floating depth 中文意思是什麼

floating depth 解釋
漂行深度
  • floating : adj. 1. 漂浮的,浮動的,流動性的。2. 【醫學】游離的。3. 移動的;不定的。4. (塗工的)第二道(漆等)。5. (船貨)未到埠的,在海上的,在運輸中的。
  • depth : n. 1. 深;深度。2. (色澤的)濃度;(聲音的)低沉;(感情等的)深厚,深沉,深刻。3. 進深。4. 〈常 pl. 〉深處;深淵,深海,海。5. 正中,當中。6. 深奧,奧妙。
  1. On the principle of making full use of the precious coastal resources of the country and utilizing the coastal line to its capacity, in - depth studies are made from various aspects of the plan layout and mooring arrangements for the three floating docks to take the favorable conditions for construction of the control waters as the operating areas of ships for docking, showing the appropriate design ideas of making the best use of the available resources

    以充分利用國家寶貴岸線資源,提高岸線利用率為原則,從多個角度對三艘浮船塢的平面布置形式和泊碇方式進行深入探討,充分利用控制區特殊的建設要求作為塢前操作水域,體現出物盡其用,恰如其分的設計理念。
  2. Analysing the reasons of floating for objects in the reference system of non - inertia, the paper discusses the relationship between the depth and time, as well as the floating object and its acceleration, these relationships will provide convinient to explain some questions of the hydrostatics

    摘要通過分析浮體在非慣性參考系中浮沉的原因,探討浮沉的深度與時間的關系、浮沉體積與加速度的關系,這些關系將給解釋一些流體靜力學問題帶來方便。
  3. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  4. Abstract : the cause of underwater concrete reinforcing cage up - floating accident is improper operation, such as loose - placement of reinforcing cage, fast - drawing of conduct pipe, improper embedded depth of conduct pipe ; and the poor quality of concrete, for example, the slump, sand percentage, adhesiveness and initial setting time don " t meet requirement

    文摘:水下混凝土澆注鋼筋籠上浮事故的原因是操作不當,如鋼筋籠固定不牢、提升導管過猛、導管埋深不當等,以及混凝土品質差,如坍落度、含砂率、粘聚性、初凝時間等不合要求。
  5. The cause of underwater concrete reinforcing cage up - floating accident is improper operation, such as loose - placement of reinforcing cage, fast - drawing of conduct pipe, improper embedded depth of conduct pipe ; and the poor quality of concrete, for example, the slump, sand percentage, adhesiveness and initial setting time don " t meet requirement

    水下混凝土澆注鋼筋籠上浮事故的原因是操作不當,如鋼筋籠固定不牢、提升導管過猛、導管埋深不當等,以及混凝土品質差,如坍落度、含砂率、粘聚性、初凝時間等不合要求。
  6. In, mid - leg deep, beheld her own white feet at the bottom ; while, out of a still lower depth, came the gleam of a kind of fragmentary smile, floating to and fro in the agitated water

    珠兒一腳踏進去,水沒到了膝蓋,她看見的只是水底的自己的白腳丫同時,從更深的一層水下,映出了一種支離破碎的微笑,在動蕩的水中上下漂浮閃動。
  7. The precautions for the underwater concrete reinforcing cage up - floating accident is placing the reinforcing cage in the pile hole center, controlling the embedded depth of conduct pile, concrete casting velocity and conduce pipe drawing velocity, mixing fine quality concrete, adding barbed bar and specialized refincing cage hanger hook

    採用對策是注意保證灌注導管位於鋼筋籠中心,控制導管埋深、灌注速度及提升導管的速度,配製品質好的混凝土,以及採用「倒剌」方法和專用吊鉤等預防措施。
  8. A non - lockable format that contains 24 bits of depth in a 24 - bit floating - point format - 20e4 and 8 bits of stencil

    一個包含24位深度(使用24位浮點格式- 20e4 )和8位模具的非鎖定格式。
分享友人