change in gauge 中文意思是什麼

change in gauge 解釋
直徑變化
  • change : vt 1 改變,變更,變換,變革。2 交換;兌換;把(大票等)換成零錢;把(支票等)兌成現金。3 換(車、...
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • gauge : n 1 規,量規,量器,量計,表。2 標準尺寸,標準規格;(金屬片等的)厚度,(槍炮的)口徑,(電線等...
  1. In this thesis, based on the structure trait of the gauge - changeable bogie, a gauge - changeable equipment whose structure characteristic is introduced in the ground is designed, and working principle of the gauge change equipment is expounded

    論文基於變軌距轉向架的結構特點,設計了一與變軌距轉向架相配套的地面軌距變換裝置。詳細介紹了軌距變換裝置各部分的結構特點,並對其工作原理進行了闡述。
  2. Besides, as crustal movement would affect sea level measurement, the hong kong observatory in co - operation with the lands department and hong kong polytechnic university has started to make measurement of the vertical ground movement at tide gauge stations, using satellite - based global positioning system techniques, since 2004. the data will support long term sea level change studies in future

    此外,由於地殼移動可能對海面水位測定有影響,香港天文臺與地政總署及香港理工大學合作由二四年起利用全球定位系統衛星技術,定期測量測潮站所在地殼的升降情況,支援日後本港長期海平面變化的研究。
  3. Mr yeung said, " regional climate change study is a key area of work of the hong kong observatory. " besides, as crustal movement would affect sea level measurement, the hong kong observatory in co - operation with the lands department and hong kong polytechnic university has started to make measurement of the vertical ground movement at tide gauge stations, using satellite - based global positioning system techniques, since 2004. the data will support long term sea level change studies in future

    楊繼興表示:研究本地區氣候變化是香港天文臺工作重點之一。此外,由於地殼移動可能對海面水位測定有影響,香港天文臺與地政總署及香港理工大學合作由二四年起利用全球定位系統衛星技術,定期測量測潮站所在地殼的升降情況,支援日後本港長期海平面變化的研究。
  4. Only change the gauge set & attachment which could use the binder of flat - bed machine to offer standard tape attaching. " covering, hemming & taping ", three basic fuctions in one m / c

    全能型機種:更換導具規格組,加裝輔助配件即可使用原平臺喇叭,產生標準包裝車縫。壓骨、折下擺、包邊三種功能合一的全能型機種。
  5. In course of the approaching excavation of underground works, the construction of new structure will change the mechanics case of existing structure and brings some bad influence, such as load bearing capacity of structure decreasing, structure breaking, or too much deformation of structure and construction gauge inroaded

    在地下工程近接施工中,新建結構物的施工會改變既有結構物的受力狀態,從而對其產生種種不利影響,如結構承載力下降、甚至破壞,變形過大侵入限界等。
  6. With negative pressure gauge, neutron instrument and monitor research for depth of embedment of groundwater, we can obtain the changeable regulation of the soil moisture change in field and moisture use efficiency in field at childbearing period ; in five irrigation water, every time all has deep seepage, and the soil all can reach to saturation ; in childbearing period, the mutual change relation of irrigation water and groundwater is active

    摘要通過負壓計、中子儀、地下水埋深監測研究,得出生育期田間水分變化規律及土壤水分利用效率; 5次灌水均有深層滲漏,土壤都能達到飽;在生育期間,土壤水和地下水相互轉換關系活躍。
分享友人