diversion structure 中文意思是什麼

diversion structure 解釋
導流建築物
  • diversion : n. 1. 轉換,轉移,轉向;(河流、航線等的)改道;(資金等的)挪用;〈英國〉(因修路等車輛)繞行,繞路。2. 消遣,娛樂。3. 【軍事】箝制,佯攻。
  • structure : n. 1. 構造,結構;組織;石理,石紋。2. 建造物。3. 【化學】化學結構。4. 【心理學】(直接經驗中顯現的)結構性,整體性;整體結構。adj. -d ,-less adj.
  1. Application of the civil structure coffer dam in construction and diversion project

    草垡在水土保持工程上的應用
  2. The structure of jinping cascade 2 hydropower station is a high - head and high discharge diversion tunnel with low crown gate

    錦屏二級水電站是一首部設低閘,採用長隧洞引水的高水頭、大流量的引水式電站。
  3. Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage

    文摘:針對實際工程中的發電引水隧洞運行的各種工況進行了水工模型試驗研究,指明要獲得良好的水流流態,過水建築物各部位結構輪廓的造型應適應水流流線的收縮、流速及壓強的變化;為使引水隧洞在各級引水流量下能安全可靠地運行,需慎重確定洞內消能工的體形和尺寸。
  4. Erosion action of erosion media on concrete is easily occurred in hydraulic structure diversion works and immersed underground structure

    侵蝕介質對砼的侵蝕作用,易發生在水工建築、引水工程以及浸沒在地下水位以下的各種砼的地下構築物中。
  5. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  6. As a kind of important hydraulic structure, hydraulic tunnel is very useful at many aspects such as conveyance, diversion and flood discharge

    水工隧洞作為一種重要的水工建築物,在輸水、導流及泄洪等方面起著重要的作用。
  7. After water diversion among lakes, the lakes and the connected channels form a complex lake net structure, leading to problems such as multi - selection of diversion routes and existence of secondary distributaries

    摘要湖群調水后,湖群及其連通溝渠共同組成了復雜的湖網結構,調水線路不單一,存在著二次分流問題等。
  8. Concretely, on the basis of describing the communication specification of arinc 429 with enhanced parallel port ( epp ), the standard and the module application of dsp and cpld, the thesis has proposed the design of the arinc 429 technology based on dsp system. at first, the function and the application of each module of the system and the operation principle of high - performance cmos bus interface circuit hs - 3282 chip which forms the main body of the data diversion of the interface module are introduced. secondly, the hardware structure of the interface module is described in detail, mainly including data latch and buffer circuit, choice circuit of transmission rate, etc. and then the design philosophy and flow charts of the software are fully discussed, such as the basic requirement of software, the design and realization of the function

    本文在簡單的論述了pc並口協議( epp )與dsp之間的通信方法、 cpld模塊邏輯控制應用和arinc429的通訊規范的基礎上,給出了基於dsp的arinc429通訊介面的設計方案:對通訊板中各模塊的功能和應用以及構成數據轉換主體的總線介面晶元hs - 3282的工作原理做了說明;介紹了本設計所用的dsp和cpld的功能概況;詳細敘述了通訊板介面模塊的硬體結構設計,其中,對數據緩沖電路、數據傳輸速率選擇電路、邏輯控制電路等各關鍵點做了重點介紹;具體闡述了軟體設計思想及流程圖,包括軟體的基本要求和功能的設計與實現;接著從埠譯碼單元、 i / o通道、電平轉換電路等方面進行了介面模塊的軟、硬體調試;最後,給出了測試結果,對研製工作做了總結,對本設計的優缺點各做了評述。
  9. Secondly, grounded on the study of the distribution of the high external waterpressure and high geostress and the characteristic of the rock in engineering area, the paper built the elastoplastic fem numerical simulation model, and think over the procedure in tunnels excavation and the history of work of water load, and then get the relations between the different tunnels diameter, different permeability coefficient and depth of the grouting rock and the deformation, stress distribution and plastic range of the surrounding rock and support structure. finally, according to the modern design theory of tunnels construction, the particular design of country rock reinforcement and support structure are researched and presented for diversion tunnels

