cast-in -cantilever method 中文意思是什麼

cast-in -cantilever method 解釋
懸臂澆築法
  • cast : vt (cast; cast)1 投,扔,擲,拋。 ★此義動詞通常用 throw cast 只用於若干特殊句子。2 丟棄,拋棄;...
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • cantilever : n. 1. (橋梁的)懸臂,肱梁;支架。2. 電纜吊線夾板;紙條盤。
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  2. Practical design method for large - diameter cast - in - situ piles with enlarged bases in wet - collapsing loess

    濕陷性黃土地區大直徑挖孔擴底灌注樁實用設計方法
  3. Accident case of under water board cast - in - situ pile as well as the analysis of static pressure settlement method

    水下鉆孔灌注樁事故實例及靜壓法處理方法分析
  4. Standard test method for compressive strength of concrete cylinders cast in place in cylindrical molds

    在圓柱模型中現場澆注混凝土圓柱體的抗壓強度標準試驗方法
  5. The method for design thin - wall core box cast - in - site concrete hollow floor using common structural computing software is put forward and the scale for the magnifying stiffness coefficient of the spandrel beam and middle beam is discussed

    5 、提出了採用常用的結構計算軟體計算薄壁箱體現澆混凝土空心樓蓋設計的方法,提出了邊梁和中梁剛度放大系數的建議。
  6. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  7. Method to evaluate pile capacity precisely by using the coefficient of cleaning slime and coefficient of construction process and by controlling the total duration of construction is proposed herein after analyzing the influences of slime at pile bottom, thickness of mudcake by the side of pile, shape of hole wall, time of construction and construction process on the bearing capacity of large diameter cast - in - place pile

    本文通過分析樁底沉渣、樁側泥皮厚度、孔壁形狀、成樁時間及施工工藝等對大口徑灌注樁承載力的影響,提出了在樁承載力計算中引入清底系數及成樁工藝系數,並控製成樁總時間以較準確地評價單樁承載力的方法。
  8. Summary on installation method of working platform for construction of cast - in - place viaduct girder in urban transit system

    城市軌道交通工程高架線路現澆梁施工作業平臺搭設方法總結
  9. This paper mainly makes the research of construction method for cast - in - situ concrete box girder of continuous girder bridge, using assembled highway bridge steel truss ( often known as bailey truss ) as the falsework, technical schemes for the falsework erected over river, particularly the rigid slant supports of the falsework on piers, and analysis, calculation methods and deformation of the falsework in accordance with the related tests in field

    摘要主要研究了採用裝配式公路鋼橋桁架(通常稱為貝雷架)做為支架進行連續梁橋現澆箱梁混凝土的施工方法;研究了跨河施工支架的技術方案,特別是施工支架在橋墩上的剛性斜撐,同時結合現場試驗研究了施工支架的分析計算方法及變形。
  10. Cast - in - site concrete hollow floor has been used widely in china. but its design method is not very mature

    現澆混凝土空心樓蓋是一種新型結構,在我國已得到廣泛的應用,但它的設計計算方法還很不成熟。
  11. Applied to cast - in - situ pile, the technology of pressure grouting under pile ' s tip can increase pile ' s bearing capacity largely and the utilization ratio of material, and decrease its settlement. furthermore, this technique is better adaptable to various soil stratum and can make magnificent economic efficiency with simple facilities and construction method

    樁端壓力灌漿技術用於灌注樁,能大幅度提高承載力,減小沉降,提高材料的利用率,並且設備簡單,施工工藝不復雜,經濟效益顯著,對各種地層有較好適應性。
  12. By using the calculating method of the flat - plate floor, the bend moments of the slab in different place are calculated. the moment distribution ratio between the column trip and the middle trip of the cast - in - place reinforced concrete hollow flat - plate floor calculated by the equivalent frame method is demonstrated. the moment of the cast - in - place reinforced concrete hollow flat - plate floor calculated by the experience coefficient method is also demonstrated

