elevation planning 中文意思是什麼

elevation planning 解釋
豎向設計
  • elevation : n. 1. 高舉,高陞;【醫學】挺起,隆腫。2. 升級;上進,向上。3. 高尚。4. 高處,高地,高度;海拔;(槍炮的)仰角,射角;【測】標高。5. 【建築】正視圖;立視圖。
  • planning : n. 計劃,規劃。 an overall planning 全面規劃。
  1. Answer 17 : the applicant can design the elevation of square according to the elevation of planning roads and railway tracks

    答:應徵人根據規劃道路和鐵路軌道的標高,自行確定廣場的設計標高。
  2. This article links to the plant no. 6 project, studying the measure of pressure reduction and energy removal of large caliber and long distance water delivery pipe in big difference of elevation and topographical form area. the writer gives new measure of pressure reduction and energy removal, according to the theory of pressure reduction and energy removal, planning a composite energy removal construction, and put to use effectively in many water supply projects. it is the first example that people use concrete construction to remove high pressure in large caliber and long distance water pipe in china

    本文結合西寧市第六水源工程,對高差大、地形地貌復雜地區大口徑長距離輸水管道消能減壓措施進行了研究探討,提出了全新的減壓消能方案,根據減壓消能原理,自行設計出了綜合式消能構築物,並應用於多項輸水工程中,效果良好,成為國內首例採用鋼筋混凝土構築物消除大口徑長距離輸水管道較高壓力的案例。
  3. With the enlargement of the scale of tourist activities and the elevation of the tourism position of gansu, many important issues and new challenges in the tourism development must be examined closely again. the development strategic planning must be formulated scientifically according to the new situations. based on the synthetically analysis of the relevant factors of the tourism development, such as development cond itions, market competition situation, tourism position, spatial distribution, etc, it must make the strategic development goal of tourist industry and then put forward the concrete and feasible countermeasures

    隨著甘肅旅遊活動規模的擴大和旅遊產業地位的提高,必須重新審視甘肅旅遊發展中的一些重大問題和面臨的新挑戰,制訂科學性、前瞻性強的發展戰略;必須綜合分析甘肅旅遊發展條件、市場競爭態勢、旅遊產業定位、產業總體布局等相關因素,在此基礎上制定旅遊業的戰略發展目標,進而提出具體可行的發展對策。
  4. Finally, by using of the mathematical model, it is calculated and predicted the effect of the different tongguan riverbed elevations as well as the different conditions of incoming water and sediment on the variance of the flood elevation and the tend of aggradation and degradation of the lower weihe river bed. it is answered quantitively the lessening extent of sediment silt and the decreasing extent of the flood elevation of the lower weihe river after 14 years on two different incoming water and sediment conditions with three different tongguan elevations, respectively 328m, 327m and 326m. these results supply important references to the planning of flood control and comprehensive regulations of the weihe river basin

    最後用驗證后的數學模型對不同水沙系列、不同潼關高程( 328m 、 327m 、 326m )下渭河下游的沖淤趨勢和洪水位的變化進行了預測計算,從定量上回答了潼關高程從328m降至327m (相當于潼關高程降1m )和潼關高程從328m降至326m (相當于潼關高程降2m )時,渭河下游14年之後各河段的減淤程度以及不同流量級洪水位的降低幅度,這些成果對于渭河下游防洪治理規劃的制定具有重要的參考價值。
分享友人