flood diversion stage 中文意思是什麼

flood diversion stage 解釋
分洪水位
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  • diversion : n. 1. 轉換,轉移,轉向;(河流、航線等的)改道;(資金等的)挪用;〈英國〉(因修路等車輛)繞行,繞路。2. 消遣,娛樂。3. 【軍事】箝制,佯攻。
  • stage : n 1 講臺;舞臺;戲院,劇場;〈the stage〉戲劇,戲劇藝術;戲劇文學;〈the stage〉戲劇業;劇壇。2 ...
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  2. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過泄洪系統整體水力學試驗,校核泄洪洞的泄流能力;通過發電引水系統整體水力學試驗,研究調壓井內水流流態和水位波動情況、調壓井內攔污柵前流速分佈情況;確定快速閘門井內水位波動幅度;試驗確定壓力管道水擊壓力穿井系數以及泄洪洞弧形門處的水壓力。
  3. In light of the special natural conditions and project layout characteristics of xiangjiaba hydropower station, a stage diversion scheme with the left bank being closed at the first stage and the right bank closed at the second stage has been selected through comparison of several schemes under the consideration of the aspects such as construction layout, late - stage flood control, navigation during the construction, and the construction period before the commissioning of the first hydropower generating unit

    摘要針對向家壩水電站特殊的自然條件和工程布置特點,其施工導流經過對多個方案進行比較,從施工布置、後期度汛、施工期通航、發電工期等方面考慮,選擇了第一期圍左岸、第二期圍右岸的分期導流方案。
  4. Construction diversion and flood passing are a important part of construction scheme in the design of concrete face rockfill dam. the flood passing standard and measures of construction diversion have special characteristic and are closely related to the construction stage and general schedule of the project

    在混凝土面板堆石壩設計中,施工導流及渡汛是施工方案的重要組成部分,混凝土面板堆石壩的導流渡汛標準和方式有其自身的特點,而且與工程的施工分期和總進度安排密切相關。
分享友人