    進而將無梁樓蓋體系的計算方法應用於現澆空心板無梁樓蓋中,通過對板格彎矩的分析,得出了現澆空心板無梁樓蓋按等效框架法計算的板帶彎矩分配比例系數,按經驗系數法計算的板帶彎矩設計值。
  13. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場試驗、力學數值分析和有限單元分析,對巖溶地段鉆孔灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及嵌巖深度等方面作一些探討性研究,為該工程的設計和施工積累經驗,並為該類課題的進一步研究奠定了基礎。
  14. Based on plate loading test in - situ, the method of geddes " formula, finite element method and the relative theory of method of code, the paper makes a thorough study on the bearing capacity and settlement of vertically loading cast - in - situ piles with expanded branches and plates, and the major results are as follows : ( 1 ) based on the results of plate loading test in - situ, the single pile settlement behavior is analyzed. it is pointed out that its load - settlement ( q - s ) curve as tardy deformation

    本文結合現場靜載荷試驗、 geddes公式法、有限元法和《規范》法中的有關理論,對擠擴支盤樁在豎向荷載作用下的承載力及沉降進行了研究,主要表現在以下幾方面: ( 1 )在現場靜載荷試驗結果的基礎上,分析了擠擴支盤樁單樁沉降特徵,指出其荷載沉降( q s )曲線為緩變形。
  15. On the basis of the theoretical analysis and the finite element calculating, the conclusions show that the cast - in - place reinforced concrete hollow flat - plate floor should adopt the calculating method of the flat - plate floor

    通過理論分析和有限元計算,本文認為現澆鋼筋混凝土空心板無梁樓蓋應按無梁樓蓋體系的設計方法進行結構計算。
  16. From the point of kinematics and dynamics, the author analyses the propagation rules of stress waves in concrete, namely time - space relations, wave amplitude attenuation, dispersion effect and characteristics of transmission of reflected waves and acoustic waves. combining with engineering practices, the author also concluded the main points of low strain detection of integrity of longdiameter underwater cast - in - situ piles, and pointed out that comprehensive and relational utilization of reflected waves method and acoustic wave transmission method can accurately evaluated the integrity of pile shaft and then improve the reliability of detection. 6figs., 3refs

    從運動學和動力學角度,分析應力波在混凝土中的傳播規律:時空關系、波幅衰減、頻散作用以及反射波與聲波透射的特點,結合工程實踐,總結大直徑水下灌注樁低應變檢測的工作要點,指出綜合、合理運用反射波法與聲波透射法,可以較準確地評價樁身完整性,提高檢測結果的可靠性.圖6 ,參3
  17. ( 5 ) according to the relative theory of method of code, and connecting the project, compiling computer program, settlements of the pile groups for cast - in - situ piles with expanded branches or plates are carried out and analyzed

    ( 5 )利用《規范》法中的有關理論,結合工程實例,編制了計算機程序,對擠擴支盤樁群樁的沉降進行計算和分析。
  18. Abstract : the paper puts forward a strengthening plan of defective cast in - place short pile through quality accident analysis. the properties of no shrinkage and high mobility concrete, and its aplication for short pile strength are discussed. result for strengthening is ascertained by measuring. an effective method is given for this case

    文摘:本文就缺陷性鉆孔灌注短樁基礎進行了質量事故分析,提出了加固方案,評述了無收縮高流態混凝土的性能及其在加固中的應用,並對加固的效果進行了檢測,為特定條件下的類似短樁的加固處理提供了實例。
  19. In order to construct the bridges successfully, an exact analysis must be carried out in every construction step. yongan bridge is a cable - stayed bridge of tri - tower with single cable plane. integral cast - in - place construction on form board method is used in construction

    因此,有必要對該橋的整個施工過程進行詳細的研究,合理安排橫梁預應力筋和斜拉索的張拉步驟及張拉量,以指導該橋施工。
  20. ( 4 ) by using finite element method, the settlement and stress distributions both cast - in - situ piles with expanded branches or plates and common concrete bored pile have been comparied. the main differences are pointed out, which may be useful for pile design

    ( 4 )用有限元法對擠護支盤樁和直樁的沉降、應力分佈進行分析,指出它們應力分佈的異同點,這有助於樁的設計。
分享友人