form removal 中文意思是什麼

form removal 解釋
拆除模板
  • form : n 1 形態;形狀;樣子,外貌;【哲學】形式 (opp content)。2 人影,物影。3 格式;表格紙 (= 〈美...
  • removal : n. 1. 移動,遷移;撤退;折卸。2. 排除;除去;切除;殺害;【林業】皆伐,終伐。3. 撤職;調職。
  1. Results showed that spatial constitution form of the fillers had important effect on the oil removal efficiency of coalescence ; and that as the collision coalescence mechanism and the wetting coalescence mechanism were coexistent and the efficiency of coalescence was enhanced remarkably

    結果表明,填料的空間構成形式對聚結除油效率有重要影響,當潤濕聚結機理和碰撞聚結機理同時存在時,聚結效率可得到大幅度地提高。
  2. A crowd had gathered to watch the arrival of the instrument which was to form the centerpiece of this year ' s festival, but was stunned to see it tumble from the removal van

    這家鋼琴是今年宴會的主角,大家都聚在一起等著看鋼琴的到來,最後卻都瞪大了眼睛看到鋼琴從搬運車上滾落下來。
  3. Adsorption isotherm of activated alumina and bone char can be described by langmuir adsorption isotherm in the form qe = 0. 72cy ( l + 0. 074ce ) and freundlich isotherm in the form qe = 0. 88ce1 / 1. ' 94 respectively. continuous - flow column experiments show there have higher removal capacity for activated alumina and bone char when empty - bed contact time was controlled within 12 ~ 15min and about 15min separately

    對可利用吸附容量和實際利用吸附容量的理論分析說明,連續處理活性氧化鋁停留時間控制在12 15min較好,此時吸附容量利用率較高,約為80 ,骨炭停留時間控制在15min較好,吸附容量利用率約為75 。
  4. According to chinese industry standard ( jbj10 - 96 ), the form of ventilation and dust removal in workshop which has changeable dust source is general ventilation

    根據國家行業標準( jbj10 - 96 )規定,具有變動塵源的廠房要採用全面通風進行通風除塵。
  5. It is broken down by removal of the amino group to form pyruvic acid

    絲氨酸可以因為其上氨基的解離而被分解為丙酮酸。
  6. This article links to the plant no. 6 project, studying the measure of pressure reduction and energy removal of large caliber and long distance water delivery pipe in big difference of elevation and topographical form area. the writer gives new measure of pressure reduction and energy removal, according to the theory of pressure reduction and energy removal, planning a composite energy removal construction, and put to use effectively in many water supply projects. it is the first example that people use concrete construction to remove high pressure in large caliber and long distance water pipe in china

    本文結合西寧市第六水源工程,對高差大、地形地貌復雜地區大口徑長距離輸水管道消能減壓措施進行了研究探討,提出了全新的減壓消能方案,根據減壓消能原理,自行設計出了綜合式消能構築物,並應用於多項輸水工程中,效果良好,成為國內首例採用鋼筋混凝土構築物消除大口徑長距離輸水管道較高壓力的案例。
  7. This system is utilized the programmable controller ( plc ) bearing of substitution rule ( the figure is apparent the form, writing instrument, individual loop controller, the hand is holded the utensil and is reached to assist the bearing unit and await ), achieve the 29mw ' s cycle stream of water warmhearted water boiler, oxygen remover, warmhearted net system control system together with monitoring voluntarily of electric section together with control being living, the rule to call off greats quantity displays the bearing in that system, boiler, oxygen remover, the warmhearted net operation is achieved crt and is supervised completely, manipulates personnel staff is living inner place the control cabin completely completees failure - free operation and trouble removal operation. the predictive target of putting ino production queen is the boiler, oxygen remover, the warmhearted net is achieved comprehensive self - regulation, moreover be able to be over a long period of time, steady secure operation

    本系統利用可編程式控制制器( plc )替代常規的儀表(數顯表、記錄儀、單迴路控制器、手操器及輔助儀表裝置等) ,實現29mw循環流化床熱水鍋爐、除氧器、熱網系統控制系統與電氣部分的自動監測與控制。在該系統中取消大量的常規顯示儀表,鍋爐、除氧器、熱網的運行實現crt全面監控,操作人員在控制室內全部完成正常運行及事故處理操作。投產后的預期目標是鍋爐、除氧器、熱網實現全面自動調節,並能長期、穩定、安全運行。
分享友人