check verification 中文意思是什麼

check verification 解釋
支票驗證
  • check : n 1 (象棋)將軍( ),被將軍的局面。2 (突然的)妨礙[制止,阻止];停頓,挫折;【打獵】(獵狗聞不...
  • verification : n. 1. 證實,證明,確定;核驗,驗證,核對;檢驗,校驗。2. 【法律】訴狀[答辯書]結尾的舉證說明。
  1. ; measurement of vibration immission - part 3 : test calibration and assessment of the vibration measuring instrumentation ; primary test, verification, intermediate test, functional check in situ

    振動干擾測量.第3部分:測量儀器振動試驗
  2. Check digit verification utility - this utility is used mostly by financial institutions that wish to verify / calculate the check digit of a routing / transit number on a given document

    這個工具主要為財政機構所使用,他們希望在一個給定文檔中的校驗/計算一個路由選擇/運輸線數字的校驗數位。
  3. Through reviewing and summarizing various study results, it can be included that the methods for calculating forest fire danger weather index conclude mainly three kinds, i. e. index verification check method, synthesis index method, and statistic regression method

    作者對近幾十年來國內外森林火險氣象指數的研究工作進行回顧和總結,得出廣泛應用的火險指數可以歸納為指數查對法、綜合指標法和統計回歸法等3種類型,究其原理和使用效果,各有優缺點。
  4. But majority of the productions lack for verification of correction or only check the local expressions during the modeling process, so causing the existence of the deadlock, livelock and other bugs in the model. it causes many problems directly during the dynamic execution of the workflow. so it is important that model and verify the workflow before running

    但由於大多數產品在產品建模過程中缺乏正確性驗證或僅進行局部的語法檢驗,造成工作流模型存在死鎖、活鎖等缺陷,這直接引發了工作流動態執行過程中的諸多問題,如任務不能完成、超期完成等。
  5. Without the check and balance by professional bodies specialized in opinion polling, and without the final " verification " of the public wish by popular votes, there is always the temptation for government to engineer public opinion in its so - called " consultation " process. 2

    兩次諮詢雖然事隔16年,但在沒有專業的民意調查組織及群眾的監督下,政府得以把玩民意,扭曲調查數據以達到其預期的諮詢結果。
  6. An significant symbol has been used to determine the technique of 3 - d discontinuities network modeling of rock mass is good or not, which is to check whether the model can reappear the reality situation of rock mass or not, in order to make the 3 - d network model to meet the need of the actual rock engineering, the methods to verify the result of the modeling are required, one of the method to be used is to compare the figures between the section of the numerical model and the sampling window of in - situ model, the second method to be used is verify the data set between the numerical model and field data, only if the verification obtained a good precision, then the model can be considered as a efficiency model, and it can be applied into the actual rock engineering

    摘要巖體隨機不連續面三維網路模擬技術成熟與否的一個重要標志就是最終的網路模型是否能夠較真實地再現巖體的實際情況,為了使三維網路模型的結果能夠真正地應用於實際工程,就必須對模擬的結果進行必要的檢驗,檢驗的辦法就是將模擬出的模型剖面圖形與原型測量窗口的圖形進行圖形對比,或者將原型的觀測數據與模型的測試數據進行數據對比,當這種檢驗達到精度時,模擬出的模型為有效模型,可以投入工程實際應用。
  7. Although the software specification described using natural language is easy to write and understand, its validity, integrality, non - ambiguity, consistency are hard to guarantee. the process of verification can only be done by manpower which is not normative and not rigorous. and the complexity of a lot of software has made it impossible to check the specifications artificially

    需求規格說明是需求分析階段的產品,我們通常採用的是未使用任何限制非形式化的自然語言進行描述,這種自然語言書寫的需求說明,雖然易於理解和使用,但難以保證其正確性、完整性、無二義性、一致性,驗證過程只能採用不太規范、不太嚴格的人工走查的方法進行檢查,稍微復雜一些軟體的需求規格說明的檢查,實際上已經超出了人工檢查的能力。
  8. Valves for water supply - fitness for purpose requirements and appropriate verification tests - part 3 : check valves

    供水閥門.目的要求的適合性和相應的驗證試驗.第3部分:止回閥
  9. One timing verification approach with the aid of the timing check system

    一種藉助時序檢測系統進行時序驗證的方法
  10. If it is not specified, or if the skip option is specified, there is no verification check of the media name

    如果未指定該選項或指定了skip選項,將不會對媒體名稱進行驗證檢查。
  11. Thirdly, the extended work to build a complete system is modelling and verification, which can maximize the performance of the system. error check of the states conversion is also finished in this step. for that, iec61499 standard based net condition / event system ( nces ) models are developed which fit in with the veda rules

    系統設計的后續工作是對系統進行建模和驗證,看看該系統是否符合最優化條件,是否存在執行上的狀態轉換錯誤等等,並在iec61499標準的基礎上,開發出一套適合於veda建模與驗證工具的功能塊網路條件事件系統( nces )模型。
  12. A second party ( not the author of the cmm check program ) shall perform the verification

    由第二個身份的人(不是做cmm測試程序報告的人)進行證明。
  13. Valves for water supply - fitness for purpose requirements and appropriate verification tests - check valves

    供水用閥門.對目的要求的符合性及合適的驗證試驗.止回閥
  14. The difference between an opinion statement and a verification statement is that for the former, experts in the field are invited to provide their opinions about the epr, whilst for the latter professionals are employed to validate and check the accuracy of reported claims and data

    意見聲明與核實聲明的分別,是前者會邀請業界專家就環保工作報告提出意見,後者則聘請專業人士核實及查核報告內容及數據是否準確。有些機構的報告可能同時涵蓋核實和意見聲明。
  15. Plain bearings - part 5 : check list for verification of oil tightness

    滑動軸承.第5部分:油密封性檢驗用檢查表
分享友人