fill area 中文意思是什麼

fill area 解釋
填充區域
  • fill : vt 1 注滿,裝滿,裝填,填充。2 (風)張滿(帆),使(帆背)受風。3 充滿,充實(知識等);普及。4 ...
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  1. Source of every business land belongs to administrative transfer or the estate of derate price money mortgages, the basis concerns a provision, its area structure has registered legally, can agree alone with the building on mortage, when punish pawn, must entrust city to praedial auction undertakes auctioning all right or be sold off, praedial auction is in charge of buckling all right hair should fill the price money that make, the estate of every administration, institution, do not get do sth without authorization to offer guaranty to assure for the enterprise

    凡企業土地來源屬行政劃撥或減免地價款的房地產抵押,根據有關規定,其地面建築物已經合法登記的,可同意單獨以房屋作抵押,在處分抵押物時,必須委託市不動產拍賣行進行拍賣或變賣,不動產拍賣行負責扣發應補交的地價款,凡行政、事業單位的房地產,不得擅自為企業提供抵押擔保。
  2. Basis " beijing already bought public housing to appear on the market offer executive way " regulation, change cost price to buy the town dweller of public housing according to the room, can according to in those days the room changes cost price 1 % fill after making gold of land sell one ' s own things or land profit, to the building room of land of place area, county is in charge of bureau application to handle property of commodity room house card

    根據《北京市已購公有住房上市出售實施辦法》的規定,按照房改成本價購買公有住房的城鎮居民,可以按照當年房改成本價的1 %補交土地出讓金或土地收益后,向房屋所在區、縣國土房管局申請辦理商品房房屋所有權證。
  3. The cross section area of the internal sprue of the die casting dies designed should be of proper value, and matches perfectly the fill speed, the fill time and injection pressure in case that the die casting dies fail in the design

    設計壓鑄模時應當確定恰當的內澆道截面積,並使之與充填速度、充填時間和壓射比壓保持較好的匹配,以防止壓鑄模設計的失敗。
  4. In this paper, the software for the die casting technology parameters design is built based on the optimization of the die casting system matching, and is used for the design of the die casting technology parameters, such as the cross section area of the internal sprue, the fill speed and the fill time etc

    文章基於壓鑄系統匹配優化的思想,建立壓鑄工藝設計軟體,使用軟體進行內澆道截面積、充填速度和充填時間等壓鑄工藝參數的設計。
  5. As one type of dredging equipment, a cutter suction dredger can dredge material and fill land by continually cutting soil and transporting slurry to the disposal area

    絞吸式挖泥船作為一種疏浚設備,單船作業可疏浚和吹填。它能連續地挖掘和輸送泥漿,因而具有廣泛的適用性和經濟性。
  6. Hada mountain embankment dam is located at strong motion earthquake area with 7 degree. it is a sand - fill dam with clay core, stability of the dam under earthquake and the preventive of foundation liquescence is very important for the dam design

    哈達山土壩是位於七度地震區,坐落在厚覆蓋層上的粘土心墻砂殼壩,壩體的抗震穩定、基礎的抗震液化是本工程的技術關鍵問題。
  7. The cross - section area of the internal sprue, the fill speed, the fill time and injection pressure are important die casting technology parameters

    摘要內澆道截面積、充填速度、充填時間和壓射比壓都是重要的壓鑄工藝參數。
  8. In computer graphics, to fill an area of display, e. g. with a colour, a cross hatched pattern, etc

    在計算機圖形學中,用色彩或交叉陰影線等來充填某個顯示區。
  9. For the high - class highways builded on the area of lacustrine deposits soft soil, because earth fill of subgrade is very high and construction period is very short, the controlling of subgrade stability and settlement are the two key techniques

    對于通過湖相沉積軟土地區的高等級公路,當路基填土較高、工期較短時,必須解決地基穩定性控制及沉降控制兩個關鍵技術問題。
  10. The buoy helps fill in the information gap over the data - sparse area

    由於香港國際機場以西一向欠缺氣象數據,浮標氣象站正好彌補不足。
  11. New applicant must complete this part. others need to fill in changed area ( s ) only

    (入會申請者必須填寫。續會者只須填寫有變更部份,其餘可留空。 )
  12. Article 4 with respect to import and export commodities in the bonded area, the consignee, the consignor, or their agent shall fill in the declaration form for import and export commodities, and present the relevant documents in accordance with provisions

    第四條保稅區進出口貨物,應當由收貨人、發貨人或者他們的代理人填寫進出口貨物報關單,並按規定交驗有關單證。
  13. Stiff arc, with heat concentrated, easy to fill welding wire, so especially suitable for wire filling welding in bicycle area

    電弧挺度好,熱量集中,填絲容易,特別適宜自行車等行業的填絲焊接。
  14. Test and study on the influence of operational water level of sanmenxia reservoir to scour and fill of the reservoir area

    三門峽水庫運用水位對庫區沖淤影響試驗研究
  15. For the area of tianjin port which is short of sandy material, cement solidified soil, used as a new type of fill material, can not only help reduce the long distance transportation of sand fill, save energy and cut down engineering cost, but also make full use of the mucky clay dredged from basins and waterways

    摘要採用水泥固化土作為新的充填材料,對于缺少砂土的天津港地區,不僅可以減少砂料長途運輸,節省能源,降低工程造價,而且可以充分利用港池和航道開挖的淤泥質粘土。
  16. We are seriously concerned that due to the collapse of the newly constructed seawall in area w30 of the tseung kwan o reclamation contract ( tko contract ), the planned delivery of 3. 6 million tonnes of public fill from the tko contract to the pbr1 contract could not be made. instead, marine sand had to be used in the pbr1 contract

    委員會深切關注到,在將軍澳填海工程合約( 「將軍澳合約」 )第w30區新建的海堤倒塌,以致利用將軍澳合約為竹篙灣第一期填海工程合約供應360萬公噸公眾填料的計劃未能實現,而須在竹篙灣第一期填海工程合約中使用海砂作為替代。
  17. The results indicate that for the same pump intensity, the temperature and thermal stress distribution in the disk are not only related with the medium ' s geometry and the special distribution of pump intensity but also related with the fill factor of pump area

    結果表明,在相同的抽運功率密度下,激光介質中的溫度分佈和熱應力分佈不僅與激光介質幾何構型及抽運光空間分佈有關,還與抽運光斑在介質表面的填充因子密切相關。
  18. Join after protecting personnel to nod medical establishment surely in the choice, answer to inform oneself choice the responsible orgnaization that is in an unit, unite by unit collect fill in " go to a doctor of individual of insurance of primary medical treatment nods beijing surely medical establishment declares summary table " center of office management of insurance of medical treatment of county of newspaper place area, the center assumes task circumstance to be examined and approve certainly as a whole according to medical establishment

    參保人員在選擇定點醫療機構后,應將自己的選擇告知所在單位的負責機構,由單位匯總並統一填寫《北京市基本醫療保險個人就醫定點醫療機構申報匯總表》報所在區縣醫療保險事務治理中心,中心根據醫療機構承擔任務情況統籌確定審批。
  19. This project fill up the vacancy of the north of china in the rubber sulfuration control system, its attain the native advance level in the automation control area, and it pass the appraise of province science and technology committee

    此項目填補了華北地區在橡膠硫化控制系統的空白,科技水平達到國家先進水平,並且通過了省科委鑒定。
  20. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
分享友人