earth slope 中文意思是什麼

earth slope 解釋
土坡
  • earth : n 1 〈常E 〉 地球。2 大地,陸地,地面,地上。3 土壤,土。4 【化學】土類;泥。5 世界人類;人的軀體...
  • slope : n 1 傾斜,坡度;坡,斜坡,斜面;【印刷】斜體。2 【軍事】掮槍的姿勢。3 【數學】斜率。4 【礦物】斜...
  1. Furtherly, according to their state in suffering force and their modes of initial motion, the casualty loess landfalls on the house side - slope are classified into two types of tension - sliding loess landfall and collapsed earth cave dwelling

    根據土體受力狀態和起始運動方式,將宅基邊坡傷亡性黃土崩塌劃分為張裂?滑移式黃土崩塌和坍窯兩種類型,總結了其前兆、時空分佈特徵,著重分析了其形成原因。
  2. This paper studies the perturbation action of celestial bodies ' movement on the earth from the view of celestial mechanics, and furthermore analyzes the effect of celestial bodies ' movement on the natural slope stability due to phosphorus ore mining in mountainous areas

    摘要針對宜昌磷礦高陡山區地下開采對上部山體穩定性影響,從天體力學的角度探討天體運動對地球的攝動作用,並分析月球運動的引力對山區磷礦自然坡失穩的影響。
  3. It is a rather well - known fact that bank - slope deformation and failure result from the coupling of earth ' s endogenic and exogenic geological processes, in which different dynamic - force factor has a different correlation to the evolution of bank - slope

    摘要河谷岸坡的變形與破壞是地球內外動力耦合作用的結果,並且每一種動力地質作用對于岸坡變形失穩的貢獻程度不同,造成岸坡變形破壞頻率和規模的空間差異。
  4. The application of earth - fixing mat in herbage protection of high earth roadbed side slope

    固土網墊在高填方路基邊坡植草防護中的應用
  5. Riprap protection for dam slope on the upstream of daguangba earth dam

    梅村水庫砌石拱壩防滲加固設計
  6. The fieldworks and the test results show that there appears three failure models on the natural slope, that is, rotational slide, translational slide and earth flows. triaxal tests, including the isotropical consolidation drained and undrained compression and anistropically drained tests, are performed on loosely compacted specimens. the critical state line ( csl ) is obtained in the e - lgp " plot based on the results of the above tests

    在野外調查的基礎上,結合試驗成果分析,初步得出自然斜坡破壞的模式,包括旋轉型滑動、平移型滑動及土流等;並對暴雨滑坡轉化成泥石流的影響因素和碎屑物質的運動距離作了定性分析;初步分析了滑坡轉化成泥石流的流態化機理。
  7. The wild cat landslide, long at rest beneath the terraced maize fields, orange - tree groves and earth - brick houses perched on the steep slope, was stirring

    沉寂已久的「野貓面滑坡體」 ,在玉米梯田、橘樹林和磚土房所處的陡坡之下正蠢蠢欲動。
  8. According to the special surface structure and actualities that the city is extending along the transportation line and river region because of the restriction caused by the mountains in the two sides of every cities in qingyang. the author thinks it is not good to squeeze out the existence of cave dwellings during the course of urban construction, and it is necessary to emphasize the symbiosis between urban and cave dwellings. the author conceives that it is feasible to develop group - dwellings in the steep - sides of mountain and especially to adapt to constructing " climb - slope cave dwellings which are covered with earth "

    根據慶陽特殊的地表結構和城鎮發展受兩側山體限制而沿交通線與川區無限蔓延的現狀,筆者認為在慶陽城鎮建設中不應完全排擠窯居的存在,而是要強調城鎮與窯居的共生,並設想充分利用兩側陡坡地帶發展居住組團模式,建設新型「爬坡式覆土窯洞」建築群落,這種「城鎮型窯洞」可作為城鎮建設空間橫向的延續和拓展,防止城鎮呈線狀無限蔓延的畸形發展態勢;提倡運用現代科學技術對傳統窯洞民居進行改造與創新,要加快新式窯居的試點建設;建議積極開發慶陽窯洞旅遊資源,並提出了「窯洞地產」和「綠色窯洞產業」的全新概念。
  9. The major activities involved during the construction stage of the project are cut and fill earthworks, slope works, earth retaining walls, irrigation buffer lake, detention ponds and tanks, sand bunkers and golf course capping and turfing

    2 . 3 . 1在工程項目的施工期內,主要的工程活動包括挖填土方工程斜坡工程護土墻灌溉緩沖湖靜水塘缸沙坑及高爾夫球場的加蓋草皮鋪設。
  10. He soon perceived that a slope had been formed, and the rock had slid along this until it stopped at the spot it now occupied. a large stone had served as a wedge ; flints and pebbles had been inserted around it, so as to conceal the orifice ; this species of masonry had been covered with earth, and grass and weeds had grown there, moss had clung to the stones, myrtle - bushes had taken root, and the old rock seemed fixed to the earth

    圓形的大巖石旁邊,還有一塊大石頭,這塊大石頭以前一定是用來頂住大圓石的滾勢而做墊石的,巖石四周塞了許多石片和鵝卵石來掩飾洞口,周圍又蓋上了些泥土,野草從泥土裡長了出來,苔蘚布滿了石面,香桃木也在那裡生了根,於是那塊大石就象是根深蒂固地長在地面上的一樣了。
  11. Analysis of earth slope stability under the seepage condition

