facility cost 中文意思是什麼

facility cost 解釋
設備成本
  • facility : n. 1. 容易,簡易,輕便。2. 機敏,靈巧,流暢。3. 〈常 pl. 〉方便,便利,設備,器材,工具,裝置;機構。4. 和善,柔和。
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  1. Build - transfer - operate - private proponent finances and constructs facility on a turn - key basis assumes cost overrun, delay, specified performance risk

    -私營提議人在準備將其移交的基礎上籌措資金並建造該設施(包括承擔成本高出預算、工程延誤及質量保證等風險)
  2. Design a closed cycle deinking facility is technically feasible, the cost of the facility, however is high and not currently justifiable economically

    設計一個封閉循環的脫墨設施在技術上是可行的,但設施的費用較高,目前在經濟上尚不盡合理。
  3. First of all, this article has been clear several concepts about construction cost, development cost and complete cost. the construction cost constructs by the preliminary engineering cost, the infrastructure expense, the construction and installation engineering cost, the necessary facility spends. the development cost constructs by the land cost, constructs the cost, the development indirect expense. the complete cost constructs by development cost and period expense

    針對這一社會熱點問題,本文以長影世紀村一期工程為例,從成本控制理論入手,敘述了房地產開發成本構成,按照房地產開發進程的先後順序進行展開,較為詳細地論述了項目前期、規劃設計階段、招標采購環節、施工階段、銷售環節、期間費用的成本控制措施。
  4. Income from settlement of projects : refers to the income recei ved by the construction enterprise / unit from the completed portion of the proje ct through settlement procedures with the contractee during the reference period, and other charges to the contractee as operational costs, such as facility fee, labour insurance premium, moving cost of construction unit, as well as various types of claims to the contractee

    工程結算收入:指企業(或單位)按工程的分部分項自行完成的建築產品價值並已與甲方在報告期內辦理結算手續的工程價款收入,以及向甲方收取的除工程價款以外的按規定列作營業收入的各種款項,如臨時設施費、勞動保險費、施工機械調遷費等以及向甲方收取的各種索賠款。
  5. The resuit indicates : wheil treating siightiy polluted source water of xiang rivet, optimized coagulation will improve the effect of reducing organics remarkably ; gac has good effect in reducing the dbpfp and organics of xiang rivef, but the effect in reducing dbp is more obviously ; the process of " improving gac by optimized coaguiation " can not only has a wonderful result of reduction in dbppp and organics, but also improve the effect of gac evident1y and decreasing the capital cost for a gac facility ; although optimized coagulation increase the quantity of alum dose, but the level of aluminum of treated water will not beyond the standard level ; different processes will have different resu1ts in lessening the amount of organics and dbp, so we should adopt treatment process by considering the requirements of treated watel

    試驗結果表明:在對受到微污染的湘江源水的處理時,強化混凝工藝對于去除有機物具有比較明顯的作用;活性炭吸附技術處理湘江源水時,其對去除水中消毒副產物前體具有明顯的效果,對去除水中有機物效果也很好,但對消毒副產物的去除效果好於對有機物的去除效果;活性炭與強化混凝聯用工藝不僅能更有效地去除水中有機物以及消毒副產物前體,還能增加活性炭的吸附性能,從而減低費用;雖然強化混凝投加了比傳統混凝多的混凝劑,但並不會使出水中鋁離子濃度超標;不同工藝對水中有機物和消毒副產物的去除效果各不相同,應根據出水要求而選擇不同的處理工藝。
  6. In the next, the paper focuses on explaining the recognition of waterway fixed assets, and puts forward if the potential service from port facility such as bulwark, navigation mark, beacon and so on, which bear the property of public goods can not be dominated or possessed by the corporation which constructed them, the expenditure of construction and repairs should be treated as the expense of the year ; if the potential service can be dominated by the corporation or other port corporations pay for the use of above - mentioned port facilities, then the expenditure of construction should be regarded as the cost of fixed assets

