clear acceptance 中文意思是什麼

clear acceptance 解釋
單純認付, 單純承兌, 絕對的承諾
  • clear : adj 1 (水等)清澈的,透明的;(天氣等)晴朗的,明凈的,爽朗的;明亮的,皎潔的。2 明白的,明了的...
  • acceptance : n. 1. 接受;驗收2. 答應,承認;(政黨候選人)接受提名。3. 【商業】承兌,認付(期票)。
  1. Science considers to make clear, the baby is to comparative to outside information of acumen, acceptance rate is quite rapid also

    科學研究表明,嬰兒對外界信息是相當敏銳的,接受的速度也相當快。
  2. In part 1, the author makes a brief review of its history and makes a clear - cut definition of encouragement. in part 2, the author analyses its positive and negative values from the aspect of value, pointing out its positive value lies in the efficiency to detect the specific crimes and its negative value lies in the possibility to infringe innocent persons. in part 3, the author discusses its justification, pointing out the line of its legitimacy should be drawn in that " the state cannot make a crime " and " the mixed approach " should be adopted in china, and its justification lies in " the need of investigation and the common acceptance of the society.

    本文寫作主要分為六個部分,第一部分主要準確界定誘惑偵查的概念,並簡單回顧了其歷史發展過程;第二部分從價值層面對誘惑偵查作了剖析,指出誘惑偵查的積極價值在於對特定犯罪的有效追訴,其消極價值在於其可能殃及無辜公民;第三部分,從合法性和合理性兩個方面對誘惑偵查的正當性作了分析,指出其合法性標準應採用「綜合標準」 ,其合法性底線在於「政府不能製造犯罪」 。
  3. Standard and methods of the quality acceptance on the basis of the code of construction project management by enterprises of construction industry ( gb / t 50326 - 2001 ) and unified standard for constructional quality acceptance of building engineering ( gb / 50326 - 2001 ). ( 2 ) to learn the development of project management information system now and project management information system now and the general principle to develop project management information system, to analyze the object, the make the technique words, the nature, the nature, the functions and the limitation clear. ( 3 ) to establish the database of the system with microsoft access97, which includes information table to keep the system in safe condition anal other tables

    論文的主要內容和成果有: ( 1 )依據《建設工程項目管理規范》 ( gb t50326 - 2000 )和《建築工程施工質量驗收統一標準》 ( gb50300 - 2001 ) ,本著施工質量驗收資料管理計算計劃的目的,對建築工程施工質量驗收的程序、標準、方法進行了研究分解; ( 2 )研究了建設項目信息管理系統( pmis )發展的現狀和開發的一般原則,對工程質量驗收資料管理系統的對象、目標、方法進行了研究分析,確定系統的技術用語、性質、功能、性能、限制和約束以及系統的運行環境等。
  4. Usually, before adhesion clauses were moved into a contract, there are two stages exist : a clear show of offer ' s stage and agreement of acceptance ' s stage, and the clauses can ' t be " abnormal clauses " and " conflict with individual promissory clauses "

    通常,格式條款須經要約階段的充分明示和承諾階段的意思合致才能訂入合同,且該條款不得為「異常條款」和「與個別約定條款相抵觸的條款」 。
分享友人