floor current 中文意思是什麼

floor current 解釋
沿地板面氣流
  • floor : n 1 地板,地面。2 (樓房的)層。3 (船底的)肋板。4 (海洋、山洞等的)底。5 議員席;經紀人席。6 ...
  • current : adj. 1. 通用的,流行的。2. 現在的,現時的,當時的。3. 流暢的;草寫的。n. 1. 水流;氣流;電流。2. 思潮,潮流;趨勢,傾向。3. 進行,過程。
  1. The two specimens, which are designed as : main beam - pre - stress beam ? floor ? frame columniation assemble the space specimens. in order to checkout whether the code can be applied for the special structure systems, the structure of the specimens refer to the current gb50010 - 2002 concrete structure design code and gb50011 - 2001 seismic resistant code

    本文試件的各組成構件為:非預應力邊梁預應力梁板框架柱組合空間試件,各組成構件的構造參照了現行《 gb50010 - 2002混凝土結構設計規范》及《 gb50011 - 2001抗震規范》的有關規定,以檢驗規范及設計條例能否適用於該特殊結構形式。
  2. Our company size up the current situation introduction two domestic well - known brands in time melamine faced board and stick the surface production line and polyester board production line. shunde yong mao decorative board co., ltd. speciality production mdf, particle board and melamine faced board, polyester board and processing thicknesses 1. 5mm - 30mm various types of bright lightan and dark light wooden texture embossmen, rough one and rough one furniture board strengthen and compound floor, etc

    廣東省永茂裝飾有限公司,是專業生產中纖板刨花板防潮板三聚氰氨板聚脂板和加工厚度3毫米- 25毫米各式亮光啞光木紋浮雕麻面傢具貼面板和高級強化復合地板等裝飾板,產品均達到國家規定的環保標準。
  3. There are two photocopiers in the library. one is located beside the special collection room on the 1st floor, and other one is near the current periodicals area on the 2nd floor

    本館配備了兩臺帶有ic卡收款裝置的復印機,分別位於一樓特藏閱覽室旁的復印間和二樓現刊閱覽區的附近。
  4. The company is unit of director of council of floor board of association of industry of chinese forest products, lumber current association is standing director unit, manage systematic attestation smoothly already through iso9001 - 2000 international quality, be judged 3 years to be 30 quality of countrywide, service, credit to ensure a brand continuously, obtained china 2006 " green, environmental protection, energy - saving product ", " company of credit of service of quality of level of aaa of national building materials ", " 3 ? 15 consumer is at ease product " wait for multinomial honor

    公司為中國林產工業協會地板委員會理事單位、木材流通協會常務理事單位,並已順利通過iso9001 - 2000國際質量管理體系認證,連續三年被評為全國30家質量、服務、信譽保障品牌, 2006年獲得中國「綠色、環保、節能產品」 、 「國家建材aaa級質量服務信用企業」 、 「 3 ? 15消費者放心產品」等多項榮譽。
  5. Combined with one of the important supporting projects of constructive hall of hunan province, the main contents of this paper are introduced below : based on summing - up the developing situation of cast - in - situ concrete hollow floor technology all over the country, current design methods are introduced

    結合湖南省建設廳重點資助項目進行研究,本文的主要內容如下:在總結了現澆空心樓蓋技術在全國各地的發展概況的基礎上,介紹了該樓蓋結構現階段的設計方法。
  6. Monitor measurable on the production floor ( seat / hour, quality documentation, safety and attendance ) to ensure reporting and recording is current and accurate and that trends are improving and taking corrective action where required

    監督車間衡量指數(座椅生產速度,質量文件,安全與考勤) ,確保報告與紀錄的正確並及時,車間在持續改進,需要時採取改正措施。
  7. Bridge of the most conspicuous tower of london of nothing is more. . than, it is apart from the history that already had more than 100 years today, but the design of tower bridge is mixed, build look today remain so apple - pie, bridge floor is but of open, so that large ship is passed, current, this bridge still is producing its due effect, the car that has countless everyday and pedestrian are passed from this bridge, at regular intervals bridge floor is time open, in addition, this bridge is recieved even come from world each country hard enumerated tourist

