產實踐和安全生產作出有意義的指導。
  3. The kap shui mun bridge is the world s longest cable - stayed span carrying both road and railway

    汲水門大橋是世界上最長的一條兼有鐵路和行車路的鈄拉橋。
  4. There must be a marine casualty happened every 4 days before 1984, the amount of marine casualty happened at this area corresponds to 1 / 7 amount of the whole changjiang " marine casualty, so mariners gave it a name as " mouth of tiger ". due to the specific geographical condition and the extremely representative vessel traffic management of changjiang yingongzhou channel section, many intelligent people began researching and practicing the vessel traffic management of this changjiang " s down - stream complicated channel section from 1980s, at dec 15th 1984 the authority at that time - changjiang yingongzhou channel section previously ; up to the last years of 1980s ministry management administration applied traffic control on changjiang yingongzhou channel section previously, up to the last years of 1980s ministry of communications assigned shanghai marine college, shanghai ship & shipping research institute and changjiang harbor superintendence administration to make feasibility demonstrate about modern vts of zhenjiang traffic control section ; in 1990 dasha radar station which is the first radar vts station with inner river was finished, groped a new way for applying modern radar traffic control of vessel traffic management ; in 1997 the vtms of changjiang " s down - stream from nanjing to liuhekou was completed with connecting net and came into operation formally, meanwhile the signals of dasha radar station were conveyed to vts center by light cable, and then united applying vessel traffic management upon the whole authorized area ; in jun 2001 jiangsu msa made changjiang yingongzhou channel section as the first experimental group of creating " civilized, safe, passable channel activity, updating dasha radar antenna and receive - transmitter building closed - circuit television monitor system, setting uo safety warning board, starting navigational route reformation, carrying out united construction

    1984以前這里平均每四天就發生一起海損事故,事故數占整個長江的1 7 ,被行船人稱為「老虎口」 。長江尹公洲航段緣其極為特殊的地理區位條件和極具代表性的船舶交通管理,從上個世紀八十年代初就有識之士開始了這個長江下游最復雜航段的船舶交通管理探索和實踐。 1984年11月15日當時的長江航政管理局在長江尹公洲水域率先施行交通管制;到八十年代末交通部委託上海海運學院、上海船舶研究所和長江港監局聯合開展鎮江交通管制段建立現代化交管系統的可行性論證; 1990年大沙雷達站? ?內河第一座雷達交管站建成,摸索實施現代化雷達交管的船舶交通管理新途徑; 1997年長江下游南京至瀏河口船舶交通管理系統建成聯網投入正式運行,同時將大沙交管雷達信號通過光纜傳輸至交管中心,統一實施全轄區船舶交通管理; 2001年6月江蘇海事局將長江尹公洲航段作為第一批創建「文明平安暢通航段」活動試點航段,更新大沙雷達天線和收發機,著手閉路工業電視監控系統建設,設立安全警示牌,啟動航路改革,開展聯合「共建」 。
  5. The lantau link comprises the cable - stayed kap shui mun bridge and, of course, the spectacular tsing ma bridge, the span of which measures 1, 377 m, that making it one of the longest suspension bridge in the world carrying both road and rail traffic

    青嶼干線由斜拉索結構的汲水門橋及宏偉壯觀凈跨度為1 , 377米的青馬大橋組成。青馬大橋更是世界上最長的道路鐵路兩用吊橋之一。
  6. 5 for cargo lots over 1, 000 m / t each, or any other lots less than 1, 000 metric tons but identified by the buyer, the seller shall, at least 10 days prior to the date of shipment, inform the buyer by telex or cable of the following information : the contract number, the name of commodity, quantity, the name of the carrying vessel, the age, nationality, and particulars of the carrying vessel, the expected date of loading, the expected time of arrival at the port of destination, the name and telex of the carrier

    一次裝運數量超過1000噸的貨載或其他少於1000噸但買方指明的貨載,賣方應在裝船日前至少10天用電傳或電報通知買方合同號、商品名稱、數量、船名、船齡、船籍、船隻主要規范、預計裝貨日、預計到達目的港時間、船隻公司名稱和電傳。
  7. A roadworks for the remaining phase of the northwest tsing yi interchange with the lantau link ; a long span cable - supported ting kau bridge carrying a dual three - lane carriageway over rambler channel

    B興建以拉索橋設計的汀九大橋,設有一條雙程三線的分隔行車道架于南巴勒海峽之上
  8. The hfc network features fiber optics on the backbone but fdm in the transmission part. the wiring part comprises the coaxial cable system of tree topology for carrying and distributing information to user terminals

    Hfc主幹系統使用光纖,採取頻分復用方式傳輸多種信息;配線部分使用樹狀拓撲結構的同軸電纜系統,傳輸和分配用戶信息。
  9. At about 9 am, a 39 - year - old woman and her 59 year - old mother were hiking at a trail near a high voltage cable pylon in lion road hill. two men carrying rucksacks on their backs approached them from behind. one of them grabbed the neck of the 59 - year - old woman while another culprit

    今早約九時,一名三十九歲女子和她的五十九歲母親在獅子山行山,當行至山頂近一個高壓電塔的小路時,有兩名男子從后出現,其中一人箍著五十九歲女子的頸部,另一人則截停三十九歲女子。
  10. Cable current carrying quantity was calculated under this special condition

    對此種特定條件下的電纜進行了載流量計算。
  11. In addition, the analysis and test for the entire stability and limited carrying capacity are completed and results show that pingsheng bridge is also safe enough. 4. the influence on the static performance for pingsheng bridge of structural parameters, such as rise - span ratio of main cable, stiffened girder rigidity, main tower rigidity and main cable rigidity, is studied

    對平勝大橋和與之具有相同結構參數的地錨式懸索橋模型進行了動力特性分析,並研究了主纜矢跨比、恆載集度、加勁梁剛度、主塔剛度、主纜抗拉剛度、吊索抗拉剛度等結構參數變化對兩類懸索橋動力特性的影響。
  12. After the goods are completely loaded, the sellers shall notify, by cable, the buyer of the contract number, name of commodity, quantity, gross weight, invoice value, port of destination, name of the carrying vessel and the date of sailing

    貨物裝船后,賣方應立即將合同號碼、商品名稱、數量、發票金額、目的口岸、船名、開航時間電告買方。
  13. The current - carrying capacity of fire resistance and flame retardant pvc insulated wire and cable is same as that of ardinary wire and cable

    防火阻燃型聚氯乙烯絕緣電線線纜載流量和普通電纜相同。
  14. By analyzing a monofilament cable, it is presented the conclusions that the influencing factors of the load - carrying properties of flexible supporting s stem include the initial prestress the diameter of tension rod or cable, the rise ratio and the height of the structure etc

    通過對單根拉索結構的力學分析,提出影響這種結構剛度和承載性能的因素主要包括:初始施加預應力的大小、拉桿(索)的直徑、結構的腹高比以及結構的高度等。
分享友人