demolition contractors 中文意思是什麼

demolition contractors 解釋
做拆除工作的承包者
  1. Contractors are reminded to segregate inert materials from other construction wastes before separate disposal to public fill and landfill. for construction contracts commencing after july 1999, a trip - ticket system has been implemented to avoid illegal dumping and ensure proper disposal of construction and demolition materials

    所有由一九九九年七月以後生效的建築合約,均規定承建商必須採用新設的運載記錄制度以防止非法棄置建築廢料,並確保它們得到妥善處理。
  2. For building demolition works in particular, where unavoidable, the government has been urging private developers and their contractors to plan the whole process in a thorough manner, e. g. adopting selective demolition to maximize recovery of reusable and recyclable materials

    就建築物拆卸工程而言,如果無法避免,政府亦會力勸私人發展商及其承建商仔細策劃整體工序,如採取選擇性拆卸方法以盡量減少須棄置的拆建物料,及把拆建廢物循環再造成為有用物料。
  3. How it will penalize the above contractor and monitor fly tipping of public fills and construction and demolition ( " c & d " ) wastes by contractors ; and whether it will review the trip ticket system ; if it will, of the details ; if not, the reasons for that

    (一)如何懲處上述防洪工程承建商及監管非法傾倒公眾填料、建築和拆卸廢料的承建商,以及會否檢討「運載記錄制度」 ;若會,檢討的詳情;若不會,原因是甚麼;
分享友人