delay cost 中文意思是什麼

delay cost 解釋
等待成本
  • delay : vt 延遲,拖延,耽擱。 We ll delay the party for two week 我們要把會期延遲兩周。 The train was del...
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  1. Build - transfer - operate - private proponent finances and constructs facility on a turn - key basis assumes cost overrun, delay, specified performance risk

    -私營提議人在準備將其移交的基礎上籌措資金並建造該設施(包括承擔成本高出預算、工程延誤及質量保證等風險)
  2. 2 if a higher value of carriage is declared subject to the limits imposed on the value that may be declared as noted immediately below, fedex s liability for loss, damage or delay of a shipment will not exceed its repair cost, its depreciated value or its replacement cost, whichever is the least

    對該票貨件遺失損毀或延誤之賠償責任將不會超過其修理費折舊后之價值或其更換成本,並以較低價者為準。
  3. 2 if a higher value of carriage is declared subject to the limits imposed on the value that may be declared as noted immediately below, fedexs liability for loss, damage or delay of a shipment will not exceed its repair cost, its depreciated value or its replacement cost, whichever is the least

    按照以下申報貨件價值之限額而定,聯邦快遞對遺失損壞或延誤等所承擔的責任不會超過貨件修繕費用折舊后價值或更換費用取三者最低者。
  4. This thesis analyzes the reasons which result in delay and the main factors considered by ghp, such as the limited airports capacity, limited airways capacity, influence of successive flight and the cost of delay

    論文對地面等待產生的原因和實施地面等待所要考慮的主要因素,如:天氣狀況、機場容量限制、航路容量的限制、連續航班的影響、延誤成本等進行了分析。
  5. Simulated results showed that the proposed algorithm is available to construct effectively and quickly, the multicast tree satisfying delay constraint and lowest link cost, with network load balance taken into account to pick out the cheaper idle route

    模擬結果表明,該演算法在考慮網路的負載均衡情況下,選擇鏈路代價較低的空閑路徑,快速、有效地構建滿足時延要求,鏈路代價最小的組播樹。
  6. This algorithm can apply to any real complicated atc enviroment with flexible goal cost function, and static or dynamic real - time atc automation system, to minimize traffic delay and improve landing capacity

    該演算法能滿足現實復雜空管條件下的各種限制約束,以及多種目標成本函數,可應用於靜態和動態的實時atc自動化系統,能有效地減小交通延誤和提高著陸容量。
  7. Guaranteed cost control of highly structured uncertain time - delay system with non - linear perturbation

    具有非線性攝動的強結構不確定時滯系統的保性能控制
  8. Delay - constrained least - cost routing algorithm

    時延約束的最小費用路由選擇演算法
  9. The delay and delay variation constrained minimum steiner tree problem is also researched. lcdvma ( low - cost delay variation - constrained multicast algorithm ) is proposed for this problem. low time complexity, low cost and constrained delay and low delay variation are achieved by only comparing minimum delay paths and minimum cost paths

    對于時延和時延差約束的最小steiner樹問題,提出了一種基於最小時延路徑和最小費用路徑的演算法?一lcdvma演算法,由於該演算法比較了通過中轉節點后的最低費用路徑和最短時延路徑,降低了運算復雜度,通過模擬得到了較小的網路費用和時延差,因此lcdvma演算法是一種具有低復雜度的時延和時延差約束的最小steiner樹的啟發式演算法。
  10. Results rectify that matched field processing based on ray travel time delay is insensitive to the mismatch of sound speed proflle, although the mismatch of ocean bottom depth and receiver location is bad to matched field processing, different forms of cost fimctions could decline the sensitivity

    計算結果表明,基於聲傳播時延的匹配場定位對聲速分佈失配是不敏感的。雖然接收基陣位置傾斜和海洋深度誤差對匹配場處理影響較大,但只要選擇適當的代價函數,可以得到克服。
  11. Give delaying cost is a kind of charge substantially, but should expect as a result of the benefit of these charge in the future, and the defray number of these charge is larger, if direct plan the charge that enters pay year, cannot calculate correctly current operation result, make them so give delay processing

