curtain control 中文意思是什麼

curtain control 解釋
遮光簾控制
  • curtain : n 1 簾幕;窗簾,簾子。2 (舞臺的)幕;啟[落]幕。3 幕狀物;(兩棱堡間的)中堤幕墻;【建築】隔壁,...
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  1. On the aspect of exterior decoration, it mainly designs, supplies and installs sorts of glass, glass 、 aluminium & granite curtain walls, horizontal sliding windows, sliding sash windows, skylights, canopies, etc ; on the aspect of interior decoration, sorts of metals, claddings, store seperating, lace trimmings, automatic 、 revolving & manual control doors, metal suspended ceilings, metal balerstrades, etc

    在外裝飾方面,主要從事各類大型鋁合金玻璃幕墻、鋁板幕墻,石材幕墻、平開窗、推拉窗、採光天棚、雨篷等;在內裝飾方面:從事各類金屬包復、商場玻璃隔斷、花飾、自動門、旋轉門、手推門、金屬吊頂、金屬欄桿等設計、生產、加工與安裝施工。
  2. It is suggested that the impervious wall combined with curtain grouting should be taken as the main vertical impervious body for seepage control, and that the full use of slope wash and fully weathered zone as horizontal impervious blanket should be taken to reduce work load for seepage control

    建議採取截滲墻結合帷幕灌漿作垂直防滲體為主的防滲措施,同時充分利用坡積土和全風化帶作為水平防滲鋪蓋以減少防滲處理工作量。
  3. Manufacturer of curtain poles and tracks, electric tracks, blind roller, water heater controller, remoted control window curtain and motorized window blind

    大博俊電子工程有限公司-燃氣熱水器,電熱水器,太陽能熱水器電腦控制器
  4. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  5. Introduction : pink fled series of articles room, searching for clues to escape the room ! operations guide : mouse control related tip : pillows : number two, the paper on a part of your bed : 4 under a bed two figures : nine figures a drawer chests : key figure 8, under disc drawer chests part 2 : a figure, daggers bins : digital 5, 7 stabbed demarcating the trash : figure 3. chests a key curtain : six figures, radio chests following : disk, in addition to the number 0 boxes of the other things shoul

    逃離房間系列粉色篇,尋覓線索來逃出房間吧操作指南:鼠標控制相關提示:枕頭:數字2 ,紙片上部分床底1 :數字4床底2 :數字9床頭櫃抽屜1 :鑰匙,數字8 ,紙片下部分床頭櫃抽屜2 :數字1 ,匕首垃圾桶:數字5 , 7用刀劃開垃圾桶:數字3 .床頭櫃1的鑰匙窗簾:數字6 ,收音機床頭櫃下面:紙片,數字0除了箱子里的東西其他的應該找全了
  6. Pink fled series of articles room, searching for clues to escape the room ! operations guide : mouse control related tip : pillows : number two, the paper on a part of your bed : 4 under a bed two figures : nine figures a drawer chests : key figure 8, under disc drawer chests part 2 : a figure, daggers bins : digital 5, 7 stabbed demarcating the trash : figure 3. chests a key curtain : six figures, radio chests following : disk, in addition to the number 0 boxes of the other things shoul

    逃離房間系列粉色篇,尋覓線索來逃出房間吧操作指南:鼠標控制相關提示:枕頭:數字2 ,紙片上部分床底1 :數字4床底2 :數字9床頭櫃抽屜1 :鑰匙,數字8 ,紙片下部分床頭櫃抽屜2 :數字1 ,匕首垃圾桶:數字5 , 7用刀劃開垃圾桶:數字3 .床頭櫃1的鑰匙窗簾:數字6 ,收音機床頭櫃下面:紙片,數字0除了箱子里的東西其他的應該找全了
  7. Independent air hating system, oven with sealed round hole array with hot air curtain, automatic oven temperature detector and control, dro, application of second time reflex of heat energy and centralize waste discharge result in energy and cost saving

    獨立的熱風加熱系統,密閉式圓孔陣列風幕式熱風乾燥烘箱,烘箱溫度自動檢測控制、數字顯示,熱能二次迴流利用,集中排廢裝置,有效地降低能耗、節約成本。
  8. Boring, grouting and finally forming an impervious curtain in the rock mass with cracks, that is one of the most popular methods of the foundation seepage control at hydraulic and hydroelectric engineering

