dike in 中文意思是什麼

dike in 解釋
圍以堰堤
  • dike : n 1 堤,堤防,堰堤。2 溝,濠,渠。3 【礦物】巖脈。4 障礙物。vt 1 用堤[濠溝]圍繞。2 開溝排水。n 搞...
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  1. Subordinate are plagioclase granite dike, layered tonalite, tonalitic conglomeration dispersed in amphibolite, ultramafic rock and metabasalt etc. plenty of igneous accumulated banding were discovered in amphibolite from nujinshan and bujing area some residual clinopyroxene also were found in a few of sample

    超鎂鐵巖多為構造透鏡體分佈於斷裂帶中,多蝕變為蛇紋石巖,在牛井山及布京一帶已發現並圈定了9個巖體(塊) 。
  2. Round the beautiful pavilion in addition to the long dike, weeping willow, green water, hear the oriole bridge and adopt the lotus bridge, the barn swallow bridge elegant choiceness, the oriole flying fish jump, the bottle gourd island, water moon xuan, the bamboo grove island becomes the wood, enchanting sight in spring time, the none is not to inebriate person s good prosperity

    除長堤垂柳綠水繞閣之美,聽鶯橋采蓮橋燕子橋的雅緻精巧,鶯飛魚躍葫蘆島水月軒竹林島的篁成林,柳暗花明,無一不是醉人佳景。
  3. This thesis studies each structural layer ' s feature : ( 1 ) structural layer of basement : it is a paleozoic folded basement, whose tectonic deformation and magma intrusion is fiercely, and it is affected by the early hercynian tectonic movement and related to the underthrust and closure ( c1 ) of zhungaer ocean basin and the areal pressing of continents ( c2 - 3 ) ; ( 2 ) structural layer of permian : due to the regional extending and fault depression role in mid - hercynian, it occurred to the combinations of structure and magma in santanghu basin and it ' s periphery area, such as a - granite ' s stock, batholiths and diabase ' s dike. there are many fault depressions possible

    按照不同構造層,研究了各構造層的構造特徵:基底構造層:受早海西期構造作用的影響,與準噶爾洋盆俯沖閉合、而後陸-陸碰撞的區域擠壓構造作用有關,為一構造變形和巖漿侵入活動強烈的古生代褶皺基底。二疊系構造層:受中海西區域性伸展斷陷作用的影響,盆地及其周緣地區發育與伸展構造有關的構造-巖漿組合,如呈巖株、巖基狀侵位的a型花崗巖以及呈巖墻狀侵位的輝綠巖等。
  4. The lithologies of intrusive rocks were re - determined, for example, the rock previously named as diorite in southern area was renamed as gabbro, and the dike rock distributed along nnw as spessartite which was related to formation of the zhulazaga gold deposit to some extent

    對礦區各類侵入巖重新釐定了它們的巖性特徵,如礦區東南部原閃長巖重新確定為輝長巖,確定nnw向分佈的脈巖為閃斜煌斑巖,且認為後者和朱拉扎嗄金礦的形成有一定的關系。
  5. As a practical application, the safety situation of jiujiang dike under the 1998 pluvial condition of once a hundred years in yangtze river has been evaluated by the reliability method from the point view of the seepage stability in terms of probability analysis and two dimensional saturated seepage finite element analysis combining with the mechanism of seepage burst in jiujiang dike summarized in the thesis

    通過滲流有限元和滲流可靠性分析論證了1998長江流域特大洪水災害中九江市防護大堤發生的嚴重潰口破壞的滲流破壞機理。分析、比較得出結論:堤防下游坡腳的出逸比降接近和超過臨界比降,在1998年長江百年一遇的洪水條件下九江大堤潰口斷面的抗滲可靠性僅在55左右的非常低水平。
  6. In the paper, river and the downstream area of dike are regarded as a whole system, and hydraulic model of coupling 1 - d river and gradual dike - break is established, therein the preissmann implicit difference scheme is applied to main river, and the fvm ( finite volume method ) is applied to the breach and polder

    本文將河道與堤壩下游區域視為一個整體,對于單一河道採用preissmann四點隱式差分格式計算,對于潰口及圩區採用有限體積法,建立了一維河道與堤壩漸潰耦聯的水力模型,也是一維、二維耦合的水流模型。
  7. In this paper, the numerical harbor should include following contents : 1. database of wave field, tidal current field, sediment field in researched area ; 2. database of ship styles. 3. numerical model used to analysis data. 4. plans of outer dike, utilities of sea line, and selections of waterway, which based on the above databases