    最引人注目的莫過于倫敦塔橋,它距今已有一百多年的歷史了,可是塔橋的設計和建造在今天看來仍然是那麼完美無缺,橋面是可開啟的,以便大型船隻通過,目前,該橋仍在發揮著它應有的作用,天天有無數的車輛和行人從該橋通過,每隔一定時間橋面定時開啟,此外,該橋還要接待來自世界各國難以計數的旅遊者。
  8. In this paper, three - tower building with name of oriental tunes square in xiamen is analyzed by the international current program sap2000, considering seismic action in two directions. by structural modeling and calculation, the characteristic of vibration of the multi - tower structure is analyzed, the influences of the rigid ratio of the enlarged base to top tower and translation - torsion coupled effects among several towers are investigated, the inter - story displacement, displacement of the top tower and deformation of tower ' s base floor in x and y major orientation under earthquake action are contrasted with those under wind load. at last, the distributing characteristics of stress of transfer plate and of the normal, shearing stress of mostly vertical elements under earthquake action are studied

    本文以具有3個塔樓的廈門東方時代廣場為分析對象,採用國際通用有限元分析軟體sap2000進行結構建模和分析,考慮雙向地震動輸入,研究結構的振動特性,分析底盤與塔樓剛度比對結構的影響以及多塔之間的扭轉效應和平扭耦聯作用,對比風荷載和地震作用下塔樓在兩個結構主軸方向的層間位移、頂點位移以及塔樓底層的變形,分析地震作用下轉換層樓板的應力分佈特點及主要豎向構件的正應力和剪應力分佈特點。
  9. Combined with a project financially supported by the construction bureau of hunan province, some studies on this floor have been carried out in this thesis. the valuable results achieved are outlined as below : 1. compared with the current concrete criterion, a method for the stiffness of thin - wall core box cast - in - site concrete hollow floor which is analyzed in this thesis is proposed

    本文結合湖南省建設廳重點資助項目對薄壁箱體現澆混凝土空心樓蓋進行研究,取得了的研究成果,如下: 1 、對薄壁箱體現澆混凝土空心樓蓋的剛度進行了分析,以《混凝土結構設計規范》為基礎,提出了現澆空心樓蓋剛度和內力的簡化計算方法,其計算結果與已有的試驗結果吻合良好,使樓蓋內力和變形的計算過程得以簡化。
  10. The plan encompasses the same gross floor area as currently proposed for the central government offices and legislative council, as well as for the commercial developments on the central extension outline zoning plan. it also includes many green open spaces, a central wanchai bypass and it accepts the current reclamation as given

    計劃中,政府總部立法會大樓,與及中區擴展部分分區計劃的商業發展,均採用與政府建議相同的建築面積,亦包括不少綠化的戶外空間及中環灣仔繞道,為現正進行的填海工程予以認同。
  11. On the basis of summarizing the main performance index of the current floor slab system, this paper developed a new structural shape - the cast - in - place pre - stressed compound floor slab system

    本文在總結目前樓蓋體系主要性能指標的基礎上,開發了一種新型結構型式?現澆預應力混凝土復合樓蓋體系。
  12. Floor - to - ceilling heights may need to be greater than the current norm to allow correct functioning

    地板與天花板之間的高度需高於一般規范要求,以使各部分較好的發揮其功能。
  13. This structure is flexible in the lower part while firm in the upper part. many of this structure type surpass code limitation in setting place of transfer floor, especially disadvantageous to seismic. depended on current computation method, it is difficult to confirm the integral seismic behavior and local transfer of force exactly

    帶轉換層的框支剪力墻高層建築結構屬于復雜結構,結構上剛下柔,且許多這類結構高層建築的轉換層設置位置超過了規范限制,對抗震尤為不利,結構的整體抗震性能和局部傳力情況難以依靠現有計算方法精確確定。
  14. Based on the experiment conclusion of before period of ventilation model experiment of langya shan hydropower station ’ s underground houses, the keystone of current period is study about air distribution and flow on dynamo floor. the research is divided into 3 steps, each step acquire relevant conclusion

    本論文系在瑯琊山水電站通風模型試驗項目前期研究成果的基礎上,結合后續研究課題,著重研究該電站地下廠房發電機層氣流組織以及空氣流動與分佈特性。試驗研究分三個階段進行,各階段獲得了相應的成果與結論。
  15. At present had the gross asset 80, 000, 000 yuan ( among : fixed asset 30, 000, 000 yuan, current assets 50, 000, 000 yuan ), staff 900 people, each kind of professionals 150 people, enterprise area 60, 000 square meters, floor space 30, 000 square meters

    目前已擁有資產總額8000萬元(其中:固定資產3000萬元,流動資產5000萬元) ,員工900人,各類專業技術人員150人,企業佔地面積6萬平方米,建築面積3萬平方米。
分享友人