check circuit 中文意思是什麼

check circuit 解釋
檢查電路
  • check : n 1 (象棋)將軍( ),被將軍的局面。2 (突然的)妨礙[制止,阻止];停頓,挫折;【打獵】(獵狗聞不...
  • circuit : n 1 (某一范圍的)周邊一圈;巡迴,周遊;巡迴路線[區域];迂路。2 巡迴審判(區);巡迴律師會。3 【...
  1. This paper mainly aims at the characteristics of the hardware and software structure of the parallel computer on satellite, and has fulfilled researches of fault tolerant technique in three aspects of control theories and engineering : the first research of the system level fault - tolerant module is based on the system structure of the parallel computer on satellite, a kind of cold backup module and a kind of hot backup module for multiprocessor computer have been put forward. then the research of software fault tolerant technique which is based on the operate system named rtems has been carried, the mission level fault - tolerate arithmetic and the system level fault - tolerate mechanism and strategies based on the check point technique have been put forward, at the same time the self - repair technique of software which has used the technique of system re - inject has been studied. finally the technique of components level fault - tolerant based on fpga has been studied, a kind of two level fault - tolerant project which aims at the fault - tolerant module of the parallel computer on satellite has been put forward, and the augmentative of circuit that project design realization need is little, this project can avoid any breakdown of any part logic circuit of the fpga

    本課題主要針對星載并行計算機體系結構及軟體結構的特點,從如下三個方面進行了容錯控制理論研究和實踐工作:首先進行了基於星載多cpu并行計算機體系結構的系統級容錯模型研究,提出了一種多cpu冷備份容錯模型和一種多cpu熱備份容錯模型;然後進行了基於rtems操作系統的軟體容錯技術研究,提出了任務級容錯調度演算法以及基於檢查點技術的系統級容錯恢復機制和策略,同時研究了利用系統重注入進行軟體在線自修復的容錯技術;最後研究了基於fpga的部件級容錯技術,提出了對容錯模塊這一星載并行計算機關鍵部件的兩級容錯方案,實現該方案所需增加的電路少,可避免板級晶元以及fpga晶元內部任何邏輯發生單點故障。
  2. At the same time, the parameter monitoring circuit is designed to check the operational parameters of pharos that include voltage of power supply, operational current, based on lm339 voltage comparer, optical sensor and logical circuit

    以lm339電壓比較器為核心,結合光傳感器、邏輯電路等,設計出參數檢測電路,監測航標燈的電源電壓、工作電流等工作參數。
  3. The device sends out various random disturbance signals to the balancing valve circuit of the hydraulic system for the radial head check gate operating at the worst condition by using a computer

    模擬實驗裝置根據工況最為惡劣的弧門啟閉機液壓系統的平衡閥迴路製作,採用計算機隨機給出各種干擾控制信號。
  4. In the case of layout design, discussed the effect and application of the transistor matching in the circuits design deeply. demonstrated the circuit layout check by lvs design

    在電路的版圖設計方面,較深入地討論了晶體管的匹配在電路版圖設計中的作用和應用,通過lvs對電路的版圖檢查進行了具體說明。
  5. The filament circuit analysis and wrong check of the tem

    透射電子顯微鏡燈絲電路分析和故障檢修
  6. High - qualified designers and engineers of chaowei are able to provide various high - qualified design services such as ic software program, circuit board, product appearance, products structure, and product package, etc. the factories directly under chaowei have advanced production abilities including mould making, inection moulding, surface spray - painting, silk - screening, shift - screening, smt, welding and assembling, quartz clock core production, and quality check and assurance. chaowei held many design patents and utility model patents, at the same time, national clock and watch quality certification, national technical supervision bureau certification, usa fcc and astm security authentication, canada ic, and euro ce are achieved, the rich experience in oem and odm can ensure high quality products and professional service

    超維公司擁有一批高素質的專業設計師和工程師,有能力為國內外客戶提供包括ic軟體編程線路板設計產品外觀設計產品結構設計產品包裝設計等多方面高水準的設計服務超維的直屬工廠則擁有模具製造注塑成型表面噴漆絲印移印smt焊接裝配石英鐘機芯製造品質檢驗測試等先進的生產能力超維公司的產品擁有大量的外觀設計專利和實用新型專利,同時獲得了國家鐘表質量檢驗中心的合格證書國家技術監督局檢驗合格證書美國fcc認證和astm安全認證加拿大ic認證歐盟ce認證。
  7. Check and maintenance fault of analysis instrument circuit by simulation software

