earth pipe 中文意思是什麼

earth pipe 解釋
接地管
  • earth : n 1 〈常E 〉 地球。2 大地,陸地,地面,地上。3 土壤,土。4 【化學】土類;泥。5 世界人類;人的軀體...
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  1. The penetration test study the disturbance of soil in difference location. by using finite element method, the paper study the stratum movement and the earth surface deformation caused by pipe jacking, analysis the construction parameter such as head pressure, deflexion, friction force impact on earth surface deformation, give the distributing rule and range of additional soil pressure in soil

    採用有限元計算分析的方法,對頂管施工引起的地層運動及地表位移進行研究,分析了機頭土壓力、機頭偏斜、摩阻力等不同施工參數對地表變形的影響以及附加應力在土中的分佈規律和影響范圍。
  2. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  3. Pipe organs are the largest, most powerful musical instruments on earth. yet a mere sliver of wood stands between a thundering roar and dead silence

    管風琴是全世界最大、氣勢最磅礴的樂器。但從一片死寂到發出震耳欲聾的聲響,其間的差別僅在薄薄的一片木片。
  4. This composite pipe has its shell constructed with metal with brackets by point welding u - shape tortoise shell network in the inner wall and stuffed with rare earth wearable materials making the pipe enjoy better anti - eroding and wear resistant capability

    本產品是以金屬為殼體,管內壁點焊u型或工型龜甲網作為支架,龜甲網內填充稀土耐磨材料的復合管道,具有更好的抗耐磨、抗沖刷性能。
  5. Earth embankment lay pipe

    土堤敷設管線
  6. Abstract : large transmission main pipe line engineering, treated foundation on deep muddy, thick backfilling ground is introduced in this paper, cement mixed combined earth foundation is designed and calculated, pipe bridge 、 pipe pass through dam and etc, technical measures are also introduced

    文摘:本文介紹深淤泥厚填土場地大型輸水干管工程的地基處理,水泥攪拌樁復合地基基礎設計與計算及過橋管、過堤管等的技術處理措施。
  7. The in - situ testing includes surface deformations, sub - surface movements, earth pressures, pore water pressures, underground water levels, spt, stresses of pipes and pipe - soil contact stresses. in addition, the total jacking forces, deviations in line and level of the pipe line and earth pressures in the earth pressure balance machines ( epbm ) are also recorded. the results of field - testing are analyzed, and the variety of testing datum include earth pressures, pore water pressures and underground water levels during the course of the shield through it are studied

    現場測試內容包括地面變形、深層土體變形、土壓力變化、孔隙水壓力變化、地下水位變化、土體標準貫入試驗、管道內力變化、管土接觸應力變化以及頂管施工現場記錄(包括頂力、土壓力、平面偏差、高程偏差等) 。
  8. Concerning the construction of the shallow cover and the special shallow cover in the tunnel under the special geology conditions, the principle of " to stabilize the slopes with protecting arch ; to strengthen the earth with the pipe - shield support grouting ; to dig a hole shallowly ; to blast slightly ; to use strong supporting structure. " has been adopted to enter the tunnel safely ; in terms of the broken belt, the effective actions such as the pipe - shield support grouting, strengthening the surrounding rock in advance with advanced bolt and steel grids, and so on, are taken to pass the poor conditioned part smoothly

    對于特殊地質中的淺理、特淺埋進洞的施工,堅持「護拱穩定邊仰坡,大管棚注漿加固土體,淺打眼、弱爆破、強支護」的原則,做到安全進洞;對于斷層破碎帶,則採取了管棚注漿,超前錨桿預先加固圍巖並結合鋼格柵支撐等有力措施,順利通過了不良地段。
  9. The test study change of the soil pressure, the touch pressure between pipe and soil, pore pressure, the movement of depth soil, the underwater level and the deformation of earth surface in process of pipe jacking

    研究了頂管施工過程中引起的土壓力、土體與管壁的接觸壓力、孔隙水壓力、深層土體位移、地下水位的變化以及地表變形等的影響。
  10. Main incoming watergas pipe not bonded to earth

    總水喉管總氣體管並無接地。
  11. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的測試,即夏季製冷工況的測試、冬季供熱工況的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季工況的測試中還進行了變流量測試,在冬季工況的測試中還進行了熱平衡測試。本文對測試數據進行了處理,計算出了冬(夏)季工況埋管吸(放)熱量、熱泵空調器供熱量(製冷量) 、熱泵空調器輸入功率、埋管單位管長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地下一二層埋管進出水溫度變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫度恢復情形,得出熱泵系統停機一周內地溫恢復特別快。
  12. But pipe jacking construction inevitably brings about the ground and earth ' s surface movement and additional stress in soil and near structure. that is environment problem

    但是應用頂管法施工會不可避免的引起管道附近土體及地表的位移,在土中引起附加應力,產生環境影響問題。
  13. Special means of support may be provided, but under no conditions shall the pipe be placed on timbers, earth mounds, pile bents or other similar supports unless specified designs which are adequate for these abnormal bedding conditions are provided in

    有時可能需要提供特殊的支撐,但除非規定的設計有明確要求,需用於此類非正常墊層條件,否則任何時候均不應將管道鋪設于墊木、土堆、樁排或其它類似支撐之上。
  14. To get the goal, the paper detailed presents the two types different pipe jacking building technology and site test about the bigger caliber steel pipe in the course of pipe jacking by engineering example ; propose the concrete way of improving and perfecting the new technology in the air - power pipe jacking ; make progress on applicability and spreading in use on pipe - jacking ; detailed indicates the earth - pressure balance theory and handling technology on the key technology of pipe jacking which supply reference to pipe jacking construction in shanghai areac

    鑒于以上目的,本文通過工程實例對兩種不同類型的頂管施工技術及大口徑鋼管頂進過程中的原體測試進行了詳盡的介紹。提出了氣動頂管新技術的改進、完善的具體方法,加大了其實用性及可推廣性;詳細闡明了土壓平衡理論、頂管施工關鍵點的處理技術,對相關施工,特別是上海地區的頂管施工,提供了可借鑒參考的依據。
  15. Analysis has been concentrated upon the triple - pipe construction method in this thesis. detailed introduction has been carried out from the cut of earth by means of gaseous - hydraulic co - axial composite grouting flow to the principle of earth stabilization, from the makeup of grouting liquid to the equipments, types of instruments, operation regulations and means of quality control required in every link of grouting

    論文重點分析了三重管法施工技術,分別從氣液同軸復合噴射流對土體的切削到對土體的加固原理,從注漿液體的配備到注漿各環節所需設備、機具型號及操作規程和質量控制手段等方面都做了詳細的介紹。
分享友人