fill concrete 中文意思是什麼

fill concrete 解釋
回填混凝土
  • fill : vt 1 注滿,裝滿,裝填,填充。2 (風)張滿(帆),使(帆背)受風。3 充滿,充實(知識等);普及。4 ...
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  1. Stress analysis of the rock fill dam with asphaltic concrete core wall

    冶勒堆石壩瀝青混凝土心墻型式及尺寸研究
  2. Permeable durability reinforcing agent used for concrete surface is a material sealing surface of concrete, and it can permeate into inner of concrete and fill or block the pores of concrete surface with dry crystal or emulsoid generated by reaction between it and chemical compound in concrete

    混凝土表面用滲透型耐久性增強劑是一種針對混凝土表面的滲透封閉型材料,其可滲入混凝土內部,並通過乾燥結晶或與混凝土內部相關物質反應生成乳膠體將混凝土表層的孔隙填充、堵塞,對已有混凝土結構的防護具有重要意義。
  3. Recently, using solid clay brick is gradually prohibited, so the new wall material is required to fill up the new architecture. many sections research on this field, using fly ash to develop new building materials is the mostly adopted method, among the new building materials, fly ash foamed concrete is a noticeable one because of its outstanding merits such as light weight, heat preservation, sound insulation and good resisting earthquake. using fly ash to develop foamed concrete can not only become fly ash into resources, but also provide a new kind of building materials for the innovation of wall materials, which has good economy and society ben efits

    近年來,由於墻改「禁實」政策的實施,市場急需新的墻體材料來填補新建築所需,許多單位相繼開展了各有關研究,綜合利用粉煤灰研製開發新型建材逐漸成為了主流,其中多孔混凝土特別是粉煤灰發泡混凝土,正以它突出的輕質、保溫、隔音、抗震效果好等優點,成為一種引人注目的建築材料,利用工業固體廢棄物粉煤灰研製發泡混凝土不僅能實現粉煤灰的資源化,而且還可為墻體材料的改革提供一種新型建築材料,具有較好的經濟效益和社會效益。
  4. Application of concrete extrusion sidewall in face rock - fill dam in shuanghekou

    混凝土擠壓邊墻在雙河口面板堆石壩中的應用
  5. The concrete demand product pleases fill in here

    具體需要產品請填寫在此
  6. The foundation for an earth - fill dam would be the natural soil or rock on which the dam is placed. concrete footings or piles and pile caps are often referred to as foundations without including the soil or rock on which or in which they are placed

    一)關于支持基礎結構影響土壤. (三)關于基礎結構支持關巖. (二)結構得到一堆地基樁,使樁可安裝在土壤和終止一切小費支持是從土壤中,也可以安裝,使復蓋巖小費.結合混凝土地基土壤和巖石上的地基或支持
  7. In this paper, the study of construction technology of concrete facing rock - fill dam in frigid zone has been done in accordance with construction and practice of lianhua hydropower station ( concrete face rock - fill dam ) in mudanjiang, heilongjiang province

    本文針對嚴寒地區砼面板堆石壩施工技術研究方面的不足,結合我國黑龍江省牡丹江上的蓮花水電站,面板堆石壩的施工實踐,通過施工的原型實驗,對砼面板堆石壩在嚴寒條件下的施工技術進行了研究和總結。
  8. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  9. It is high performance concrete of low water - binder ratio. with its own gravity and without any vibration, it can fill up the space automatically. with high adding quantity of fly ash and slag, high quality water reducing agent and other compound admixture is the most important technology of this kind of high performance concrete. scc focus on high workability at the same time on high strength and high durability through choosing the composite of aggregate, additives, content of cementions material, admixture reasonably and the optimum design of mix proportion

    本文研究了採用吉林省本地原材料和常規生產工藝配製c40自密實混凝土的製作技術,採用水膠比、粉煤灰摻量、砂率、膠凝材料總量四個因素進行配合比的正交設計,試驗分析了自密實混凝土拌合物的工作性以及硬化后的力學性能、耐久性和生產與施工注意事項,並對其經濟性做出了客觀評價,本次試驗為吉林地區自密實混凝土的推廣應用提供了數據基礎。
  10. According to their building material, dams are described as concrete, earth fill, rock fill, hydraulic fill and so on.

    按照築壩所用材料,可以把壩稱為混凝土壩、填土壩、堆石壩,水力沖填壩等等。
  11. Test and research on asphalt concrete core of rock fill dam

    瀝青混凝土防滲墻施工技術
  12. It also includes a consideration of possible alternatives, such as a concrete gravity dam or an earth - fill embankment dam

    還要考慮到可能的備選方案,比如是選擇混凝土重力壩還是選擇填土築堤大壩。
  13. The dam for chahanwusu hydropower station is the first one among the concrete faced rock - fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in china

    摘要察汗烏蘇水電站水庫大壩為目前在建的河床趾板建在深厚覆蓋層上國內首座百米級的混凝土面板堆石壩。
  14. Combined with a concrete face rock - fill dam in process, the simulation analysis on the face slab ' s temperature field and temperature stress is processed in connection with the condition of temperature sudden drop caused by daytime temperature differences and cold wave and so on during the construction period

    摘要結合某在建的混凝土面板堆石壩,針對施工期日溫差及發生寒潮等氣溫驟降情況,進行了氣溫驟降條件下面板溫度場及溫度應力的全過程模擬分析。
  15. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔樁基礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心樁、預制預應力混凝土空心樁的成樁工藝、填石壓漿混凝土的配合比設計原理及影響強度指標的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心樁基礎的質量檢測方法及標準;並在此基礎上,深入分析了樁側、樁端承載能力,提出了填石壓漿混凝土空心樁的設計計算理論和方法。最後,論證了空心樁新工藝的可行性、適應性、經濟性,為大力推廣應用空心樁新技術提供了可靠的技術資料。
  16. The curve of mix proportion kept away from the restricted zone in order to provide enough voids in mineral aggregate ( vma ) to fill the high content of conductive materials. conductive powder can regard as a part of filler in asphalt concrete

    導電瀝青混凝土的級配設計採用superpave設計方法,合成曲線盡可能遠離禁區,提供足夠的礦料間隙率來填充高摻量的導電相材料。
  17. Self - densifying high performance concrete is well - performing concrete with the good performance of fluidity, anti - segregation and filling - up - space. with its own gravity and without any vibration, it can automatically fill up the space in and between fixed shutters and form self - densified concrete structure of ideal dynamic property and durability, therefore, it can accelerate construction progress of a building, shorten the construction period, secure concrete quality and improve the building ' s durability. in the mean time, it is conducive as well for environment protection and effects remarkable social and economic efficiency

    自密實混凝土屬于高性能混凝土,它具有高流動性、高抗離析性、高填充性的性能,在自重作用下無需振搗,自行填充模板空間,形成自密實的混凝土結構,有良好的力學性能和耐久性能,可以加快工程建設進度、縮短工期、有效控制混凝土的質量、提高建築物及構築物的耐久性,並有利於環境保護,具有較高的社會和經濟效益。
  18. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  19. Experiment on self - compacting concrete filling rock - fill

    自密實混凝土充填堆石體的試驗
  20. At mean time, it is very important to study and adopt new dam construction techniques in the world, such as to focus on the wide application of the rock - fill concrete deck and rolled asphalt concrete core dams

    同時,學習和引進國外壩工新技術,如重點推廣應用的混凝土面板堆石壩和碾壓式瀝青混凝土心墻壩等新壩型。
分享友人