    由於水運固定資產具有其本身的特性,它的確認一直是水運會計理論界的一個難題。本文提出:如果防波堤、航標、燈塔等具有公共產品性質的港務設施的服務潛能不能為企業所擁有、控制,那麼就應將建造、修理支出作為本期費用;如果它們的服務潛能為企業所擁有或者因其它港口企業使用它們而使本企業受惠,那麼就應將有關上述設施的成本支出計入固定資產進行確認及核算。
  7. Year, cost and establish closed factory building and equipment of assembly lineses at 8 million, have already developed one of the mosts advanced manufacturing enterprise of the biggest, facility into scale of emulsion trade now

    河北同樂乳膠製品有限公司成立於1991年是河北省最早一家專業生產乳膠製品的企業,經過5年的飛速發展,耗資800萬創建了半封閉式廠房和流水線設備,現已發展成為乳膠行業規模最大、設施最先進的生產企業之一。
  8. The government should be aware of the problems confronting singapore s esplanade, such as water leakage through the canopy glass, cleaning difficulties, excessive air - conditioning costs, strong draughts at the piazzas during typhoons, and the heavy construction cost of the canopy. there is a possibility that hong kong may be burdened by the same problems. foster s design will make the facility inflexible

    政府應留意新加坡濱海藝術中心( esplanade )的情況,包括天篷玻璃會漏水、清潔困難、空調昂貴、臺風會令露天廣場成為風口、天篷的建築成本昂貴,將成為香港人的負擔、 foster的設計令場館缺乏彈性,以及管理模式不詳等問題,引以為鑒。
  9. Secondly, through the survey of expert and the methodology of key success factor ( ksf ), it concludes the concrete ksfs of air product and water processing facility product. the ksfs of air product : brand name, service assurance, marketing network, large scale economic production, r & d ; the ksfs of water processing facility product : quality management, r & d, service assurance and marketing network - thirdly, through the methodology of value chain and core competence embodied with defined key success factor and main success factor, this paper analyses and evaluates the internal environment. it points out that air product has these advantages such as quality management competence, r & d competence, service assurance competence, large scale production competence, and has these disadvantages such as marketing network, brand name, cost control

    本文首先運用pest分析法和波特的五種競爭力量模型,對奧神公司的臭氧空氣系列產品和臭氧水處理工程產品所處的宏觀環境、競爭狀況進行了分析和評價,認為奧神公司產品面臨著國家產業政策扶持、不斷增長的環保需求、人們對清潔空氣和潔凈水的需求增長等發展機會,也面臨著行業市場不規范、市場競爭激烈、用戶討價還價能力強等威脅;其次,通過專家調查,運用關鍵成功因素理論,分析得出臭氧空氣凈化系列產品市場的關鍵成功因素是品牌建設、服務保障能力、營銷網路建設、規模經濟水平、產品研發能力:臭氧水處理設備市場的關鍵成功因素是質量管理能力、研發創新能力、服務保障能力、營銷網路建設;再次,運用價值鏈理論、核心競爭力理論並結合所確定的關鍵成功因素和主要成功因素對奧神公司產品所處內部環境進行了分析,認為臭氧空氣凈化系列產品擁有質量管理能力、產品研發能力、售後服務保障力、規模生產能力的優勢,同時面臨著營銷網路建設、品牌建設、成本控制能力方面的劣勢。
  10. With the growing market trends to outsource and privatize non - core services by large conglomerates and multinational corporations, urban group focuses on this opportunity to enhance its services in facility management. developed from its total quality management approach, urban groups facility management service emphasizes people, process and space performance. services include facility space planning and design, cost control, operations and maintenance, supporting services, and value and process improvement services, which aim to enhance the productivity of the facility assets for different organizations to achieve the expected business results

