check surface 中文意思是什麼

check surface 解釋
表面龜裂
  • check : n 1 (象棋)將軍( ),被將軍的局面。2 (突然的)妨礙[制止,阻止];停頓,挫折;【打獵】(獵狗聞不...
  • surface : n 1 表面;地面;水面;廣場,空地。2 外觀,外表,皮毛。3 【幾】面;切口;【航空】翼面。adj 表面的...
  1. Check the state of the straw separated : if the straw is seriously broken, the cylinder and the concave must be adjusted to lessen excessive threshing ; if the straw is complete and unbroken, the quantity of wind shall be increased to make the chaff on the sieve surface the state of floating or the opening of the chaffer shall be slightly increased to make the grain fall through the sieve

    檢查單個稻草的狀況:如果稻草嚴重受損,必須調節滾筒和凹面以減小脫粒過猛;如果稻草完好無損,則必須增大風量使得谷篩表面的廢渣飄浮起來,或者慢慢加大谷篩孔,使得穀物穿過谷篩。
  2. Meanwhile, an artificial imitation rainfall system was developed in order to study the characteristics of city underlying surface and make experimental check up about the relative appraising index, on which 200 rainfall experiments are made, analyzing the effect of rainfall intensity to the runoff of underlying surface ; the relationship between runoff permeability and unit factor of rainfall intensity and duration ; the effect of rainfall intensity, duration, soil moisture content, and temperature to the runoff permeability ; the relationship between rainfall quantity and runoff permeability, and make mathematical imitation to the expe rimental results, to find the mutual - relationships, and make discussion about the differences between equations of fit

    同時,為研究城市下墊面的產匯流特性研製了一套人工模擬降雨系統,並對相關評價指標進行了實測校驗。在此基礎上,進行了200多場降雨實驗,分析了雨強、歷時、土壤前期含水量、溫度、降雨量、不同下墊面和不同覆蓋度等對產匯流的影響,及各種因素對徑流系數的影響和相關性,建立了一定條件下歷時徑流系數,雨強徑流系數,流量徑流系數的函數模型。
  3. After being improved, the gear surface contact fatigue strength obeys weibull distribution and stress obeys normal distribution, the gear bottom bend fatigue strength and stress obey logarithm normal distribution, according to the relation of average safe rate and reliability, then the gear strength reliability design and check equations can be deduced

    將齒面接觸疲勞強度按威布爾分佈、應力按正態分佈處理,將齒根彎曲疲勞強度和應力均按對數正態分佈處理,再根據平均安全系數和可靠度之間的關系,推導出了齒輪強度可靠性設計和校核公式。
  4. Please also cross - check the actual surface visibility observations, such as those in the webpage on

    另亦可比對實際地面能見度觀測數值,例如
  5. High - qualified designers and engineers of chaowei are able to provide various high - qualified design services such as ic software program, circuit board, product appearance, products structure, and product package, etc. the factories directly under chaowei have advanced production abilities including mould making, inection moulding, surface spray - painting, silk - screening, shift - screening, smt, welding and assembling, quartz clock core production, and quality check and assurance. chaowei held many design patents and utility model patents, at the same time, national clock and watch quality certification, national technical supervision bureau certification, usa fcc and astm security authentication, canada ic, and euro ce are achieved, the rich experience in oem and odm can ensure high quality products and professional service

    超維公司擁有一批高素質的專業設計師和工程師,有能力為國內外客戶提供包括ic軟體編程線路板設計產品外觀設計產品結構設計產品包裝設計等多方面高水準的設計服務超維的直屬工廠則擁有模具製造注塑成型表面噴漆絲印移印smt焊接裝配石英鐘機芯製造品質檢驗測試等先進的生產能力超維公司的產品擁有大量的外觀設計專利和實用新型專利,同時獲得了國家鐘表質量檢驗中心的合格證書國家技術監督局檢驗合格證書美國fcc認證和astm安全認證加拿大ic認證歐盟ce認證。
  6. Before installation, carefully check and clear the surface of seal groove. radiate and crossing scoring, impression and other adhesive substances are inhibited

    在安裝前,應仔細檢查並清理密封槽表面,不允許有輻射狀,交叉狀劃傷、壓痕和其它附著物。
  7. Regularly check whether actions of inhalation, exhalation discs are flexible, and the sealing contact surface of leader and disc is damaged, if so, should be replaced immediately

    定期檢查吸入、呼出閥盤動作是否靈活,導桿及閥盤接觸密封面有無損壞,如有損壞應立即更換。
  8. The first one is based on the offset surface of subdivision model. through mapping the original mesh node by node, the offset surface is generated. it can get the interference free tool - path directly from the offset surface without complex interference check and process

