cost precondition 中文意思是什麼

cost precondition 解釋
代價前置條件
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  • precondition : n. 前提,先決條件。vt. 1. 把…預先安排[準備]好。2. 預先處理。3. 使…先作好思想準備。n. -ing 預處理。
  1. Liquid - solid extrusion of composite material is a new kind of metal forming process, which has been developed in recent years with a promising practical application prospect for its simple working procedure, low cost and good workpiece performance. through a lot of experiments, the optimization and chosing method of key process parameters ( pouring temperature, mold warm - up temperature, impregnating pressure, impregnating time ) has been mastered. under the precondition of appropriate chosing these parameters, the effective control of extrusion velocity is the key of mading good workpiece. but the control of extrusion velocity remains a handwork, and it is heavily affected by such uncertainties as a handler ' s knowledge and skill about the process. in order to solve the problem, the automatic control of the extrusion velocity is studied, and a computer control system is also designed under existing condition

    通過大量實驗,已掌握了關鍵工藝參數(熔液澆注溫度、擠壓模預熱溫度、浸漬時間、浸漬力)的優化選取方法。在合理選取關鍵工藝參數的前提下,擠壓速度的控制是成形出質量良好製件的關鍵。但是,目前對于擠壓速度的控制仍停留在手動控制階段,利用該工藝制備管、棒材製件的成功與否受操作者對該工藝及其設備的經驗及熟練程度等不確定因素影響很大。
  2. In the paper, author mainly take part in the study work, which forecast the time of engine disassembly maintenance according to the engine performance, and present the prophase work for following finding the optimum maintenance cost time in safety precondition

    本文的作者主要從事的是對根據發動機性能預測下發時機的研究工作,並為后續在安全的前提下尋找一個送修費用最優時機提供前期工作。
  3. Multi - bore and lateral wells can improve the oil recovery efficiency, increase productivity and reduce cost. the reasonability and perfection of drilling engineering design are the key and precondition to drill lateral wells. the principles &, methods of type selection, optimum design of well trajectory, selection of sidetrack ways, design of drill strings &, drilling fluid and completion design are introduced in this paper

    從生產實際工作出發,論述了現行鉆井井史標準在貫徹實施中存在的問題,提出了應增加及改進修訂的一些項目內容,如填寫要求、鉆具、鉆頭、定向井及井控技術等,對井史標準的修訂及鉆井工藝技術信息資料的採集錄入存儲和利用,有一定的參考價值。
  4. The cost of computing is greatly cut down by using this model with the precondition that optimization accuracy of the whole system is guaranteed

    該模型在保證整體優化精度的前提下,使計算成本大幅度下降。
  5. Now in dire need of solving problem is how to reduce cost and storage funds in precondition of ensuring the quality of blending ore

    現階段原料場最急需解決的問題主要是如何保證質量的前提下,降低成本及庫存資金。
  6. So, this thesis studies the rapid cost estimation for mass customization with case - based reasoning and proposes corresponding model and arithmetic. base on studying and inheriting existing domestic and international achievement, this thesis ( 1 ) uses logic bom as the precondition and groundwork and introduces the case - based reasoning method ; ( 2 ) proposes double - level cbr model of rapid cost estimation ; ( 3 ) proposes a fuzzy similarity estimation method with the common form of case representation ( without rigid properties range ) in the cbr system and establishes the fuzzy similarity estimation model and general arithmetic ; ( 4 ) analyses examples with the theories and methods mentioned above

    本文在研究、繼承已有國內外研究成果的基礎上, ( 1 )採用邏輯bom作為本文研究的前提和基礎,並引入了基於案例推理的方法; ( 2 )建立了雙層基於案例推理的快速成本評估模型和通用演算法; ( 3 )應用案例描述的通用形式(沒有嚴格的屬性值域) ,在cbr系統中提出了一種模糊相似性評估方法,並建立了模糊案例相似性評估模型和通用演算法; ( 4 )運用上述理論與方法,進行了實例分析。
分享友人