down in the flood 中文意思是什麼

down in the flood 解釋
陷於洪水
  • down : adv (downmost)1 向下(面);下,降;在下(面)。 come down 下來;下(樓)來;(雨等)落下。 The...
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • the : 〈代表用法〉…那樣的東西,…那種東西。1 〈用單數普通名詞代表它的一類時(所謂代表的單數)〉 (a) 〈...
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  1. The woman started to curse in a flood of obscene invective that rolled over and around him like the hot white water splashing down from the sudden eruption of a geyser.

    那女人連珠炮似地臭罵起來,好象溫泉要突然迸發,一股白花花的熱水直朝他身上噴來。
  2. And now it is deluged with a nectarous flood - the young germs swamped - delicious poison cankering them : now i see myself stretched on an ottoman in the drawing - room at vale hall at my bride rosamond oliver s feet : she is talking to me with her sweet voice - gazing down on me with those eyes your skilful hand has copied so well - smiling at me with these coral lips

    此刻我看到自己躺在溪谷莊休息室的睡榻上,在我的新娘羅莎蒙德奧利弗的腳跟前。她用那甜甜的嗓音同我在說話用被你靈巧的手畫得那麼逼真的眼睛俯視著我她那珊瑚色的嘴唇朝我微笑著她是我的我是她的眼前的生活和過眼煙雲般的世界對我已經足夠了。
  3. Aim at ubiquitous parallel multi - reservoir structure in our country ' s basin, the universal objective function including coefficient bi embodying a spatial significance difference at different flood control points and variable ai denoting a selection of scheduling mode is established, which provide a valid intervenor interface for flood control consultation decision. according to the real - time requirement, a model of reservoir storage allocation is proposed, which embody basic idea of phasic compensation. passing the dynamic correction to cut down the disadvantageous influence that indetermination result in on the certain degree, joining together the step alternation solving method, this model can maximally consider bias of decision makers, ensure the rationality and practicability of the solutions

    針對我國流域中普遍存在的並聯庫群結構,論文提出包含不同防洪點重要性的系數_ i和選擇調度模式的變量_ i的通用目標函數,為防洪會商決策,提供了有效的人工干預介面,根據實時性要求提出動態分配防洪庫容的庫容分配方法,體現了相機補償的基本思想,通過動態修正在一定程度上可以削減不確定性造成的不利影響,結合分步迭代求解技術,能最大限度體現決策者的偏好,保障解的合理性和可操作性。
  4. Some few minutes had elapsed, and the stranger began to show manifest signs of impatience, when a slight noise was heard outside the aperture in the roof, and almost immediately a dark shadow seemed to obstruct the flood of light that had entered it, and the figure of a man was clearly seen gazing with eager scrutiny on the immense space beneath him ; then, as his eye caught sight of him in the mantle, he grasped a floating mass of thickly matted boughs, and glided down by their help to within three or four feet of the ground, and then leaped lightly on his feet. the man who had performed this daring act with so much indifference wore the transtevere costume

    過了一會兒,此人開始顯示出不耐煩的樣子,正在這時,屋頂的洞口外面發出了一種輕微的響聲,立刻有一個黑影擋住了亮光,那分明是一個男人的身影,那人正在急切而仔細地察看他身下的這一大片地方,當他看到那個穿披風的人時,他就抓住一簇向下飄垂密密地纏結在一起的根須,順著它滑到了離地三四尺的地方,然後輕輕地跳了下來,他穿著一套勒司斐人的服裝。
  5. This article is mainly aim at tuo28 down reservoir of shengli oil field. through deeply analysis of geological character and its developing course. the important problems are found, first, flood pattern is not perfect, the reserivor is serious watered out in horizontal section, waterflood susceptibility is bad, the contradiction between oil and water in reservoir is serious, the interference between each producting formation is great, the crude oil is density, the reservoir have not enough energy, anisotropies is very serious. due to those facts, it is difficult to improve oil production by general technique

    本文通過對勝坨油田坨28下油組油藏地質特點及開發歷程的深入分析,找出目前存在的主要問題有:注采井網不完善,平面上水淹嚴重,注水效果差,油水矛盾突出,層間干擾嚴重,原油稠,油藏能量低,儲層非均質性強,致使常規彩油工藝開發難度大。
  6. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  7. Search the web for pictures of flood waves moving down rivers and / or washes in deserts. search also for tidal waves moving up rivers

    搜索網頁找到關于沿河而下的洪水或者沖過不毛之地的圖片。再搜索潮汐沖擊河水的圖片。
  8. Self - abandoned, relaxed, and effortless, i seemed to have laid me down in the dried - up bed of a great river ; i heard a flood loosened in remote mountains, and felt the torrent come : to rise i had no will, to flee i had no strength

    我自暴自棄,渾身鬆弛,百無聊賴,彷彿躺在一條大河乾枯的河床上,我聽見洪水從遠山奔瀉而來,我感覺到激流逼近了,爬起來吧,我沒有意志,逃走吧,我又沒有力氣。
  9. Article 41 any railway bridge to be built across a water course shall conform to the requirements for flood prevention, navigation and flow of current as laid down by the state in relevant regulations

    第四十一條修建跨越河流的鐵路橋梁,應當符合國家規定的防洪、通航和水流的要求。
  10. Stooping again to come out at the low - arched door, they left it burning, and retraced their way to the court - yard ; seeming to recover their sense of hearing as they came down, until they were in the raging flood once more

    他們讓火堆燃燒,重新彎下身子從低矮的拱門走了出來,沿著原路回到了院子里。這時聽覺也似乎重新恢復,他們又回到了洶涌澎湃的浪潮聲里了。
  11. At the same time that the great flood hit the ohio valley, there was a major fire in downtown indianapolis, indiana. fire burned down most of an apartment building leaving over 150 people homeless

    在這同時,在印第安那州的印地安那玻里鎮發生了大火,熊熊的大火吞食了許多公寓建築,造成超過150人無家可歸。
分享友人