    採用鉆孔水泥灌漿封堵巖體中的縫隙而形成阻水帷幕,達到減少滲漏量和降低滲透壓力的目的,是水利水電工程基礎處理的重要手段之一。
  9. The distance of the single - row curtain grout hole is between 1. 4 to 1. 8 meter, and 2. 0 meter is suitable for the double - row curtain ; the grouting pressure generally is 1. 0 to 1. 5 mpa at the first three grout compartment, then grouting pressure of under the fourth control in 4 to 5 mpa ; for mast grout compartments, a water - cement ratio of 2 or 1 may used in the first grouting

    鉆孔密度也由原來的0 . slm / mz降至o . 64n擴mz ,節約工程投資447 . 35萬元。 6 、單排帷幕的孔距在1 . 4一1 . 8m之間,雙排帷幕的孔距以zm為宜;灌漿壓力在地表以下前三段一般為1一1 . smpa ,第四段以下按4一smpa控制;對大部分孔段而言,開灌水灰比可定為2或1 。
  10. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  11. Application of dust - control technique withair curtain in continuous face

    連采工作面氣幕控塵技術的應用
  12. Application of air curtain on mine pollution control

    空氣幕控制礦內廢氣污染的研究
  13. This factory production wind curtain cabinet, exhibits thecabinet, the prepared food cabinet, the fresh meat cabinet, maintainsfreshness the cabinet, the supermarket convenience cabinet, ordersfood the cabinet, the beer cabinet, collection and so on leng gui, island cabinet, cold drinks bar, cold storage maintains freshness, therefrigeration is a body, its control element uses internationally, thedomestic name brand factory production, the chinese and foreign highquality name brand compressor, conforms to the country standingoperating procedure requirement

    本廠生產的風幕櫃陳列櫃熟食櫃鮮肉櫃保鮮櫃超市便利櫃,點菜櫃啤酒櫃冷櫃島櫃冷飲櫃冷庫等集保鮮冷藏為一體,其控制系統元件均採用國際,國內名牌廠家生產,中外優質名牌壓縮機,符合國家標準規定要求。
  14. “ jinhao ” brand window curtain developed the new and initiate patent in china. it is multi - functional product, such as, automatic gauze portiere and window curtain, flexible window screen and tele - control folding window curtain are all manufactured by shandong linyi jinhao automatic gauze portiere and window curtain factory

    山東臨沂金浩自動紗門窗廠(深圳研發中心)自行開發研製生產的? ? 「金浩」牌多功能自動紗門窗、隨意貼紗窗、折疊紗窗、遙控卷簾,均屬國內首創獨具特色的新型專利產品。
  15. Our company is the pointed manufacture that is authorized by shanghai fire control bureau to produce steel anti - fire rolling curtain

    公司是上海市消防局定點生產鋼質防火卷簾門的定點生產企業。
  16. It has been widely used in windows and doors, the glass curtain wall, incline daylight ceiling and so on all commercial and civil construction, such as in - door swimming pool, skating - rink and other place requires comfortable temperature, condensation control, uv and solar heat shielding, it can also be used as glass doors for such as high - end refrigeration show cabinet, freezing and cold storage equipment for medical

    廣泛應用於建築門窗、玻璃幕墻、斜面採光部位等一切商用及民用建築,如游泳館、室內滑冰場,或對溫度控制及防止結露、節能環保有很高要求的地方,如高級超市陳列櫃、醫療用冷凍冷藏設備。
  17. Construction and quality control of curtain grouting in foundation of dam for dalong water control project

    大隆水利樞紐壩基帷幕灌漿施工與質量控制
  18. Dk electric engineering co., ltd is a company dealing with remote control curtain, motorized windows treatment and solar water heater controller

    公司設計開發,監制生產的各類產品,嚴格按照iso 9001 : 2000的標準執行。
  19. Application of underground grouted seep control curtain technique to water - repellent construction of soil and stone cofferdams for bridge foundations

    地下錨固壓漿防滲帷幕技術在橋梁基礎土石圍堰防水施工中的應用
  20. Option for avx - 24 expansion unit ; which have control for electric curtain screen s power

    布幕開合燈光開關等,並可控制八組媒體設備之電源
分享友人