    遞延費用本質上是一種費用,但由於這些費用的效益要期待于將來,而且這些費用的支出數額較大,若直接計入支出年度的費用,就不能正確計算當期經營成果,所以把它們作遞延處理。
  12. Give delaying charge is to point to cannot all plan into in those days increase and decrease, ought to be in each cost that amortizes inside year later, include the organization expenses, improved defray that hires fixed assets and fixed assets repair defray and amortize deadline to be in one year the other charge waiting for booth of above, say again " give delay capital fund "

    遞延費用是指不能全部計入當年損益,應當在以後年度內分期攤銷的各項費用,包括開辦費、租入固定資產的改良支出和固定資產的修理支出以及攤銷期限在一年以上的其他待攤費用,又稱「遞延資產」 。
  13. A fast routing algorithm for delay - constrained low - cost multicast

    約束的多播多路徑算販
  14. 1 a party who is bound to preserve the goods in accordance with article 85 or 86 may sell them by any appropriate means if there has been an unreasonable delay by the other party in taking possession of the goods or in taking them back or in paying the price or the cost of preservation, provided that reasonable notice of the intention to sell has been given to the other party

    第八十八條如果另一方當事人在收取貨物或收回貨物或支付價款或保全貨物費用方面有不合理的遲延,按照第八十五條或第八十六條規定有義務保全貨物的一方當事人,可以採取任何適當辦法,把貨物出售,但必須事前向另一方當事人發出合理的意向通知。
  15. Attack the funds of igneous personnel pays by following regulation : national worker attends attack the salary during fire, brigade needs fee, by its place unit pays ; national worker attends attack the cost of extra allowance for living expanses during fire, blame state worker attends attack the allowance of delay one ' s work during fire and cost of extra allowance for living expanses, and attack the other charge that spends during fire, by unit of fire cause trouble or cause trouble person the individual pays ; because fire is not clear, pay by on fire unit ; be like cause trouble individual or unit of fire cause trouble, on fire unit truly of financial insolvency, pay by government office of local civil administration

    撲火人員的經費按下列規定支付:國家職工參加撲火期間的工資、旅差費,由其所在單位支付;國家職工參加撲火期間的生活補助費,非國家職工參加撲火期間的誤工補貼和生活補助費,以及撲火期間所消耗的其它費用,由火災肇事單位或肇事者個人支付;火因不清的,由起火單位支付;如火災肇事單位、肇事個人或起火單位確無力支付的,由當地人民政府支付。
  16. Cross - flow filtration hardly help to delay the fouling, on the other hand, it would increase energy and cost

    錯流過濾對緩解膜污染作用不大,反而會增加制水成本。
  17. This paper also gives systematical analysis to the types of project delay and the handling principles of claims of delay and cost

    闡述了工期延誤的類型,工程延誤的處理原則,工期索賠的分析方法,費用索賠處理的基本原則和計算方法。
  18. Without acceptable reasons, a daily economic cost will be charged for any delay

    如沒有可接受理由,任何延遲完成的挖掘工程須繳付每日經濟費用。
  19. Thus, it can ensure no cancellation of the desired signal when minimizing the cm cost function to suppress interference. in this paper, delay - hypothesized matched filter based on minimum kurtosis criterion is used to initialize code - constrained cma

    通過對均衡器的權向量增加約束,使其在迭代更新最小化代價函數時,能在有效抑制干擾的同時保證期望用戶信號不被抑制。
  20. Different results specify that the first kind of cost function is sensitive to the mismatch of ocean depth and receiver location, but is insensitive to sound speed profile ' s % $ jai8x9 @ t $ m & z mismatch and has high accuracy of depth localizaion ; the second kind of cost fimction is insensitive to all three kinds of mismatch, but its resolution of depth is very low ln order to overcome the cost function ' s sensitivity to mismatch, improvemedt of the accuracy of time delay estimation and model calculation may be adopted, when both conditions are reached, the sensitivity wiil be greatly reduced and the resolution of range and depth will be improved at the same time

    模擬結果表明,第一類代價函數對海底深度和基陣傾斜失配是敏感的,對聲速失配卻不敏感,並且能夠獲得較高的深度定位精度;第二類代價函數對三種失配都不敏感,只是深度解析度較低。為了克服代價函數對失配的敏感性,可採用提高時延估計精度和模型計算精度的方法。當兩個條件滿足時,敏感性得到極大的抑制並獲得了較高的距離和深度估計精度。
分享友人