changed number signal 中文意思是什麼

changed number signal 解釋
改號信號
  • changed : 被改變的
  • number : n 1 數;數字;〈pl 〉算術。2 (汽車等的)號碼;第…,第…卷,第…期〈通常略作 No (復數 Nos ),用於...
  • signal : n 1 信號,暗號;信號器。2 動機,導火線 (for)。3 預兆,徵象。adj 1 暗號的,作信號用的。2 顯著的...
  1. Based on these models, a main - road traffic flow model with two speeds on one dimension is designed. this model simulate the situation of one road in the city, traffic lights placed on the crossing, using the computer simulation, firstly, in the case of synchronized traffic lights, we investigated the velocity and flow of the model when the initial density, the turning probabilities, the number of the traffic lights, the green to signal ratio and the period of the signal are changed, then we have advanced some meliorate measure to traffic flow ; secondly, in the case of the traffic lights " signal update delay in turn, we found the optimal matching between the period of the signal and the delay time of the traffic lights so as to the perfect velocity and the flow of the model are attained

    在此基礎上,建立了一維二速主幹道模型,該模型模擬了城市交通中一條主幹道的交通情況,在交叉口處設置紅綠燈,通過計算機模擬,首先,在交通燈信號同步更新的條件下,研究模型在改變車輛的初始密度、轉向概率、交通燈個數、紅綠燈信號的綠信比、紅綠燈信號周期等各種情況下主幹道的速度、流量的變化,根據模擬結果提出一些改善交通的有效措施;其次,在交通燈信號依次延遲更新的條件下,研究模型在參數道路長、紅綠燈綠信比、交通燈個數、車輛的初始密度給定的情況下找到紅綠燈信號周期和延遲時間的最佳匹配使得主幹道的速度、流量達到最理想的值。
  2. Secondllv in the 1 d random traffic flow model. the relation function between the correlation and the creation. disappearance. brake probabilities of the vehicles is presented. according to the statistical mechanical approach to the spatial correlation functions. the theoretical results agree with that of the computer simulation. thirdh. based on the bml model. a main - road traffic flow model with two speeds on two dimensions is designed. this model simulate the traffic situation of one main road and several branches in the cit traffic lights placed on the crossing. vehicles breaking ~ vhile running and turning to other direction while jamming. we investigate the ~ ' e1ocitv and flo ~ ~ of the model when the initial densitvthe brake and turning probabilities. the green to signal rati3. thc number of the branches and the period of the signal are changed. then the reasons causing all the kinds of phenomena are analvzed. finallv. we simulate the bml model using the method of lattice boltzmann which ~ vas brought out by liu mu - renand obtain the velocity - density graph similar to the previous result. the upper critical densiw above which there are oniv jamming configurations. and the lo ~ ver critical density below which there are only moving configurations are the same as before. the boltzmann function which is on the lattices shows the moving and jaxmning transition obviouslv. thus it proves the possibilit of this method on the traffic research

    接著,建立了和研究了二維二速的主幹道模型,該模型模擬了城市交通中一條主幹道,多條支道的交通情況,在幹道與支道的交叉路口設置紅綠燈,車輛在運行中可以有對突發事件發生反應的剎車,在發生堵塞時,路口的車輛可考慮通過轉向來緩解交通等各種實際情況的發生,給出了車輛演化的演化方程,並通過計算機模擬,研究模型在改變車輛的初始密度、剎車概率、轉向概率、支道數、紅綠燈信號的綠信比、紅綠燈信號周期等各種情況下支、主幹道車輛的速度、流量的變化,並分析在各種情況下交通狀況的成因,提出改善交通的有效措施。最後,在劉慕仁提出的用格子boltzmann方法研究一維決定論交通流的思路下,將此法推廣到對二維bml模型的模擬上,得到了與用以往方法的研究結果相類似的速度-密度圖線,且車輛從運動相到堵塞相轉變的上下臨界密度是一致的,同時分別給出車輛在處于暢通相和堵塞相時, boltzmann函數在格子上的分佈情況,進一步驗證了此法的可行性。
  3. In the digital ultrasonic flaw detectors, backward - wave signal is sampled and changed through the highspeed a / d converter, and we ' ll get a large number of datas. because datas are not all be used to draw testing curve, they must be compacted. lt is necessary to compress so much datas, so data - compaction instrument must be designed and used. here introduces the principle of data - compaction instrument, and designs a exclusive instrument using isp which may change compression point and automatically provide 1024 consecutive addresses of outside data storage unit

    在數字化超聲波探傷中,回波信號經高速a d采樣變換后,會得到大量的採集數據。但在探傷曲線的描繪中並不是用到所有數據,因此要對這些數據進行壓縮處理,這就需要用到數據壓縮器,這里介紹了一種應用在線可編程技術及器件實現對大量采樣數據進行快速壓縮的方法,並設計了一種新型的專用isp數據壓縮器,該壓縮器具有壓縮點數可調,可自動提供1024個連續的外部數據存儲單元的地址等特點。
分享友人