concrete lift 中文意思是什麼

concrete lift 解釋
混凝土層
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  • lift : vt 1 舉起,使升起,提起,抬起;提高;提升。2 使高尚;鼓舞。3 運送,搬運;空運 ( = airlift) 4 ...
  1. In the paper, not only such factors as reinforcing steel bar, various placing temperature of concrete in case of lift placements, lift thickness, time interval between lifts, the variation of elastic modules of concrete, heat of hydration, the temperature changes of environment but the effect of creep deformation and autogenous volume change on the temperature field and thermal stress field of reinforced concrete face - slab are considered

    本論文在分析中,考慮了鋼筋、混凝土分層澆築、入倉溫度、澆築層厚、施工間歇、混凝土彈性模量變化、水化熱發散規律、外界氣溫等因素的變化及混凝土徐變和自生體積變形等因素對面板溫度場和溫度應力的影響。
  2. Concrete has had a face - lift in recent years and is no longer its old forbidding grey self

    康克雷特近年來做過面部整容術,所以看上去再也不是以前那副老態龍鐘的難看樣子了。
  3. Especially, some new advanced techniques such as integral casting concrete, integral sliding formwork are firstly applied in this project in china. a new style bridge girder erection machine which can lift a piece of box girder weighting 300 tons once was designed and manufactured successfully

    特別是本工程首次採用的一次性整體澆灌混凝土工藝、整體滑動模板設計、以及300噸拆裝式架設機的研製成功,為今後同類產品的施工提供了一些新思路和寶貴的實踐經驗。
  4. This ship is a non - propelled fixed luffing 500t steel crane vessel. this vessel is mainly used to lift and hookup the concrete components, bridge blocks, mechanical electrical equipments for harbours, bays, quays and jetty

    建港304為非自航固定變幅式500噸鋼質起重船,主要用於中國南海沿海各港灣港口及內河碼頭和堤岸的混凝土構件橋梁機電設備等吊裝工程。
  5. Generally ship lift structure is consisted of two or four huge reinforced concrete tube towers and a single - story machinery building on the top of tube towers. because the tube towers is demanded to support the large loads, the lateral stiffness of tube towers is a few hundred times as solid as that of the top machinery building and cause the sudden change of the stiffness. this change would cause insentive seismic whipping effect of the top building. the aseismic methods are difficultly used to reduce seismic responses of the top building of ship lift structure. the feasibility of develop an intelligent vibration control system is explored in the paper

    這樣,在塔柱頂部鋼筋混凝土平臺就會產生側移剛度的突變。這種巨大的剛度突變會引起升船機頂部廠房強烈的地震鞭梢效應,使得升船機頂部廠房地震反應的控制就成為升船結構抗震設計中的關鍵問題之一。由於採用常規的結構振動控制方法難以較好地解決升船機頂部廠房地震鞭梢效應,因此這就為智能振動控制技術的發展和應用提供了可能。
  6. Abstract : this paper introduces the calculating methods, develops procedures in the research of the slip and lift displacement on the composite beam of steel and concrete, which lay foundation for the design of the composite beams

    文摘:介紹鋼與混凝土組合梁計算分析方法,建立其分析單元模型,研製計算分析程序,研究鋼與混凝土組合梁交接面的滑移、豎向掀起位移及連接件剛度變化對其影響等工作性能,為鋼與混凝土組合梁設計提供理論依據
  7. 1. after a series of comprehensive testing and structure analysis to various bridges on the guangshe, huning, jinqin, shenshan, jingguang. ln our opinion, the key problems of the railroad bridge are as follows : ( 1 ) bridge construction is not well at the request of the railroad train speed - lift, primarily because of low dynamic property of the horizontal frame ; ( 2 ) the bad liability of the bridges structure, concrete beam ' s horizontal plank coupling form ; the low capacity of some of the bridges

    在對廣深、滬寧、京秦、沈山、京廣干線上不同橋梁結構進行的一系列綜合試驗的結果分析后認為,我國鐵路橋梁目前存在的主要問題為:橋梁結構不適應列車提速的要求,主要反映為結構橫向的動力性能較差;橋梁結構的耐久性問題;混凝土梁的橫隔板聯結方式;部分橋梁承載能力不足。
  8. Last of article, uniting the concrete situation of the laboratory, a modification means to simulate the systematic unit of diesel engine power station more clearly is put forward ; along with utilizes fuzzy + pi ' s double model to lift the laboratory physics imitation system control performance means

    在文章的最後,結合實驗室具體情況提出了實現進一步逼真模擬柴油機電站系統裝置的改進方法;以及利用模糊+ pi雙模控制,提高實驗室物理模擬系統控制性能的方法。
  9. We need a hoist to lift the concrete blocks

    起重機的長臂與我們的手臂功能相同。
  10. Owing to multi - lift characteristics of rolled concrete dams, great efforts of calculative work should be taken for computing 3 - d temperature and stress fields of the dams

    碾壓混凝土壩是分層澆築的,這給大壩三維溫度場和徐變應力場全過程模擬計算帶來了巨大的計算工作量。
分享友人