duration curve 中文意思是什麼

duration curve 解釋
(持續曲線)歷時曲線
  • duration : n. 1. 持久,持續。2. 持續時間,存在時間;期間。adj. -al
  • curve : n 1 曲線;彎曲;彎曲物。2 曲線規 (=French curve);【機械工程】曲線板;【棒球】曲線球;【統計學...
  1. According to differences of construction process, boundary condition, temperature and stress of two schemes extending 3m deep short seam on upstream face in the middle of rcc overflow section and no short seam are calculated, what " s more, in this paper the equivalent line drawing of stable temperature field and unstable temperature field during construction and operation period and the duration curve drawing of typical points " s temperature and stress are plotted, and the results of peak and minimum on temperature in every month and maximum on tensile stress are attained

    根據施工過程和邊界條件,對溢流壩段中間上游面增設3m深短縫和不設短縫兩個方案進行了溫度和應力計算,並繪制出穩定溫度場等值線圖及施工期、運行期非穩定溫度場等值線圖,典型點溫度和應力歷時曲線圖,逐月最高、最低溫度和最大拉應力及相應位置等成果。
  2. Because of the complexity of calculation result data, and in order to simplify the analysis of results, this paper only provides annual temperature isoline map of february, may, august and november during construction, temperature isoline map of the first, fifth, tenth, twentieth and thirtieth year during operation, duration curve of temperature and stress of typical point at different elevation, the maximal stress distribution along dam height, point at different elevation, the maximal stress distribution along dam height, and the maximal and minimal temperature and the maximal tensive stress and its position of every month

    因計算結果數據量非常大,為便於成果分析,本文僅給出施工期每年2 、 5 、 8 、 11月份和運行期第1 、 5 、 10 、 20 、 30年的溫度等值線圖,壩體不同高程典型點溫度和應力歷時曲線圖,最大應力沿壩高分布圖,逐月最高、最低溫度和最大拉應力值及相應的位置等。
  3. In order to monitor on - line expansion difference during operation for lai cheng power plant in shandong province, this paper not only describes the realization of data acquisition, but also gives curve of rotor thermal stress according to stress caculation. furthermore improve traditional warming process. it can be observed that by means of the on - line system the start - up duration has been decreased for no. 1 unit of lai cheng power plant start up

    並依據萊城電廠機組的實際情況,經過理論計算給出了機組不同溫升率下的熱應力曲線,對傳統暖機過程進行了一定的改進,可縮短啟機時間,經萊城電廠1機組大修后冷態啟動檢驗完全符合實測值,證明本系統在實際運用中具有廣泛的推廣價值。
  4. Under this circumstance, our treasury bond market exits lots of shortfalls which impede further development for this market. in this essay, combining with the experience in developing country " s experience, it analyses some challenges which confronted chinese bond market, such as liquidity in the interbank market has yet to be improved, duration in bond products are yet to be rational, a sound yield curve is yet to be take shape, the separation between exchange and interbank yet to be broken. in order to solving above issues, this essay suggests that it should develop market maker system to increase market liquidity ; manage balanced treasury bond ; issue short and long term treasury bond in proportion to improve duration and yield curve ; develop bond derivative products such as future trading, open style repurchasement, so it can provides tools for risk protection

    但隨著我國經濟的快速發展,金融市場已今非昔比,中國成為了世貿組織的成員,中國資本市場要走向國際化,利率的市場化是大勢所趨,在此前提下,我國國債市場還存在著很多不足,越來越阻礙著國債市場的進一步發展,本文結合世界發達國家的先進經驗,剖析了我國國債市場存在的一些問題如:流動性有待改善、國債期限結構不合理、無法形成科學合理的益率曲線、交易所市場與銀行間市場割裂等,為解決這些問題,本文建議應發展做市商制度以提高市場流動性;實施國債余額管理,發行短期國債及長期國債,改善國債期限結構,以形成科學合理的收益率曲線;發展債券衍生金融創新工具如國債期貨交易、開放式回購等,為投資者提供避險工具等等。
  5. 4. as for the three kinds of waterproof underlying surface, when rainfall intensity is strong, the rise process curve will steep in the process of discharge, and also speed of discharge to reach steady will quicker. but it produces little effects on duration of fall

