forward bridge 中文意思是什麼

forward bridge 解釋
船首駕駛臺
  • forward : adv 1 向前,前進 (opp backward)。2 【航海】在船頭,向船頭(opp aft)。3 今後,將來。4 出來,出...
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. Abstract : based on the concept of being serviceable at both peacetime andwartime and existing research achievements, the paper puts forward general programme, mechanical model and computational method for the railway bateau bridge across yangtze river, which can meet the navigation requirements, obtain high degree of attack - resistance and be extensively used

    文摘:基於平戰結合的思想,立足於現有的成果,提出了能滿足長江通航要求,具備良好的抗打擊性和可以廣泛應用的長江鐵路浮橋總體方案、力學模型和計算方法。
  3. Considering to the continuous rigid - frame bridge construction characteristic, putting forward the idea of reverse to optimize prestressed steel. according to different construction phases, the paper gets the formual of the cantalever phase, join two section of a bridge phase and the vertical prestressed steel, and works out corresponding program

    考慮大跨徑預應力混凝土連續(剛構)橋施工的特點,提出了基於倒裝方法的預應力靜定束、合龍束以及豎向束的優化設計理論,並編制了相應的計算程序。
  4. Under the background of a long - span rigid - framed flexible cfst arch bridge, the catholicity method to compute the ultimate capacity is brought forward

    以某大跨度剛性梁柔性鋼管硅拱橋為例,總結了具有較普遍意義的大跨度橋梁極限承載力計算方法。
  5. 3. as to vehicle - bridge system coupling vibration, this difficulty in engineering industry, it was abstractly summarized in this thesis, and introduce a method to establish and resolve equations about such coupling vibration, bring forward a flow chart to write correlative software ; with the help of ansys, make out some work about preparatory simulation, so as to research basic point of chicle - bridge system coupling vibration

    3 、對車橋耦合振動這一業內的難點進行了理論上的分析,引入了一種建立和求解車橋耦合振動系統方程的較為典型的方法,提出了一份自行編製程序的流程簡圖;借用ansys軟體對該橋做了車橋耦合振動的初步模擬計算,探索車橋共振的基本特點。
  6. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河流的洪水特點,結合以往工程實際,對影響跨河橋梁設計高度的主要因素? ?設計洪水流量及其相應洪水位的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍江省的河流粗糙系數和洪水比降的確定原則,並介紹了三日降雨量法。
  7. A circuit topology of the inverter with duty cycle extended active clamp forward style high frequency pulse dc link is adopted by each independent inverter. each inverter is cascaded by a circuit with duty cycle extended active clamp forward style high frequency pulse dc link and a dc / ac inverting bridge. the control strategy of voltage mode pwm forwardback is adopted by the former, and the control strategy of three - state discrete pulse modulation ( dpm ) hystersis current is adopted by the later

    每個獨立的航空靜止變流器採用占空比擴展有源箝位正激式高頻脈沖直流環節電路拓撲,由占空比擴展有源箝位正激式高頻脈沖直流環節電路與dc ac逆變橋級聯而成,前級採用電壓型pwm前饋控制技術,后級採用三態dpm電流滯環控制技術。
  8. Yesterday, thank you for your care and cherishing and the friendship bridge between us has been set up. today we sincerely hope get your more support and help. pengfei will emit effulgent rays of light and carry forward the spirit of new epoch continrorsly

    昨天承您的關心和愛護,在我們之間架起了友誼的金橋,今天,我們更熱忱地將得到您的支持與幫助,鵬飛將放射出光輝燦爛的光芒,發揚新時代的精神。
  9. In evaluating the consequence of the ship - against - bridges accidents, a concept of " equivalent weight of consequence " has been put forward, which will become a guide for the research and application concerned in the future. based on the above researches, a preliminary risk assessment of harbin song hua river slope road bridge under

    在上述研究的基礎上,對在建的哈爾濱松花江斜拉公路橋進行了初步的船撞風險分析,對該橋的船撞風險給出了評價,並提出了降低船撞橋風險的具體建議,其中部分建議已在實際當中采納。
  10. Directed against the jump disease at bridge abutment in the high - grade highway, for the first time, the paper puts forward the treatment method of the flexible approach slab, which is consisted of geocell

    針對我國高等級公路路橋過渡段橋頭跳車病害嚴重的現狀,本文首次提出了由土工格室構成的楔型柔性搭板處治技術。
  11. Combined with the engineering practice, the author puts forward the synthetical prevention and cure technique, construction technology and controlling quality measurement, and discusses preventing and curing the jump disease in the bridge abutment of the highway