    本文認為,對于港區而言,數值化的內容應包括以下幾個方面: ( l )所研究港區的波浪場、潮流場及泥沙場等自然條件數據庫的建立; ( 2 )船型數據庫的建立; ( 3 )數值分析模式的建立; ( 4 )提出建立在自然條件基礎之上的外堤布置、碼頭岸線利用策略及航道的擬定方案(即優化模式的建立) ; ( 5 )按照經濟最優原理快速準確地提出碼頭裝卸的策略及當前方案。
  8. As far as the framework is concerned, the first chapter mainly states the justice notion in ancient greek myth, and reveal the spreading and change of socialism in ancient greece by distinguish between themis justice and dike justice

    就寫作框架來說,首先,本文第一章主要闡述了神話中的正義觀念,通過解析忒彌斯正義與狄刻正義的區別,揭示出古希臘社會正義思想的流變。
  9. Determining valid vertical space in observation hole of dike - dam

    大壩觀測孔有效鉛垂空間的確定
  10. Risk analysis of dike breach in lower reaches of yellow river

    黃河下游懸河決口災害的風險分析與評價
  11. The evaluation results of dike breach risk show the following distributing regularities of the hang river dike breach risk in the lower yellow river : ( 1 ) the dike breach risk increase with the increasing of flood. ( 2 ) dike breach risk decreases with the river types change along channel. ( 3 ) the reaches of greater dike breach risk mainly distribute in wandering reaches

    評價結果表明黃河下游懸河決溢風險具有以下分佈規律: ( 1 )決溢風險隨著洪水量的增大而增高; ( 2 )決溢風險隨河型的沿程變化而降低; ( 3 )決溢風險較大的河段集中在游蕩型河段; ( 4 )游蕩型河段南岸的決溢風險相對較高; ( 5 )彎曲型河段北岸決溢風險高於南岸。
  12. Code for design of fire - dike in storage tank farm

    儲罐區防火堤設計規范
  13. The lake shore sandy dike in the shrinking process of " hetao ancient lake " in the geologic period, which is suffered from the wind force function " rises right on the sandy land ", is the substantial basis of the formation of maowusu sandy land

    摘要地質歷史時期「河套古湖」退縮殘留的湖濱沙堤受風力作用「就地起沙」 ,是毛烏素沙地形成的物質基礎。
  14. Through flume experiment and numerical simulation, preliminary work on computation of water surface profile in regulation river reach, numerical simulation of flow with single spur dike in flume, and 3 - d numerical solution of flow around spur dikes group are carried out in this paper

    本文通過模型實驗和數值模擬相結合的研究方法,在整治河段一維水面曲線計算,單丁壩繞流數值模擬,紊流數學模型在航道整治工程中的應用以及丁壩群附近水流的三維流動特性等方面做了一些初步研究。
  15. Based on the structural features of semi - cylinder composite dike in the yangtze estuary deepwater channel regulation phase project n a section, the key technique of such semi - cylinder transportation procedure and precasting quality is analyzed and summarized, which may serve as a reference for relevant construction

    摘要依據長江口深水航道治理二期工程n a標整治建築物中半圓體混合堤結構形式,對這種半圓體大型構件出運工藝與預制質量控制的技術關鍵進行分析總結,供同行參考。
  16. Discussion on project type and construction method of courseware protection dike in severe area

    土木結構圍堰在施工導流工程中的應用
  17. On the banks, on the dike, in the pond, everywhere there was white, healthy, muscular flesh

    岸上,堤壩上和池塘里,到處都是白晃晃的健康的肌肉發達的肉體。
  18. As primary engineering measure, impermeable wall is applied broadly to reinforcing dike in middle - lower reaches of yangtze river

    防滲墻作為堤防防滲處理的主要工程措施,在長江中下游堤防加固工程中得到了廣泛的運用。
  19. The influence of cutting infiltration to groundwater surroundings by impermeable wall of dike in middle - lower reaches of yangtze river is abroad, and also is a long process

    長江中下游堤防防滲墻截滲對地下水環境的影響涉及范圍較廣,同時也是一個長期的過程。
  20. The difficulties of this problem are as follows : there is a grate discrepancy of geology condition of dike in middle - lower reaches of yangtze river, the facts which affect groundwater power field and water chemistry field not only include geologic structure of dike, topography and river network, precipitation infiltration and evaporation condition, but also are closely related to the design scheme of impermeable wall, construction method and construction quality

    本課題研究的難點在於長江中下游堤基工程地質條件差異較大,影響地下水動力場、水化學場的因素不僅與堤基地質結構、地形與河網分佈、降水入滲及蒸發條件,而且與防滲墻的設計方案、施工工法及施工質量等密切相關。
分享友人