  1. In this paper, we expound the application and the rational analysis of the displacement monitoring in the slope engineering via the inspecting the stability state of the east slope and. the north cuneiform geological mass in the ore dressing plant, dashan village of dexing copper mine in jiangxi

    本文通過對江西德興銅礦大山村選礦廠東部邊坡和北部楔形地質結構體穩定狀況的監測,闡述了在邊坡工程中位移監測的應用及有關分析。
  2. Application of grade equivalent in dexing copper mine

    當量品位在德興銅礦的應用實踐
  3. The drain system of tongchang surface mine in dexing copper mine

    德興銅礦大山選廠碎礦系統分析與技術改造
  4. On the near - slope control blasting in opencasting at dexing copper mine

    德興銅礦礦山廢水治理現狀及其前景
  5. The evaluationand utilization of low - grade copper orein dexing copper mine

    德興銅礦低品位銅礦石的評價與利用
  6. The data transmission to be developed of 800mhz colny system at dexing copper mine

    集群系統中有待開發的數據傳輸
  7. Application of cnnc - 39m3 flotator in dashan dressing plant of dexing copper mine

    3浮選機在德興銅礦大山選廠的應用
  8. Computer auxiliary de sign sys of oper pit blasting used in dexing copper mine

    卡車調度系統在德興銅礦的應用與研究
  9. Production practice and technical study in heap leaching mill of dexing copper mine

    德興銅礦堆浸廠的生產實踐及技術研究
  10. Technical improvement of mineral processing at dashan dressing plant in dexing copper mine

    德興銅礦大山選廠選礦技術改造
  11. An automatic safety monitoring system for the no. 2 tailings dam in dexing copper mine

    德興銅礦2號尾礦壩的安全自動監測系統
  12. This paper analyses the existing situations of wastewater treatment at dexing copper mine and discusses the approaches to improving the capacity d comprehensively dealing with wastewater

    本文對德興銅礦礦山廢水治理現狀進行了全面的分析,從生產實踐出發對提高礦山治污能力、廢水綜合治理途徑進行了探討。
  13. Through a case study in the dexing copper mine of jiangxi province, some useful conclusions have been drawn about metal mine pollution

    通過熱紅外遙感影像對德興銅礦的地面熱污染狀況進行研究,為金屬礦山熱污染的治理提供幫助。
  14. Establishment and application of control system for treating acid waste water of dexing copper mine

    德興銅礦酸性廢水處理調控系統的建立與應用
  15. The ground base of the newly added chute in 4 tailings reservoir at dexing copper mine is characterised by thick weathered layer, loose structure, fractured zone and landslip mass accumulation. as a result, the ground has a great subsidence and inefficient carrying capacity. in view of this, the grouting technology was adopted to reinforce the chute ground base. the on - site testing shows that the subsidence of the chute has been efficiently controlled and the carrying capacity of the ground base improved so that the stability requirement has been met

    潘洛鐵礦主要使用的采礦方法是淺眼落礦的全面法和留礦全面法. 23礦體160m以上礦段上部為氧化礦和風化巖層,形成擠壓爆破和鬆散巖石覆蓋下的放礦條件.介紹了無底柱分段崩落法在該礦體開采中的應用.實際使用獲得的各項技術經濟指標還比較理想
  16. All company staff ' s key goal is that " human - oriented, with dexing industry, achieve the brand for a century "

    公司所有員工的核心目標就是「以人為本,以德興業,創百年品牌」 。
  17. The intellectual heap leaching factory productive management information system was been established in the paper. according to analyze dexing heap leaching factory parameter, the author integrated mathematics, mineral separation science, metallurgy, intelligence, information science, computer and management science etc into studying, the information system studying is very useful and innovational

    本文從建立智能化的堆浸廠生產管理信息系統的目的出發,以德興銅礦堆浸廠為研究對象,綜合運用了數學、礦物加工、冶煉、人工智慧、信息技術、計算機技術及管理科學等多學科知識,對堆浸廠的生產管理信息系統進行了具有實際價值的、創新性的探索和研究工作。
  18. Dexing agricultural trade co., ltd of jinxiangshandong at ecthai. com - an e - commerce gateway in thailand

    山東省金鄉縣德興農貿有限公司泰國電子商務途徑ecthai . com
  19. Based on the experience of years in the grid production management, combined with dispatch business operation flow, the author of the thesis proposed a feasible functional demand at first ; then expounded the management analysis results of system management, defect management etc, and designed the dexing copper mining company power transmission line defect management information system which including system management, defect management etc

    摘要作者依據電網輸電線路生產管理的經驗,結合線路管理業務的工作流程及電力系統規范,首先分類提出了可行的功能需求;闡述了系統管理、缺陷管理等方面管理的分析結果,設計出包含系統管理、缺陷管理等方面管理的德興銅礦輸電線路缺陷管理信息系統。
  20. The productive management information system has been established, which based on artificial neural network. in term of production parameter of dexing heap leaching factory

    本論文根據德興堆浸廠生產情況的特點,並基於人工神經網路這一智能分析決策方法,建立了堆浸廠的生產管理信息系統,主要內容包括:神經網路模型的建立與應用。