full load displacement 中文意思是什麼

full load displacement 解釋
滿載排水量
  • full : adj 1 充滿的,裝滿的。2 充分的,豐富的;擠滿的;(吃、喝等)盡興的,3 (精神)飽滿的。4 完全的,...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • displacement : n 1 轉位,移動;取代,置換;(人的)流離失所。2 撤換,免職。3 【機械工程】(活塞)排氣量;【航海...
  1. Uss lexington cv - 2 length overall : 270. 8m beam max : 39. 7m hull : 32. 2m displacement standard : 41187t full load : 43054t the lexington, was originally designated cc - 1, laid down as a battlecruiser 8 jan 1921 quincy, massachusetts. authorized to be completed as an aircraft carrier 1 july 1922, commissioned 14 december 1927. on 7 december 1941, lexington based at pearl harbor, when word of the japanese attack on pearl harbor was recevied, she immediately launched searchplane to hunt for the japanese fleet

    1927年12月14日開始進入美國海軍序列服役。 1941年12月7日,以珍珠港為基地的列剋星敦號收到母港遭到襲擊的消息,她立刻派遣偵察機搜索日本艦隊。 1942年5月7日,列剋星敦號的艦載機擊沉了日本輕型航母祥鳳號。
  2. According to the recorded full process fracture curve, the paper calculated and compared the fracture toughness ( kic ), the fracture energy ( gf ) and crack tip opening displacement ( ctod ) of the different strength grade boulder concrete and crushed stone concrete, it is found that the maximal load ( fmax ) and the fracture toughness ( kic ) of boulder concrete and crushed stone concrete increase when the strength of them increases, so does the fracture energy of boulder concrete, but the fracture energy of crushed stone concrete does n ' t obviously increase when it ' s strength increases. the crack tip opening displacement ( ctod ) of all specimens chang less when the strength of concrete increases, so it is concluded that the location of the axle in the ligament of the specimens is relatively stable

    根據記錄的全曲線,計算了不同強度等級的卵石混凝土、碎石混凝土的斷裂韌度k _ ( ic ) 、斷裂能g _ f以及裂縫的尖端開口位移ctod ,比較了不同強度等級卵石混凝土及碎石混凝土的斷裂韌度k _ ( ic ) 、斷裂能g _ f以及裂縫的尖端開口位移ctod的關系,發現卵石混凝土、碎石混凝土的荷載峰值fmax 、斷裂韌度k _ ( ic )隨強度增加而增加,卵石混凝土的斷裂能g _ f隨強度增加而呈增加趨勢,碎石混凝土的斷裂能g _ f隨強度增加變化趨勢平直,增勢不明顯。
  3. A load - displacement full - process analyzing program of cfrp - confined rc eccentrically loaded columns is given. the computed results of load - displacement coincide with test results

    編制荷載-撓度全過程計算程序對碳纖維布約束偏壓柱進行數值分析,程序計算曲線與試驗曲線吻合良好。
  4. Uss bb - 55 north carolina battleship length overall : 222. 1m beam : 33m draft : 10. 8m displacement standard 36600t full load 46700t the north carolina bb - 55 was laid down 27 october 1937 by new york naval shipyard ; launched 13 june 1940 and commissioned at new york 9 april 1941

    總長: 222 . 1米寬: 33米吃水: 10 . 8米正常排水量: 36600噸滿載排水量: 46700噸1937年10月27日,北卡羅萊納號戰列艦在紐約海軍造船廠鋪設骨, 1940年6月13日下水並於次年4月9日在紐約入役。
  5. Tow speciments of prestressed fabricated beam - column subassembly were tested under reversed cyclic loading. experimental studies were carried out to investigate the strain distribution, failure mechanism and load - bearing capacity on the beam - column connections, as well as ductility, hysteresis curves energy dissipation, displacement restoring capacity of full pc speciments

    本文通過兩榀預壓裝配式樑柱組合體在低周反復荷載下的試驗,了解了預壓裝配式框架梁端截面應變分佈、破壞機理和極限承載能力;探討了全預應力配筋截面延性特徵、滯回性能、耗能能力和變形恢復能力。
  6. The load - displacement curves and moment - curvature curves that calculated from the full - course analysis program are in accordance with the resuits of experimental especially in prime period of ioad presents the program is avaiiable

    試驗和全過程分析得到的荷載-撓度曲線對比表明:在加載前期兩者的曲線吻合較好,證明全過程分析能反映碳纖維加固梁的受力特點及程序的正確性。
  7. Uss ticonderoga cv - 14 length overall : 270. 8m beam max : 44. 9m displacement standard : 27100t full load : 36380t the second long hull unit, ticonderoga was laid down in 1 mar 1943, commissioned in may of 1944, built by newport news. her first action was supporting landings in the philippines. in january 1945 the she was damaged by a kamikaze, but returned to support operations off okinawa and japan

    總長: 270 . 8米總寬: 44 . 9米正常排水量: 27100噸滿載排水量: 36380噸提康德羅加號航空母艦是第2艘長船體型埃塞克斯級航空母艦, 1943年3月1日在紐波特紐斯船廠鋪設骨, 1944年5月加入美國海軍服役。
分享友人