    然後實現了兩種精加工刀具軌跡生成方法,一種是基於等距面的截平面法,通過點對點法向映射的方法生成遞歸分割曲面模型法向等距面,由該等距面生成無干涉刀具軌跡。
  9. To check the efficiency of the insulations, by varying the thickness, the width and the position of the insulations ( expandable polystyrene insulation layer ( eps ) ; polyurethane ( pu ) ) and the material of the roadbed surface in the calculation, the maximum thawed depths during the following 50 years on permafrost under the roadbed were simulated

    為了檢驗保溫材料的效果,計算時採用改變保溫材料聚苯乙烯板( eps )和聚胺脂板( pu )的厚度、寬度、埋設位置及路基表面條件,來模擬路基面下多年凍土季節最大融化深度在今後50年內隨時間的變化。
  10. 3 move the dew - point meter and immediately check up the inside surface of insulating glass have not any dew or frost

    3移開露點儀,立刻觀察玻璃試樣的內表面上有無結露或結霜。
  11. Surface treatment of metals. anodisation anodic oxidation of aluminium and its alloys. check of corrosion resistance

    金屬表面處理.鋁和鋁合金的陽極處理陽極氧化.耐腐蝕的檢驗
  12. This paper discusses elimination of disturbance, detection of air - raid shelter, check up of road surface and lining quality of channel and detection of karst cave

    文章針對消除干擾的方法、關于防空洞探測、關于公路路面檢測和隧道襯砌質量檢測、地下巖溶探測等內容進行了探討。
  13. Specifications for hydraulic surface - check type lubricating nipples for aircraft

    航空用液壓表面止動型潤滑脂嘴規范
  14. The unique pacific tilting disc check valve internal disc hanger not only eliminates potential leakage through external hinge pins, but because the hanger shelf is machined parallel to the seating surface, it allows adjustment of the disc / seat if seat repair is ever required

    獨特的美國太平洋翻轉式閥瓣止回閥內置閥瓣鉸鏈銷不但消除了穿透閥殼的鉸鏈銷可能出現的泄漏現象,而且由於經過機加工的支架平行於閥座表面,使得維修閥座時,能夠調整閥瓣/閥座。
  15. Preparation for construction : the surface of the under layer should be even and firm, and in accordance with the design requirement, without loose material and flaccid site, and need to reroll 2 3 times within full - width range of the subgrade with vibrating roller before the construction, as well as test the compaction and defecting, to check whether there is unqualified point in the soil base

    施工準備:施工前下承層表面要平整、堅實,符合設計要求,無鬆散材料和軟弱地點,施工前要用振動壓路機在路基全寬范圍內復壓2 3遍,同時進行壓實度及彎沉檢驗,檢查土基中是否有不合格點。
  16. Because of the uncertainty of the geological factor, the complexity of high slope project and the particularity of anchor cable project, after the slope is excavated, according to slope ' s stratum rock, weather degree, broken degree, split surface, slope body structure and moisture state, etc, check, analyse and judge reality synthetically, protect and strengthen and design dynamically the high slope, guarantee the stability of slope body and security structure

    摘要由於地質因素的不確定性,高邊坡工程復雜性和錨固工程的特殊性,待邊坡開挖揭示后,根據邊坡的實際地層巖性,風化程度、破碎程度、構造裂面、坡體結構和含水狀態等因素,綜合校核和分析判斷是否實際,對高邊坡防護加固進行動態設計,確保坡體穩定結構安全。
  17. Applicable to check the organic contamination on the surface of semi - finished pcb or finished pcb

    適用於半成品和成品的線路版表面有機污染的檢測。
  18. Refer to 6. 2, to check up whether the samples have fog, paint, or other filth at the inside surface, whether the glass and glue bar moved disorder

    3按照6 . 2觀察試樣的內表面有無霧狀、油狀或其他污物,玻璃是否有明顯錯位、膠條有無蠕變。
  19. Through check and inspection to the large pipe piles of zhejiang beilun power plant ' s pier, a lot of cracks were found in portrait and circle on the surface of prestressed concrete pipe piles which affect security and durability of the concrete structures directly

    摘要通過對北侖電廠碼頭大管樁的詳細調查與檢測,發現混凝土大管樁多處存在縱向裂縫和周向裂縫,直接影響碼頭混凝土結構的安全性、耐久性。
  20. By contrasting these simulative results, the experiments check up the forcing of heat flux and complex terrain to sea surface wind

    通過模擬試驗對比,以檢驗地形,感熱,潛熱對海面風風速、風向的強迫作用。
分享友人