    4 .對于透水性差的下墊面,雨強越大,流量過程的漲水曲線越陡,且達到穩定流量的速度也更快,但對流量過程的退水歷時影響不大。
  6. Based on the theory of stochastic finite element, the structural parameters of frame - shear structure including stiffness and mass and damping are simulated to be stochastic variables. by solving recurrence equation of stochastic finite element, the duration curve of mean value and standard deviation of seismic response can be obtained for every floor of frame - shear structure. an analysis is thus given to the effects of independent variation and simultaneous variation of structural parameters on the seismic dynamic response of frame - shear structure. as shown by the results, with regard to frame - shear structure, the effect of variation of strucural parameters on the change of mean value are chiefly the increase of standard deviation of response. variation of stiffness will cause the response of frame - shear structure to variate greatly ; variation of mass shows less effect ; and variation of damping shows insignificant effect. the effects of simultaneous variation of various structral parametres on seismic response are only slightly greater than the effect of stiffness variation alone

    以隨機有限元理論為基礎,將框剪結構的剛度、質量、阻尼等結構參數為隨機變量.通過求解隨機有限元的遞推方程,得到框剪結構各層的地震動力響應均值和標準差歷時曲線.分析結構參數單獨變異,以及同時變異對框剪結構地震響應的影響.研究結果表明,對框剪結構而言,結構參數的變異對響應的均值變化影響都不大,主要是增大響應的標準差.剛度的變異性將引起框剪結構的響應發生大幅度變異,質量的變異性影響稍小,阻尼的變異性影響不顯著.結構各參數的同時變異,對框剪結構地震響應的影響,僅比剛度單獨變異的影響稍大
  7. Discharge duration curve

    量持續曲線
  8. Rainfall intensity, frequency, and duration relationship curve of rainstorm was developed in the six period of the city zone in xi ' an, i. e. lh, 2h, 3h, 4h, 5h, 6h respectively, by adopting the curve method of pearson type 3 curve, and the rainstorm type which occur only once a year in 12h was developed

    採用皮爾遜型曲線方法,設計出了西安城區1h 、 2h 、 3h 、 4h 、 5h 、 6h這6個時段的暴雨雨強頻率歷時關系曲線,並設計了歷時12h的1年1遇暴雨雨型。
  9. Considering that the infiltration capacity curve can ' t express the actual infiltration capacity, the authors develop the surface runoff yield models that combine with the infiltration capacity curve, unstable raining process and antecedent soil moisture in each rainfall or over a duration time

    考慮到流域實際的下滲能力,建立了將下滲能力曲線、不穩定降雨過程和前期土壤含水量有機聯系起來的流域場(時段)暴雨地表徑流計算模式。
  10. Quantity of generating electricity should be also calculated while the river inflow, quantity of water transfer and its duration curve are taken into account. as a company, it is necessary to take a series of measures to increase its benefits while water transfer leads to the decrease of hydro power inevitablly. the efficient methods can be taken into account as follows : i ) to improve the forecast accuracy, to decrease surplus water, and to increase seasonal electricity energy, ii ) to raise the peaking ability of dan jiang kou power station to obtain peaking benefits, iii ) to choose a suitable site to construct a pumped storage plant for peaking benefits

    在進行以上四方面內容深入探討的基礎上,論文針對丹江口水利樞紐運行任務、運行方式的重大變化,提出漢江集團應採取以下因應措施以適應企業產業結構的調整,這些措施包括:準確計算發電效益減少值;合理地核算水源的供水成本;以上述兩項計算成果為基礎,核算企業結構調整后總效益變化量;提高預報水平,減少棄水量,爭取增發季節性電能;研究新的調度方式,提高電站調峰能力,提高電站的容量效益;在適當的地點修建抽水蓄能電站,提高電站的調峰能力。
  11. The influence of water transfer duration curve on hydro power output and electricity energy

    同一調水規模、不同配水方式對發電的影響; 3
  12. Load duration curve

    負載持續時間曲線
  13. Available hydro power duration curve

    水力可能?電力持?曲線
  14. Under unsaturated condition, the duration of the transport process was obviously prolonged, peak value of the breakthrough curve raised, the preferential flow was not significant and the curve was gently

    在非飽和條件下,硝態氮運移過程的時間明顯加長,穿透曲線的峰值增高,優先流不明顯,穿透曲線平緩。
分享友人