    結合工程實際,提出了高速公路橋頭跳車病害綜合防治技術、施工工藝及質量控制手段,為今後防治高速公路橋頭跳車病害進行了有益的探討。
  12. Then novel circuit structure of bi - directional voltage mode ( based on forward converter ) inverters with high frequency link, are proposed, which is constituted of input cycloconverter, high frequency transformer, output cycloconverter, input and output filter ; the circuit topologies family of this bi - directional voltage mode inverters with high frequency link include six circuit topologies, such as push pull - full wave mode, push pull - full bridge mode, half bridge - full wave mode, half bridge - full bridge mode, full bridge - full wave mode, and full bridge - full bridge mode etc. taking full bridge - full bridge mode circuit as an example, principle of uni - polarity phase shifting controlled bi - directional voltage mode inverters with high frequency link is introduced

    本文首先論述了dc / ac逆變技術的應用前景及發展現狀。基於正激forward變換器的雙向電壓源型高頻環節逆變器電路結構,由輸入周波變換器、高頻變壓器、輸出周波變換器、以及輸入、輸出濾波器構成;雙向電壓源高頻環節逆變器電路拓撲族,包括推挽全波式、推挽橋式、半橋全波式、半橋橋式、全橋全波式、全橋橋式六種電路。
  13. She looked forward to the next bridge of the jolly seventeen.

    她眼睜睜期待著《芳華俱樂部》的下一次紙牌會。
  14. In general, a precise resistor is in series with one of the resistors in wheatstone bridge to compensate the zero offset, and the other one is in parallel with another arm of the wheatstone bridge to compensate thermal zero drift. based on this principle, in this paper, a compensation method based on virtual instrument technology has been put forward. actuated by current source, a good calculation method of compensation resistors and their position in the bridge is deduced

    本文基於串並聯電阻補償法的原理,提出了一種基於虛擬儀器的誤差補償方案,推導了在恆流源供電下可以精確的計算出補償電阻大小和補償位置的演算法,並且在虛擬儀器軟體平臺labview上完成了數據採集、處理、顯示等軟體的設計,經過實驗的驗證,對傳感器的零點溫度漂移補償取得較好的效果,而對靈敏度溫度漂移的工藝補償亦有一定的效果。
  15. This paper has benefited in from close trade ' s experiences and combined with the trait of this aqueduct bridge to bring forward the method of classification evaluation, which was successfully used in the evaluation of this aqueduct bridge

    本文借鑒相近行業經驗,結合渡槽特點,提出了分級評估的方法。並成功地運用於該渡槽的評估。對同類型的工程進行評估,有著重要的參考價值。
  16. According to the character of suspension bridge, firstly the theory of construction control calculation of suspension bridge is analyzed and a new calculative method which is the analytical numerical theory and limited displacement theory is put forward

    針對懸索橋結構的受力與變形特點,首先,分析了懸索橋施工控制原理,提出了懸索橋施工控制分析計算軟體設計的新思路,即綜合採用懸索橋解析理論和有限位移理論的計算方法。
  17. Combining with the performances of danshan bridge, discussing the methods on the construction controlling and calculation of cable - stayed bridge, this paper raises an efficient construction controlling system, and realizes collecting construction data of the real bridge and technical information. by analyzing on the difference of theoretical calculation and real construction state, the author determines to take self - adapting construction controlling method which uses kalman filter method to identify and adjust construction parameters. by getting rational construction state from forward iteration method, this paper, taking concrete creep effect in consideration, raises a rational scheme to pre - remain deformation and adjust cable force

    結合丹山橋的結構特點,通過對斜拉橋施工控制及結構計算方法的探討,提出了有效的施工控制系統,實現了對實橋施工數據和技術信息的採集;通過分析理論計算與實際施工狀態的差異,確定了以卡爾曼濾波法作為施工參數識別與調整的自適應施工控制方法;通過正裝迭代法確定其合理施工狀態,並考慮混凝土的徐變效應,提出了合理的預留拱度和索力調整方案。
  18. But drawing from the stores of his aged wisdom what they could understand, he told them of the golden bridge, and they laughed at him, slandered him, pushed on and dashed forward, exulting over the wounded beast

    他從他那老年人的智慧中闡述能使他們懂得的道理,他對他們講「金橋」 ,可是他們譏笑他,中傷他,他們大發脾氣,在那頭已被打死的野獸面前威風凜凜。
  19. Bolton wanderers forward anelka and tottenham hotspur ace berbatov have both been linked with january moves to stamford bridge

    博爾頓前鋒阿內爾卡和熱刺的貝爾巴托夫都被認為極有可能在今年一月前往斯坦福橋。
  20. Look, theres an officer jammed in too, the soldiers said in different parts of the stationary crowd, as they looked about them and kept pressing forward to the end of the bridge

    你瞧,他們把那個軍官擠得無路可走。 」站著的一大群人面面相覷,談東道西,還在橋頭上擠來擠去。
分享友人