cut-and-cover method 中文意思是什麼

cut-and-cover method 解釋
明挖回填法
  • cut : vt (cut; cutting)1 切,割,截,斬,砍(樹),剪(發等);切斷,割下;採伐;剪下;修剪,刈。 I h...
  • and : n. 1. 附加條件。2. 〈常 pl. 〉附加細節。
  • cover : vt 1 覆蓋,遮蔽,包裹;戴帽子;包庇,隱蔽,掩蓋;滅跡,(用紙)表(墻)。2 孵(小雞);(種馬)交...
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. Cut - and - cover method

    明挖回填法
  2. Cityu has confirmed that the cut - and - cover method would be the most appropriate method for constructing the tunnels along salisbury road

    城市大學已確定明挖回填方式是建造沿梳士巴利道的一段隧道的最適當方法。
  3. The government spokesman said, " in fact, the cut - and - cover method would be more costly, lengthy and difficult for the kcrc contractor, as compared with bored tunnelling

    政府發言人說:事實上,對九鐵公司的承建商來說,明挖回填方式比鉆挖隧道方式更為昂貴,所需時間更長,而且難度更高。
  4. As regards the section of tunnels along salisbury road, it is necessary to construct it by the cut - and - cover method to avoid possible hazards to the adjacent buildings, the existing utilities and the very important mtr tsuen wan line tunnel along nathan road

    至於沿梳士巴利道的一段隧道,則有需要以明挖回填方式建造,以避免對毗鄰的建築物、現有的公用設施和沿彌敦道的一段極重要的地鐵荃灣線構成任何潛在的危險。
  5. This is why a special tunnelling machine capable of excavating through both soft ground as well as hard rock was used. without this machine, the tunnelling would have to be done by cut - and - cover method, causing major traffic and environmental disruption. with this tbm, all these impacts can be avoided

    故此選用這臺既可在軟土又可在硬石層運作的隧道鉆挖機,避免以明挖隨填的方法開鑿隧道,免卻對交通及環境造成嚴重影響。
  6. Cut and cover method

    明挖覆蓋法隧道
  7. Members noted that kcrc proposed to use bored tunnel instead of the cut and cover method for the construction of the ksl along canton road

    交諮會成員得悉九鐵建議以隧道鉆挖的方式,取代明挖隨填的方法興建途徑廣東道的九龍南線。
  8. For the needs of second - term project for pudong airport there is possibility to construct a tunnel of serving driveway under the operating runway, but it s obviously of great difficulty, and nowdays there are few such projects for reference, so it is urgent to carry out the research to make sure of the feasibility for the construction based on the analysis of geologic information, cross section of the line and restriction of construction, in this paper three construction schemes and the effects of each scheme were analysed : cut and cover method, pipe roof culvert box advancing method. shield driving method

    摘要浦東國際機場二期工程建設存在著在運營跑道下實施地下穿越的可能性,在運營跑道下實施地下穿越難度很大,而目前國內外軟土地區在跑道下實施地下穿越工程很少,因此論文通過研究分析了服務車道地下穿越跑道區域的可行性及方案。
分享友人