    接著,本文在深入研究工程區高外水壓力及高地應力分佈規律及巖體特性的基礎上,建立起高地應力、高外水壓力作用下隧洞圍巖結構非線性有限元模擬計算模型,然後考慮隧洞的開挖過程、水荷載的作用歷史,通過計算分析得出了不同洞徑、不同的灌漿圈滲透系數和不同的灌漿圈深度以及不同開挖過程與圍巖及支護結構的應力、位移和塑性區的關系。
  10. As an inlet structure, the forbay is an important part of the pumping station. the pressurized forbay, close in top structure, is a kind of particular forbay in which water is pressurized. based on the integral hydraulic model test of shanghai changqiao waterwork ' s water - transport pumping station, some research on the hydraulic characteristics of the pressurized forbay has been done in the paper. the main content is listed as follows : l. the hydraulic characteristics of the pressurized forbay in different water supply combination and different pump unit combination without divertion measure, and the reason of the poor flow state. 2. the hydraulic characteristics of the pressurized forbay with diversion pier, and the reason why the flow state can be improved. 3. the experimental research on the critical air suction condition of the pressurized forbay

    本文基於上海長橋自來水廠改造工程送水泵站整體水力模型試驗,對有壓前池的水力特性進行了研究,研究的主要內容如下: 1 、無導流措施的有壓前池在不同供水組合及不同機組開機組合條件下的水力特性,並分析了流態較差的原因; 2 、加設導流墩後有壓前池的水力特性,以及加設導流墩流態改善的原因; 3 、有壓前池進氣臨界條件的試驗研究; 4 、水泵進氣以後水泵性能的討論。
  11. Abstract : combining tangyao tunnel construction practice at zhaosandu diversion works in wenzhou, the paper presents the structure, dustremoving principle and result of bag dust filtrating collector, and briefly describes its accessories and applicable cases

    文摘:結合溫州趙三渡引水工程湯嶴隧道施工實例,介紹袋式洗濾除塵器的結構形式、除塵原理及除塵效果,並對配套設施和適應性作了簡要說明。
  12. The lcdm dust filter integrates the main pipe structure ( for either inlet or outlet ) and advanced diversion technology, therefore it can handle the gas with high dust content

    Lcdm型長袋低壓離線脈沖袋式除塵器利用進、出口總管結構及先進的導流技術,因此除塵器不僅能處理一般含塵濃度的氣體,而且能處理高含塵濃度的氣體。
  13. Finally, author analyzed and compar ed these two schemes on the aspects of technology and economy according to the wholly structure optimizing process and outcome, and recommended the final scheme of the right bank ' s diversion tunnel of gongboxia power station reconstructed into a horizontal swirling flow internal dissipater tunnel

    最後根據整個體型優化過程與結果,從技術與經濟對比分析兩個方面,對公伯峽右岸旋流泄洪洞進行了選型研究與方案比較,提出了公伯峽水電站右岸旋流內消能泄洪洞的最終推薦方案。
  14. Firstly in the paper the research of hydraulic characters and the optimize of structure have being carried out on the four bigger design schemes of permanent internal dissipation discharge tunnel reconstructed from the right bank ' s diversion tunnel of gongboxia power station with a method of theoretical analysis combined with test comparisons. on this basis, two form swirling flow internal dissipation schemes, vertical and horizontal axis are recommended to the construction unit of the station as the schemes to be selected next

    本文採取理論分析與試驗比較相結合的方法,首先對黃河公伯峽水電站右岸導流洞改建為永久式內消能泄洪洞的四個較大設計方案進行了水力特性的試驗研究與體型優化,在此基礎上,向建設單位分別提供了豎井旋流內消能的推薦方案與水平旋流內消能的推薦方案。
分享友人