culvert section 中文意思是什麼

culvert section 解釋
涵洞斷面
  • culvert : n. 暗渠,陰溝;【電學】電纜管道;涵洞。
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. Culvert under high - stack soil is a ubiquitous phenomena in road constructions in mountain, self - compression of high - stack soil can not be ignored, soil pressure at the top of culvert is affected by many factors, including the height of high - stack soil, section size of culvert, width of the bottom of valley, grade of valley, property of filled soil, construction procedure and techniques

    高路堤下埋設涵洞是山區公路建設的一種較為普遍的現象,高路堤自身壓縮較大,不可忽視,涵洞頂部土壓力的大小又受很多因素的影響,包括填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工工序與工藝等。
  2. The facilities to be handed over to government or utility companies after completion of the construction works include the reprovisioning works for the tsim sha tsui fire station complex, the police post and the electricity substation, as stated in section 8. 4. 2 of the ifp, and the reprovisioning or modification works for some existing facilities within the development area, like the kowloon south no. 2 salt water pumping station and twin cell box culvert

    須在建築工程完成後移交政府或公用事業機構的設施,包括尖沙咀消防局綜合大樓的重置設施、警崗和電力支站(見發展建議邀請書第8 . 4 . 2節) ,以及發展區內一些現有設施的重置或改建工程,例如九龍南二號海水抽水站和雙管箱形暗渠。
  3. The requirements to retain, modify or reprovision the existing twin cell box culvert are provided in section 4. 4. 2 ( f ) ( ii ) of volume one of ifp and annex 4. 13 of volume two of ifp

    有關保留、修改或重置現有雙管箱型暗渠的規定,載于發展建議邀請書第一冊第4 . 4 . 2 ( f ) ( ii )節及發展建議邀請書第二冊附件4
  4. Fourthly, compared with calculate results for typical section of a culvert soft - base reinforcement project in the water way to sea of huaihe river engineering by the plane strain fem based on biot consolidation theory, measured data and simple calculation result, the simple calculation method proposed in this paper is proved to be reasonable and verified, and is more referenced by congener project

    ( )採用平面應變比奧固結有限元法對淮河入海水道某涵閘軟基加固工程進行了數值計算,通過對比數值計算結果、實測值及簡化方法計算結果,證明了本文提出的沉降計算簡化方法的正確性和適用性,所得結論對于同類工程具有一定的參考價值。
  5. The article is based on the eastern section of the mainline of hu rong national road, it put forward some feasible prevention ' s technology and measures directing against different type of engineering, which is based on the investigation and analysis to types and formation ' s cause of various engineering disease of highway ' s subgrade and pavement, structure of bridge and culvert and engineering along road. it evaluate the bridge safety by ahp and forecast the character changing with time of bridge structural defect by grey system theories

    本文以滬蓉國道主幹線東段為依託工程,在對高等級公路路基路面工程、橋涵結構工程、公路沿線存在的各種工程病害的類型與成因進行調查與分析的基礎上,針對不同類型的工程病害提出切實可行的防治技術措施,並用層次分析法評價橋梁結構的安全性和用灰色系統理論對橋梁結構存在的缺陷隨時間變化的性狀進行預測。
  6. For the needs of second - term project for pudong airport there is possibility to construct a tunnel of serving driveway under the operating runway, but it s obviously of great difficulty, and nowdays there are few such projects for reference, so it is urgent to carry out the research to make sure of the feasibility for the construction based on the analysis of geologic information, cross section of the line and restriction of construction, in this paper three construction schemes and the effects of each scheme were analysed : cut and cover method, pipe roof culvert box advancing method. shield driving method

    摘要浦東國際機場二期工程建設存在著在運營跑道下實施地下穿越的可能性,在運營跑道下實施地下穿越難度很大,而目前國內外軟土地區在跑道下實施地下穿越工程很少,因此論文通過研究分析了服務車道地下穿越跑道區域的可行性及方案。
  7. Any proposed diversion within wkcd should tie in with the diversion to be provided by kcrc at the upstream section ( single cell ) of the same culvert. proponents should liaise with kcrc in this regard

    如建議把西九龍文娛藝術區內的暗渠改道,須配合九廣鐵路公司日後就同一暗渠的上游段(單管)進行的改道。
分享友人