digging pile 中文意思是什麼

digging pile 解釋
挖孔椿
  • digging : n. 1. 挖掘,採掘。2. 〈pl. 〉開采物。3. 礦區,金礦。4. 〈pl. 〉〈美俚〉住處,〈英俚〉公寓。
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  1. Digging pile blast hole wall rock soil dynamic parameters detection and assessment

    挖孔樁孔壁巖土動力參數探測和評價
  2. Construction method of manual hole digging pile in water bearing layer

    淺析人工挖孔樁在含水層中的施工方法
  3. Application of hole - digging pile in pile foundation construction of bridge

    挖孔樁在橋梁樁基施工中的應用
  4. Construction method about superlength artificial digging hole pile

    超長人工挖孔樁施工方法
  5. Constructive technology of artificial hole - digging pile

    淺談人工挖孔樁施工技術
  6. Construction technology of manual hole digging pile

    人工挖孔樁施工技術探討
  7. Technical construction safety management of manual hole digging pile

    淺談人工挖孔樁施工安全技術管理
  8. Constructive practice of artificial hole - digging pile stabilization plan

    人工挖孔樁加固方案的施工實踐
  9. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下巖石爆破,浮運鋼圍堰就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。
  10. Application of pile - end pressure grouting in artificial hole - digging grouting pile

    樁端壓力注漿在人工挖孔灌注樁中的應用
  11. That causes new problems of construction on making use of or abandon old basis structure. based on the characteristics of the bridge foundation, this paper in detail introduces the design of construction procedures, construction methods and technological process for large temporary structures in foundation construction and driven or pull out steel casing pipe etc, which are seldom meet in common bridge construction. about digging and con struction of foundation piles, dynamic detection method of pile foundation etc. are also introduced and analysized

    由於設計的變更,前期已施工的基礎結構與修改後的結構有較大差異,給施工帶來舊基礎利用和廢棄處理等新問題,本文針對該橋的基礎特點,詳細介紹了基礎施工中大型臨時結構、打拔鋼護筒等一般橋梁施工中很少遇到的施工工序的設計、施工和工藝問題,對于基樁的開挖和施工、樁基的動態方法檢測等問題也作了詳細介紹和分析。
  12. Application of artificial digging hole and machinery drilling hole bored concrete pile mixture support in new and old construction

    人工挖孔與機械鉆孔灌注樁混合使用支護在新舊工業廠房施工中的應用
  13. Safety construction of manual hole digging pile in one large - scale workshop

    淺談大型車間人工挖孔樁的安全施工
  14. Construction of manual hole digging pile in sea - filling area with hydraulic fill sand

    吹砂填海地質人工挖孔樁施工
  15. Discussed shallowly the karst area percussion drilling pile is digging in hole pile construction question processing artificially application

    淺談巖溶地區沖擊鉆孔樁在人工挖孔樁施工問題處理中的應用
  16. Analysis of effect on detecting the integrity of pouring pile of man - made digging hole using stress - wave reflection method

    用應力波反射法檢測人工挖孔灌注樁的效果分析
分享友人