embankment foundation 中文意思是什麼

embankment foundation 解釋
堤基
  • embankment : 壩體
  • foundation : n 1 建設,創設,創立。2 基礎,根本;根據;地基,地腳。3 基金;捐款;用捐款創辦的事業;慈善機關;...
  1. The article discusses the strength analytical method of soil body dynamic stability apply to evaluate foundation liquescence of embankment dam combine with shock liquescence of dam foundation blanket sand layer about hada mountain project

    本文結合哈達山工程設計中壩基沖積砂層的震動液化問題,探討了土體動力穩定性的強度分析方法在評價土壩壩基液化中的應用。
  2. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  3. Hada mountain embankment dam is located at strong motion earthquake area with 7 degree. it is a sand - fill dam with clay core, stability of the dam under earthquake and the preventive of foundation liquescence is very important for the dam design

    哈達山土壩是位於七度地震區,坐落在厚覆蓋層上的粘土心墻砂殼壩,壩體的抗震穩定、基礎的抗震液化是本工程的技術關鍵問題。
  4. As a new foundation improvement technology, the cast - in - situ concrete thin - wall pipe pile ( pcc pile ) is applied widely in the construction of the highway, civil architecture, haven and sea embankment etc. the pcc pile has a great prospect because it has superiority in the treatment of soils, such as construction period, cost and environment protection

    現澆混凝土薄壁管樁(簡稱pcc樁)及其復合地基是一種全新的地基處理新技術,已應用於高速公路、民用建築、港口、海堤等工程建設中, pcc樁在處理效果、工期、造價、環保等方面具有較大的優越性,因此在地基處理中具有廣闊的應用前景。
  5. According to the theory, the method of using half - rigid pile reinforce the embankment below the corbel of the approach slab which form a composite foundation and realize rigidity gradation, is put forward in this paper and the formula to calculate pile - soil stress ratio in light of visic curvity expansive theory is also deduced here which can be used in design

    應用這一理論,本文提出了採用半剛性擠密樁復合地基加固橋頭搭板枕梁下路堤實現,路、橋的剛柔過渡方法。針對低強度半剛性擠密樁計算理論的現狀,本文應用魏西克( visic )擴孔理論推導了計算樁土應力比的理論公式,可供設計階段採用。
  6. Performance of cast - in - situ concrete thin - wall pipe pile composite foundation under road embankment

    路堤下現澆薄壁管樁復合地基工作特性分析
  7. Abstract : taking “ the great embankment around the tai lake project ” as an example, in which we have repaired a small part of collapsed embankment successfully. some valuable methods and steps of mending collapsed embankment on mollisol foundation are studied in the paper

    文摘:結合環湖大堤工程成功處理局部塌方堤防的經驗,探討軟土地基塌方堤防處理的一些有效方法和步驟
  8. Numerical analysis of settlement of soft clay foundation and embankment

    路堤軟基變形有限元計算分析
  9. In this paper, on the basis of the numerical analysis with the concept of equivalent soil mass with reinforcement and shake table model test, the calculation of high loess embankment with geogrid - reinforcement in highway is carried out under static loading, and the dynamic response of high reinforced sand - gravel embankment with grogrid - reinforcement in highway is tested under earthquake. the behaviors of loess embankment are indicated as the following : ? he stress and deformation varies with reinforcement design conditions and foundation types

    本文通過將土工合成材料與土體視為加筋等效土體的數值計算方法和振動臺模型試驗,以加筋黃土高路堤和豎直擋板加筋砂礫土高路堤為研究對象,計算分析了不同堤基上不同加筋設計條件下黃土高路堤的靜應力及變形變化規律,試驗研究了不同加筋條件下砂礫土高路堤的動力反應特性。
  10. Engineering measures for pre - consolidation and treatment of cut soft foundation with high pressure jet grouting pile or anti - slide pile are presented, together with engineering measures for consolidation of inclined soft embankment foundation with gravel pile and lateral restrained pile, and the methods of design, construction are also introduced in detail. 6

