critical path method 中文意思是什麼

critical path method 解釋
關鍵路方法
  • critical : adj 1 批判的,批評的;(在某方面)有鑒定力的 (in)。2 吹毛求疵的;愛挑剔別人的 (of about)。3 ...
  • path : path(ol )=pathological; pathology n (pl paths )1 (自然踏成的)路;路徑;(馬路邊上的)人行...
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. The critical path method was originally developed to solve scheduling problems in an industrial setting.

    關鍵路線方法最初的發展是為了解決一項工業安裝的安排問題。
  2. In an attempt to tackle the most common resource conflict problem of i - mes, a conflict resolution model that is based on multi - agent cooperation is proposed. from the perspective of conflict management full life circle, the problems of conflict checking, conflict analysis and conflict resolution are studied extensively. meanwhile a conflict analysis method based on program evaluation an review technique / critical path method ( pert / cpm ) is provided, which categorizes all kinds of resource conflict

    針對可集成製造執行系統最常見的資源沖突問題,提出了一種基於多agent合作的沖突消解模型,從沖突管理的全生命周期角度,詳細研究了沖突檢測、沖突分析、沖突消解等問題,提出了一種基於pert cpm的沖突分析方法,對各種資源沖突進行分類,並建立了相應的沖突消解策略及基於kqml的沖突消解規則。
  3. In this thesis, we use the random - matrix - theory to revise the following calculating methods : ( 1 ) the heat capacity and the spin susceptibility of the normal metallic small particles ; ( 2 ) the heat capacity of the conventional metallic small particles at the low temperature using the mean field approximation method ; ( 3 ) the heat capacity of the conventional metallic small particles at the vicinity of the critical temperature using the static path approximation method

    本文採用隨機矩陣理論,計算了: ( 1 )正常態金屬小粒子的電子熱容和順磁磁化率。 ( 2 )在平均場近似下,計算了超導金屬小粒子低溫區的電子熱容。 ( 3 )在靜態路徑近似下,計算了超導金屬小粒子轉變溫區的電子熱容。
  4. In this paper, monte carlo ( mc ) method is used in the research of distributing of construction duration and computation of time parameter of pert network. according to probability viewpoint, critical line and key degree of activity in the network are also defined. aiming at the limitation of application of the mc in large scale the network, the simplified computational method for the network is presented with quantum probability theory and composite method of path in network

    本文用mc ( montecarlo )方法研究了施工工期的分佈規律和pert ( programevaluationandreviewtechnique )網路的時間參數的計算;用概率論的觀點定義了pert網路主導線路和關鍵度;針對大型施工進度網路mc方法應用的局限性,採用線路合成方法,引進當量概率概念,提出了pert網路的簡化計算方法;根據工程搭接施工網路的特點,將其轉化為廣義pert網路,探討了其施工進度風險的計算。
  5. The realization of critical path method

    關鍵路徑法的實現
  6. Using “ logical effort ” method to analyze the circuit ’ s critical path, and choose the optimized size of transistors in theory by this method. then, using sta technique simulates and analyzes the circuit to optimize transistors size further, and the circuit optimization arithmetic based on sta is gained. results proved that the optimization strategy of combining theory and practice have better effect

    結果證明,這種理論與實際結合的優化策略具有較好的效果;三、典型條件下,所實現版圖關鍵路徑延時1 . 38ns ,平均功耗45 . 3mw ,版圖面積0 . 05112mm2 ,達到了較小的延時、功耗和面積;四、針對所設計的算術邏輯部件,研究了一種獨特的內建自測試方法,只需較少的測試向量就可實現該部件100 %的故障覆蓋率,具有很高的效率和較低的代價。
  7. 161 on our most projects critical path method ( cpm ) is used for scheduling

    在我們的大多數工程項目中都採用「統籌法」 (即關鍵路線方法,簡稱cpm )安排計劃。
  8. The computational risk of schedule is comparably small with the classical pert method, but it is effective to decide the critical path - method

    ( 3 )提出了用當量概率修正pert網路,計算進度風險的方法。
  9. Applying the theory of polygon expanding and shrinking, a new critical area calculation method for soft and hard faults is given. a total formula is presented by dividing vlsi interconnects into two parts, contacting and conducting path, to calculate its critical area. finally the effect of hard and soft fault of different size defect on circuits is given by calculating soft fault area of a 4x4 shift register

    本文基於多邊形膨脹收縮理論給出了一種新的軟、硬故障關鍵面積計算方法,該方法首先將vlsi中的互連線分成導電通道和接觸區兩部分,然後分別計算其軟、硬故障關鍵面積,最後將這兩部分相加起來得到總的軟硬故障關鍵面積。
  10. Cpm critical path method

    關鍵線路法
  11. Critical path method

    關鍵路徑法
  12. This paper introduces the designed engineering project as a special case to find the critical path method and discusses the main features in the anti - seismic design model

    對測試數據中判別出的結構低階自振頻率與有限元計算結果進行對比,分析誤差的合理原因。
  13. With the fast growing development of fuzzy mathematics, many new methods appear by the combination of fuzzy mathematics and other theory such as system engineering, operations research etc. this article will use several fundamental methods in fuzzy mathematics, including fuzzy clustering, fuzzy recognition, fuzzy critical path method and fuzzy comprehensive evaluation, to solve the fuzzy and indefinite problems in the course of investment control, progress control and quality control in construction supervision

    模糊數學的迅速發展給解決這類問題帶來了新思路,它同系統工程、運籌學等理論相結合是對大量熟知方法的擴展。本文引入模糊數學中的基本方法,包括模糊聚類,模糊識別,模糊網路和模糊綜合評判,對在建設監理投資控制,進度控制和質量控制中出現的模糊不確定問題建立數學模型並加以分析和研究,最終給出定量化的結果。
  14. It can reduce power dissipation dramatically. however, the leakage power severely increases because of the low threshold, so a simulated annealing algorithm is presented to adjust threshold in non - critical paths, while the threshold in critical path is still kept low to increase performance. this method can decrease leakage power by 100 times without speed penalty

    為了降低等待狀態的漏電功耗,本章提出了一種基於模擬退火演算法的雙閾值調節方法,對關鍵路徑上的器件採用較低的閾值以提高速度,而其餘器件仍然保持較高的閾值以避免過大的漏電流,將該方法應用於iscasbenchmark電路中,可以使漏電功耗基本保持不變,而動態功耗則大幅度降低。
  15. In this thesis, on the basis of method study on condition monitored and failure diagnosis, study on fuzzy condition monitored and failure diagnosis method on the basis of associative operation of fuzzy theory and pattern identification theory, critical path of using the method is creation fuzzy relative matrixes by using fuzzy condition monitored and failure diagnosis method, in the paper author make much study

    在研究狀態監測與故障診斷方法的基礎上,並對模糊理論與模式識別理論相結合形成了模糊故障診斷方法進行了研究,利用模糊診斷方法關鍵在於模糊關系矩陣的確定,本文對此作了一定的新探索。
分享友人