casting bridge 中文意思是什麼

casting bridge 解釋
出鐵場棧橋
  • casting : n. 1. 投,擲。2. 【冶金】鑄造;鑄件。3. 【動物;動物學】脫棄,脫落物〈如毛、皮等〉。4. 計算。5. 想法,手法。6. (木材等的)翹曲。7. 【戲劇】配角。
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. Casting of bridge slab of po shek wu road flyover

    在寶石湖路天橋澆築橋板
  2. Statistical analysis of live load on continuous beam bridge of cantilever casting during construction

    懸澆連續梁橋主梁施工活載統計分析
  3. The 35n12 series products ( commonly called as widenning 153 ) are the alloy gray casting iron brake drum that our company and bridge limited company of the east windmill jointly developed, it has such a series of superior performance as wear - resisting decreasing, heat resistant splitting, high strength, balances well, dispels the heat fast, longe - livedding, etc., formed a complete set extensivly and original packaging on a lot of domestic famous luxurious motor buses ( the occupation rate of market above 70 % ), for example it is gold for dragon, the coherent in space, ann triumphant, fei shen, daewoo, the capital, tai hu, it is the wild for japan, in majestic, the changjiang river, explaining fertile

    35n12系列產品(俗稱加寬153 )是我公司與東風車橋有限公司聯合研製開發的合金灰鑄鐵制動鼓,它具有耐磨損、抗熱裂、高強度、平衡好、散熱快、壽命長等一系列優越性能,被廣泛原裝配套于國內許多著名豪華大客車上(市場佔有率在70 %以上) ,比如金龍、宇通、安凱、沈飛、大宇、京華、太湖、日野、中威、長江、申沃等。
  4. The riveting and welding plant of the company has a very strong technical force, the technical personnel makes up more than 1 3 of the total staff, the company can also undertake the manufacture of various metallurgical structural equipment, formwork, gang board, oil tank, water tank, pipeline and dust - collecting and environmental protection equipment of various sizes, the company also undertakes the construction of bridge, concrete building as well as underwater and high - altitude operations from omniberaing etc. no matter what sizes and shapes of the forging and casting spare parts including special - shaped parts, we will never refuse you and promise to satisfy you with best quality and finish the task on schedule

    公司鉚焊廠,技術力量十分雄厚,工程技術人員,佔全體員工的三分之一以上,可以承攬加工各種金屬結構設備模板跳板油罐水罐管道工程各種型號除塵環保設備,再如橋梁鋼筋混凝土建築,水下高空全方位作業等,除些之外,關于鑄造鍛造等工作不論大,中,小型部件,也能做到來而不拒,保證,保質,保量按期完成任務。
  5. Continuous rigid - framed and box - typed bridge of middle span. according to the wording feature of pc. continuous rigid - framed bridge in cantilever casting construction, every kind of temporary measurement has been analyzed

    中等跨度預應力混凝土箱形連續剛構橋橋跨布置時,為方便施工及減小主橋橋長,邊跨跨徑在無特別要求的情況下,可考慮選用較小的邊、中跨比例。
  6. The box girders of the main bridge of wuhan tianxingzhou changjiang river rail - cum - road bridge were constructed by the girder casting method by three types of slide shuttering forms

    摘要武漢天興洲公鐵兩用長江大橋正橋箱梁使用了3種移動模架制梁法施工。
  7. Especially, some new advanced techniques such as integral casting concrete, integral sliding formwork are firstly applied in this project in china. a new style bridge girder erection machine which can lift a piece of box girder weighting 300 tons once was designed and manufactured successfully

    特別是本工程首次採用的一次性整體澆灌混凝土工藝、整體滑動模板設計、以及300噸拆裝式架設機的研製成功,為今後同類產品的施工提供了一些新思路和寶貴的實踐經驗。
  8. According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis

    根據掛籃前端牽索錨固點處的變形協調條件建立了掛籃上混凝土澆築過程中牽索索力的增加量,並推導了掛籃上混凝土澆築過程中的各主要工況下掛籃前端標高的計算公式,對文暉大橋掛籃上混凝土澆築過程中的牽索索力和掛籃前端標高進行了細致地控制,確保了混凝土澆築的順利進行,為整個主梁線形和索力的雙控打下了良好的基礎。
  9. 2. the random nature of load construction is analyzed. according to analyze various factors on change of reliability index, casting girder 、 construction live load 、 concrete intensity 、 wind load 、 construction distribution load deviation and basket falling, which influence on construction reliability of rigid frame bridge with high - pier and large - span, are obtained

    2 .研究了各施工荷載的隨機性,通過分析各種影響因素對可靠指標的變化程度,得到已澆梁段、施工分佈活載、混凝土強度、風載和施工荷載偏差以及掛籃跌落等對高墩大跨剛構橋施工期可靠度的影響。
  10. By contrasting curved bridge and straight bridge, influence of dead load and prestressing force on the stress in cantilever casting period of curved bridges is analyzed. in this paper, the controlling problem in construction phase is specially studied

    通過曲線箱梁橋與直線箱梁橋的對比,模擬計算並著重分析了施工階段自重、預應力等因素對曲線箱梁橋懸澆時應力的影響。
  11. Control of bridge floor in cantilever casting construction of t - type continuous rigid - frame box - beam

    形連續剛構箱梁懸澆施工橋面高程的控制
  12. It is suitable for : rc structure working such as bridge, road, airplane runaway, building, pre - casting, tar asphalt road, refractory material and etc

    適用: rc結構工程如橋梁道路機場跑道建築物預鑄結構柏油瀝青路面耐火材料等。
  13. Design of scarffold serving casting in situ continuous box girder of ramp bridge

    匝道橋現澆連續箱梁施工支架方案設計
  14. This paper mainly illustrates how the supervision engineers should exercise their effective quality control over the commercial concrete used for the shengmi bridge from aspect of determining the producers, suppliers, and supervising the process of production, transportation and casting of the concrete

    摘要主要敘述監理工程師如何從商品混凝土生產廠家的選用,商品混凝土生產過程,運輸過程,澆築過程的質量進行有效控制。
  15. Basing on wenhui bridge ( the cable - stayed bridge ), optimization of cable tension under dead loads, control of the course of cantilever casting concrete, and spatial analysis of the pylon and gird during construction were discussed in this paper

    本文以文暉大橋為背景,就恆載索力優化、懸澆過程式控制制及索塔和主梁分段施工過程的空間分析等問題進行研究。
  16. Postgraduate : pu liangtao supervisor : professor shang shouing senior engineer huang gang the research on influence of the post - casting section of continuous rigid bridge suffered vibration of train travelling is preseated in this thesis according to related project. based on theorize analysis, expriments of material properties and members under deformed vibration, verification of isolating and reducing vibration in building as well as construction technology and quality control, the effect of post - casting section suffered deformed vibration is studied thoroughly. through the analysis of 28 tests of shear strength with post - casting section under deformed vibration, the related laws are deduced. and the analysis of finite element method, the studies of quality control and construction technology are also completed

    通過現場測試、模型和試塊的模擬振動成型試驗、加載破壞試驗、理論分析、現場減振隔振試驗、施工工藝和質量控制等一系列全面、系統的研究工作,認真、深入地研究了現澆混凝土受火車行駛振動的影響,特別是在約束構件后澆濕接頭區段內現澆混凝土受火車行駛振動影響研究方面作出了開創性的工作,完成了振動使濕接頭區段受到彎曲變形影響條件下的構件模擬振動試驗、抗剪強度試驗。
分享友人