    富城集團的設施管理服務概念源自全面優質管理理念,強調人才流程及空間表現三者的相互配合,服務范圍涵蓋設施空間策劃及設計成本控制設施運作及保養支援服務提升設施價值和改善設施運作流程等,協助各企業提高生產效率,強調因應不同機構的營運而作出配合,達致業務持續增長的目標。
  11. In the course of technical innovation, qiandongshan mill make the most of existing facility, tap the latent power, improved facilities efficiency ; adopted new process and energy - saving facilities, the production quota improved ; many facilities were cut down, gained it ' s ends of energy - saving and comsumption - lessening ; by technical innovation, the cost of ore processing droped greatly, benefit is remarkable in society and economy

    摘要鉛硐山選礦廠生產技術改造充分利用現有設備設施,挖潛增效,提高了設備利用率;採用新工藝和節能設備,大幅度提高了生產技術指標;裁減大量設備,達到節能降耗的目的;通過技術改造,選礦成本大幅下降,取得了顯著的經濟效益和社會效益。
  12. The first project in the industrial city will be an aluminum panel plate facility with a designed annual capacity of 400, 000 tonnes. the total cost of investment of the panel plate project will amount to about hk 3 billion

    集團于工業城內之首階段項目為興建一家年設計產量達400 , 000噸的鋁板帶廠,該廠的總投資成本約為30億港元。
  13. Urban group leverages these services through comprehensive facility management planning prior to the completion of the facility assets. services include infrastructure design, logistics, human capital allocations, maintenance schedules, work flow design, cost control and the overall supply chain design and implementation. utilizing these leads to the long - term and cost - effective operational environment for customers

    富城集團的設施管理服務早在項目落成運作之前,已開始為各企業客戶提供周詳的設施管理計劃,其中包括基建設計物流管理人力資本安排維修保養運作流程設計及整體供應?的成本控制等,令各項設施在發展策劃階段,便已具備一個符合成本效益的運作環境。
  14. Refers to the income received by the construction enterprise from the contracted project through settlement procedures, and other charges to the contractores as operational costs in addition to the value of the project, such temporary facility fee, labour insurance premium, moving cost of construction equipment, as well as various types of claims to the contracte

    指企業承包工程實現的工程價款結算收入,以及向發包單位收取的除工程價款以外的按規定列作營業收入和各種款項,如臨時設施費、勞動保險費、施工機械調遷費等以及向發包單位收取的各種索賠款。
  15. The water processing facility product has these advantages such as quality management competence, marketing network competence, service assurance competence, r & d competence, and has these disadvantages such as cost control

    水處理工程產品擁有質量管理能力、營銷網路、服務保障力、產品研發能力的優勢,但也面臨著成本控制劣勢。
  16. Fans consume more power than the pumps of a liquid system, but if the unit is installed in a facility that uses air distribution, only a slight power cost is chargeable against the solar space - heating system

    風扇比起液體系統的泵,需要更多能量,但是如果工廠中建立的使用空氣分配的單元,相對太陽能空間加熱系統,僅僅需要很少的能量付出。
  17. Hspc has specialized in developing, manufacturing and selling magnetic resistance head, and focused on establishing a world - class manufacturing facility, with leadership in quality, cost, and product delivery for more than 11 years

    海量公司主要開發、生產、銷售磁阻磁頭,始終致力於創建世界一流的生產基地,務求在質量、成本控制和產品發貨等方面保持領先地位。
  18. Services include project design, facility planning, logistics management, cost control and production lines development

    服務范圍包括項目設計設施策劃流程管理物料及成本監控,與及生產線安排等。
  19. A major cost - saving measure was also achieved by reducing fuel costs substantially with the coal - fired facility commencing operation since december 2001

    集團自二零零一年十二月開始採用燃煤熱電生產設施后,大大減低了燃料開支,成功將生產成本顯著減省。
  20. Close to the end of 2001, the construction work of the coal - fired facility for producing steam and electricity was completed, indicating that a major cost - saving measure was achieved

    於二零零一年底前,本集團之燃煤熱電生產設施竣工及投產,成功實踐一項主要節省成本之措施。
分享友人