    滲流作用下土質邊坡穩定性分析
  12. With the using of microsoft visual basic 6. 0, a multimedia computer - aided design system of small type pumping irrigation district is developed in this paper. provided with the live multimedia messages as well as a good man - machine conversation mechanism, this system can help the user to finish the planning of an pumping irrigated area such as the layout of canal system, the selection of pump models, the establishment of the irrigation program, the calculating of canals " parameters, the estimate of the project magnitude, the selection of the field constructions, the economic analysis of the project, the output of results, etc, a new oo ( object oriented ) programming method is adopted in this system, various softwares are integrated in this systems as well by the " automation " technic provided by vb, in addition, the multimedia technic is applied to this system for the first time, it makes the system easy to ope rate. as for the optimization of the canals " section, a new optimization method is adopted based on the existing theories about the canals " section, and in this way, with the purpose of minimizing the project ' s investment as well as a stalized canal, limited by the longituding slope, the canals " best feasible parameters can be deduced. furthermore, a integral method to reckon the earth work is developed in this paper, by this way, the estimate precision of the earthwork is enhanced notably. this paper includes the particular illumination for the developing procedure of each systems " segment, and in the end, the directions of the system are demonstrated in a sample area which lies in the zhaija village, taizhou city, jiangsu province, the running results showed that the initial purposes are achieved effectively, and it has a preferable practicability

    在渠道縱橫斷面優化方面,本文在利用已經比較成熟的縱橫斷面優化理論的基礎上,提出以工程總費用最小為目標函數,以渠道縱坡i為控制變量,以渠道不沖不淤流速及灌區允許地面比降為約束條件,通過縱橫斷面聯動優化的方法得到渠道的最佳工程可行的斷面參數。另外,針對部分地區的取土困難的狀況,本文採用積分法計算渠道工程土方量,從而大大提高了土方量的估算精度,有助於準確控制工程投資規模及資金投向。本文詳細闡述了該系統所採用的編程方法、系統構成、系統各組成模塊的開發過程以及灌區規劃所採用的優化方法及原理,最後應用本系統對泰州市翟家村機電灌區進行規劃設計,運行結果證明其操作比較簡便,界面友好,運行速度快,規劃成果合理,基本達到了系統預定的要求,具備較強的實用性。
  13. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  14. In the light of the study result that the energy dissipation ratio is higher as the spillway slope is gentle, to applied stepped spillway to overflow earth - rock dams with a certain height is proposed

    根據壩坡較緩時,階梯的消能率較高的研究成果,提出把階梯溢流應用於一定高度過水土石壩。
  15. The result is basically agreed with the calculations and can verified the theory for the stability of earth - rock dams under flood discharge, in the second part of this paper, several kinds of slope - protection materials are studied. according to the material property, a type of new flexible slope - protection material applied to overflow earth - rock dams - rubber panel armoring - is presented

    為了研究高土石壩在大單寬流量下的穩定性,本文第二部分主要對幾種不同的土石壩護面材料進行了探討,根據材料的特性和各自的受力特點,提出選用一種新型的柔性護面材料?橡膠板作為土石壩的防護材料。
  16. Only a dank ride in a motor - car up a dark, damp drive, burrowing through gloomy trees, out to the slope of the park where grey damp sheep were feeding, to the knoll where the house spread its dark brown facade, and the housekeeper and her husband were hovering, like unsure tenants on the face of the earth, ready to stammer a welcome

    只是當他的汽車在陰森的林中的潮濕空氣里開過,經過那有些灰色綿羊在那裡吃著草的園圃斜坡,來到那高丘上黑褐色的屋門前時,一個女管家和她的丈夫在那裡等著,預備支吾幾句歡迎的話。
  17. This research is does using the glass fiber for the hillside makes up the strong strengthened material, mixes in the bolivian filament in the different hillside slope, the change hillside place intensity, improves regarding is easy to have the earth stone to flow local the hillside to give strengthens, with reduces the earth stone to cave in the after scope area, in has the after destruction regarding guard earth shi liu and the earth stone class to reduce to is smallest, after the process experiment data knew, mixes in bolivia truly to be allowed to strengthen the hillside place to the textile fiber the intensity, but mixes in the glass fiber to the too steep slope not to be big to its overall intensity help, after again comes is mixes in the glass fiber the hillside avalanche, proliferates the area comparatively originally not to mix in the glass fiber the area to be small

    摘要本篇研究是利用玻璃纖維做為山坡地補強的強化材,在不同的山坡坡度上混入玻璃纖維,改變山坡地的強度,改善對于易發生土石流地區的山坡地給予加強,和縮小土石坍塌后的?圍面積,在對于防?土石流和土石流發生后的破壞減到最小,經過實驗后的數據得知,混入玻璃纖維確實可以加強山坡地的強度,但對過于陡峭的坡度混入玻璃纖維對其整體強度幫助不大,混入玻璃纖維的山坡崩塌后,所擴散面積較原本沒有混入玻璃纖維的面積小。
  18. The volcano iztacc huatl balances gracefully between earth and sky, as photographed from the north slope of its partner volcano popocat petl

    從波波卡特佩特火山的北面看去,旁邊的伊扎希瓦特爾火山正安詳的睡在天地之間。
  19. To find out thoroughly the reasons of slope ' s unstability, earth stress has been measured at slope by means of technique of temperature compensation and automatic recording

    測量應用採用完全溫度補償技術和自動化記錄系統的空心包體應變計進行,得出了該地區地應力分佈的基本規律。
  20. Circle slices method, with its simple principle and brief formula, is still popularly applied in assessment of earth slope stability. however, it exists two aspects of weakness in practical application. the first is difficult to search the most possible sliding surface ; the second is complicated to deal with slices

    圓弧條分法目前依然是工程中常採用的土坡穩定性分析方法,其原理簡單,公式簡潔,但在具體應用時,存在兩方面的困難:一是潛在滑動面不易確定;二是分條使計算過程較為復雜。
分享友人