cross bracing 中文意思是什麼

cross bracing 解釋
剪刀撐系統
  • cross : n 1 十字架;〈the C 〉 耶穌受刑的十字架。2 〈the C 〉 基督教(教義,國家)。3 不幸,苦難;挫折,...
  • bracing : adj 使拉緊的;振奮精神的;爽快的。 bracing wire [cable] 拉索。 a bracing breeze 涼爽的清風。 the ...
  1. Personnel access through mid rails and cross bracing is not recommended

    不提倡人員通過中間隔檔和拉條進入。
  2. Regarding the rc beams subjected to concentrated load or even load and braced by bonding steel, an analysis is made on the relevant factors influencing maximum anchorage shear stress of steel sheet. the analysis is based on elastic theory and makes use of the formula for calculating anchorage shear stress of steel sheet. as indicated by the results, the maximum anchorage shear stress not only realtes to such parameters as height of cross section of rc beam and span but also relates to the thickness of adhesive layer, elastic modulus, thickness of steel sheet, and length of steel sheet. the present method will check maximum an chorage shear stress on the end of shear sheet so as to prevent rc beam from local damage. the present results will offer important reference for our country to further perfect bracing design by bonding steel method

    在彈性理論的基礎上,利用鋼板錨固剪應力計算公式,對在集中荷載或均布荷載作用下採用粘鋼加固的混凝土梁,分析鋼板錨固最大剪應力的有關影響因數.結果表明,最大錨固剪應力不但和混凝土梁的截面高度、跨度等參數有關,還和粘膠層厚度、彈性模量、鋼板厚度及鋼板長度有關.採用文中方法可以對鋼板端部最大錨固剪應力進行驗算,防止混凝土梁出現局部受拉破壞.研究結果為進一步完善我國粘鋼法加固設計提供重要的參考資料
  3. If the shear deformation of a bracing is considered to be small ( e. g., concrete core ) the bracing system was regarded as of flexural - type and if the flexural effect is considered to be small ( e. g. cross bracing in low rise frames ), the bracing system is regarded as of shear - type

    當支撐體系的剪切變形跟彎曲變形相比很小時,支撐就被認為是彎曲型支撐(比如支撐為高層建築中的混凝土筒體) ,當彎曲變形跟剪切影響相比很小時則認為是剪切型支撐(比如交叉支撐) 。
  4. Cross beam bracing

    橫梁聯接系
  5. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人