    提出了高壓旋噴樁或抗滑樁預加固整治塹軟基的工程措施;提出了採用碎石樁和側向約束樁加固傾斜基底路堤軟基的工程措施,並對設計、施工、檢測進行了詳細介紹; 6
  11. This study focused on construction technology of geogrid reinforced clayey soil embankment on common earth foundation. it is conducted according to a test road located in tongchuan, north - west china ' s shaanxi province. long term strain of geogrid in the embankment was researched

    本文以陜西省省道305線土工格柵加筋路堤為實體工程,通過試驗路修築,對土工格柵加筋路堤的施工技術進行了研究,分析了碾壓中的格柵損傷問題,對路堤中土工格柵的應變進行了測試與分析,並對土工格柵加筋路堤邊坡坡面防護技術進行了研究。
  12. Product function : soft soil subgrade strengthening, reinforced embankment & slope, strengthening separation, bounding deformation of foundation, prevent road from reflection crack, increasing the intensity of subgrade. it can strengthen soft subgrade of kinds of roads and railways ; prevent road from reflection crack ; enhance the strength of subgrade ; reinforcedriverbank, embankment and slope ; homogenize the stress ; adjust settlement ; improve the stability and bearing capacity of the basement ; strengthen road and bridge tops

    產品功能:軟土路基加強,路堤邊坡加筋,加強隔離,約束地基變形,防止道路反射裂體,提高路基的強度.各種道路、鐵路等軟路基加強,增強路基的強度;河岸、路堤、邊坡起加筋,均化應力,調整沉降,提高基底穩定和承載力;道路橋臺面的加強。
  13. Runyang changjiang highway bridge is a main bridge of across changjiang in jiangshu province, with six lances for 100km per hour designing vehicle speed. it ' s deep - large rivet foundation at the north embankment, in shiye, zhenjiang. is a important part of the suspension bridge

    潤揚長江公路大橋是江蘇省「四縱四橫四聯」的公路主骨架和跨長江通道的重要組成部分;是一座設計車速為100km h的六車道高速公路特大橋。
  14. The technology of embankment filling and foundation bed reinforcement in soft - soil foundation

    軟基地段路堤填築及基床加固技術
  15. By adjusting pile lengths and pile numbers, the settlement of pile foundation increased from the main span to the side span to such an extent that it matched the settlement of the embankment at both ends of bridges without any special treatment

    分別通過調整樁長和樁數,使樁基沉降從橋梁主跨逐步增大,而在路橋連接處使邊跨橋墩沉降與橋坡填土沉降基本一致,實現路橋沉降協同,從而開辟了解決橋頭跳車問題的新途徑。
  16. Mud foundation treatment of shajing river embankment in baoan district of shenzhen city

    深圳市寶安區沙井河堤防淤泥地基處理
  17. Application of low strain dynamic measuring technique by reflected wave method to pile foundation of standard embankment

    淺談應力波反射法基樁檢測的方法局限性
  18. However, the researching work on mechanic characteristics and deformation law of the composite ground under flexible foundation as embankment is not enough, and have to use the design formula of the composite ground under rigid foundation for it. this condition restricts the application of the composite ground on the highway engineering in a great extent

    但是,對于路堤這樣的柔性基礎下水泥粉噴樁復合地基,由於研究較少,有關這種地基的力學性狀和變形規律等基本問題都尚未弄清楚,設計中只好借鑒剛性基礎下水泥粉噴樁的計算公式,不能很好的指導工程實踐,大大限制了水泥粉噴樁在高等級公路軟基處理中的應用。
  19. A model test in an organic glass flume with a scale of 1 : 100 was performed to demonstrate the generation and evolution of piping in embankment foundation with different depths of cut - off wall

    摘要通過比例為1 : 100的有機玻璃模型槽進行模型試驗,模擬二元堤基條件及不同防滲墻深度下,堤基內管涌的發生和發展過程。
  20. Geosynthetics have been used to improve bearing capacity of poor foundation in different practical engineerings, such as foundation of embankment, sea wall, oil tank and building

    實踐中,加筋地基主要用於堤的軟基加筋、油罐和氣罐及條形基礎的地基加筋。
分享友人