    用模擬軟體檢修分析儀表電路故障
  8. Manual check button can be used to test circuit

    手動檢查按鈕可用於電路測試
  9. The tests are used to check the button circuit

    有用於電路測試的檢查按鈕
  10. Hardware framework of the system is based on isa buses of general pc or ipc, including 12 _ bit multiplying d / a conversion, time interrupt, pulse receiving, zero check and on - off and warning circuit

    該系統硬體結構是基於普通pc機或工控機的isa總線而開發,其功能集12位dac轉換、定時中斷、脈沖接收、倍頻辨向計數、零點檢測及使能報警等於一體。
  11. Check the connection of control circuit shall be in accordance with drawings, the continuity of each circuit, and the insulation resistance against earth

    按電路圖檢查控制迴路接線正確,各迴路連續性試驗正確,對地絕緣電阻符合要求。
  12. After electric heating system is installed, check electrical insulation of all circuits. the insulation resistance between generatrix and shielding layer, core wires of series cable before connection at end not be less than 20 m. and then check if dc resistance of circuit is normal and phase resistance is banlance

    電伴熱系統安裝完工後,應逐路檢查系統的絕緣電阻:各種電熱帶母線與屏蔽層之間、串聯帶芯線尾端末短接前的各芯線間絕緣電阻均應不小於20m ;然後再檢查電熱帶直流電阻是否正常,三相電阻是否平衡。
  13. The indicator circuit fault analysis of engine fault check on crown car

    皇冠牌轎車發動機故障檢查指示燈線路故障分析
  14. Constitute the circuit checking regulation and spot - check it

    制定設備的巡迴檢查制度,並抽查落實情況。
  15. Design the configuration parameter of the electromagnets using magnetic circuit theory, and check the temperature increase of the electromagnet. and design a power device using igbt with electric and electron theory. it can supply the electromagnets excitation current which changes regularly on a given rule

    對于彎扭矩檢測系統,運用應變儀的原理,在試件上的合適位置加貼應變片並組成惠斯登全橋差動電路,檢測出實際加載在試件上的彎矩和扭矩的大小。
  16. The preparing work before test run : first organize test run guide group consisted of supply party, demand party and installation party to check the installed qualified equipment ( machine, electricity, liquid, gas ) in an all - round way to see that circuit, water - way, gas - way and oil - way are switched on ; that all fastener, bolts and nuts are tight ; that all lubricating points and cooling points are put in position

    試運轉前的準備工作:首先應組織有關(供方、需方、安裝)等單位參加的試車領導小組,對已安裝合格的設備(機、電、液、氣)進行全面的檢查,電路、水路、氣路、油路是否接通,所有設備的緊固件、螺栓、螺母等是否擰緊,各潤滑點和冷卻點是否到位。
  17. " wide range measure system of pulse convert circuit " is one of the supplemental test equipment on the product line of the air - to - air missile pl12, which is the important equipment to develop, product, check and accept the great range pulse transforming circuit board

    「大量程脈沖變換電路測試系統」是為空空彈pl12生產線上配套的測試設備之一,它是研製、生產和驗收大量程脈沖變換電路板的重要設備。
  18. Via this model, automatic identification of circuit and circuit defect of s - sbc are realized. the procedures to check for the existence of a crank in all types of s - sbm are found. the method of stationary configuration loop to solve the order of motion of s - sbm is presented

    基於此模型,實現了s - sbc迴路及迴路缺陷的自動識別,給出並證明了所有類型的s - sbm的曲柄存在條件及判斷方法;提出了解決s - sbm運動順序問題的靜止位形點環路法。
  19. Design on torque check circuit using for gear test bed

    電加載變速箱試驗臺轉矩的檢測電路
  20. The audio information is sampled and measured and coded by the dsp card. the process speed is quick. there are a filter circuit, a power check circuit and a range - frequency characteristic check circuit which are designed to check the system status

    在硬體上,採用dsp語音處理技術,由高品質的dsp2000音頻卡進行音頻信息的採集、量化和編碼操作,不但提高了音頻的質量,也提高了音頻處理的速度。
分享友人