deck loading 中文意思是什麼

deck loading 解釋
分段裝藥
  • deck : n 1 甲板,艙板;覆蓋物。2 【建築】平屋頂;橋面;【鐵路】客車車頂。3 〈俚語〉地面,地。4 〈主美〉...
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  1. In the study of the lumber carrier, one of the very important problem is the in spot and ultimate station due to flooding which will bring tremendous threat to the ship because of the few holds in order to study the lumber carrier buoyancy, stability and longitudinal strength under the condition of flooding, the paper adopt fundamental ship principle and iterative and accumulative concept on the basis of insumersibility theory to detailedly calculate the flooding speed flooding amount front draft after draft stability and longitudinal strength considering the ship " s sinking and inclination which will change the center of gravity and the loading station both in hold and on deck and the effect of flooding and lumber amount in holdo in the last, the paper introduces an example of the actual ship named " fei yun ling " and makes a contrast between not taking measure and taking measure which draws a reasonable conclusion and comes up to some advice the method avoids the cockamamie calculating while insures enough precision the paper draws a conclusion that not all the lumber carrier will submerge when suffering the damaged flooding if the loading or measure is suitable

    為了研究運木船舶在破艙狀態下的浮性、穩性和強度,本文在抗沉性理論的基礎上,運用船舶基本原理,採用了迭代和累計的思想,將船舶的進水過程劃分為很多次進水的積累,詳細計算了運木船在破艙進水的過程中,考慮到各種破艙參數、船舶本身的下沉、艙室內木材、甲板貨的裝載情況和在進水過程中船舶本身的傾斜對進水重心的影響,以及艙室內的進水量和木材對破口處進水速度的影響,船舶總的進水速度、進水量、首尾吃水、穩性的實時狀態和最終船舶的總縱強度,給出了計算實例,並進行了在採取用泵抽水前後浮態參數的對比,得出了該船舶在艙室內的貨物積載量達到某個數值時可以保證船舶在破艙進水時不會沉沒,或者在當開口小於某數值時,採取適當的措施后,可以使船舶避免沉沒。
  2. If deck loading is specified, will the insurance rates be higher

    如果指定在甲板上裝貨,保險率是否會提高?
  3. Aircraft. connection of passenger loading bridge or transfer vehicle. interface requirements in the vicinity of main deck passenger doors

    航空.機場天橋設備.乘客登機橋或轉運車輛的連接.乘客登機主艙門周圍的界面要求
  4. Based on the background of a city key construction project 棗 hongshan bridge, the loading characteristics of the deck system consisting of mutirow cantilever in composite structure of steel and concrete is studied in the thesis

    本文以長沙市洪山大橋為工程背景,對組成橋面板系的多排懸臂鋼-混凝土組合梁的受力特點進行了研究和探討。
  5. The thesis is aimed at presenting a procedure to establish a baseline finite element model of the qingzhou cable - stayed bridge over the ming river, fuzhou, china that was newly constructed. its main span length of 605m is the longest in the world among the completed composite - deck cable - stayed bridge. the proposed procedure includes several tasks : initial finite element modeling base on the design drawings, field loading tests and ambient vibration tests, and finite element model calibration with the test results

    本文以主跨605m的結合梁斜拉橋? ?青洲閩江大橋為背景,首先根據設計圖紙建立該橋完整的初始空間有限元模型,然後根據通車前現場靜力試驗和環境振動試驗結果對初始有限元模型進行校正,通過參數的調整使模型靜、動力計算結果與實測值吻合。
  6. Stay cables of the long - span cable - stayed bridges are susceptible to vibration under wind loading, or wind incorporated rain excitation, or deck motion due to high flexibility, relatively small mass and very low inherent damping, such as vortex shedding, wake galloping, parameter resonance and wind - rain induced vibration. large - amplitude vibration of cables may reduce the life of cables and threaten safe traffic, and has been considered today as one of the most critical problems for this type of bridge

    大跨度斜拉橋拉索具有較小的質量和極低的阻尼,在風、風雨及橋面振動等外部激勵下極易發生振動,如渦激共振、尾流馳振、參數共振和風雨振等,拉索的大幅振動對拉索的使用壽命和橋梁安全運營構成極大威脅,它已成為大跨度斜拉橋急需解決的關鍵問題之一。
  7. Finite element analysis on flexural loading capacity of composite slim beam with deep deck in the hogging moment region

    負彎矩區深肋組合扁梁抗彎性能的有限元分析
  8. Where wheeled vehicles are stowed or used on insulated decks, when the permissible loading of decks is determined based on the thickness of decks, attention is to be paid to effect on insulated coating due to deck deformation

    例4 :如具有絕緣層的甲板上裝載或使用車輛,則在根據甲板厚度確定用板的允許載荷時,應注意甲板變形對絕緣層的影響。
分享友人