fixed saddle bridge 中文意思是什麼

fixed saddle bridge 解釋
固定鞍式橋
  • fixed : adj. 1. 固定的;確定的,不變的,固執的。2. 【化學】凝固的,不易揮發的。3. 〈美口〉(在經濟上)處境…的。4. 〈美俚〉(比賽等)通過作弊預先安排好結果的。
  • saddle : n 1 馬鞍;(腳踏車(自行車)等的)鞍。2 (羊等的)帶肋[脊]骨的肉。3 鞍形架,鞍狀物。4 【地質學;...
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. Through the calculating example results and the comparisons with other calculating theories, it is proved that the calculating formulas of the combined geometry curve theory is valid, practical and accurate. it can be used in the calculation of line shape at the preliminary design, and can meet the engineering need. ( 3 ) this thesis researches systemically on the calculating theory of the suspension bridge ’ s cable system, including calculating design line shape and internal force, erection line shape of cable and pre - displacement of saddle without loads, the fixed position for erecting cable and amendatory method of cable ’ s unstressed length

    通過算例驗證了混合線形理論公式的實用性和正確性,並且與其它計算理論的結果比較,證明公式有足夠的精度,可用做初步設計中主纜線形的計算,能夠滿足工程的需要; ( 3 )對自錨式懸索橋主纜系統計算理論進行了系統研究,包括成橋線形和內力計算、空纜線形和內力計算、鞍座預偏量計算、索夾安裝位置計算和索鞍處主纜無應力長度修正方法。
  2. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  3. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸索橋的施工控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了施工計算,提出本文關于懸索橋的主纜無應力長度控制、索鞍預偏量控制、錨跨張力控制、絲股架設控制、索夾安裝位置與吊索長度控制的方法;介紹了吊梁階段鞍座頂推量的確定與控制方法,分析了施工階段懸索橋的線形變化過程。
分享友人