gantry running 中文意思是什麼
gantry running
解釋
懸架試驗-
Overhead and gantry cranes top running bridge, single girder, underhung hoist
橋式起重機和龍門起重機 -
, interpreations : overhead and gantry cranes top running bridge, single grinder, underhung hoist
說明:高架起重機和龍門起重機 -
The ansys, a kind of fea program, was used to build model of small carriage. the procedure of gantry beam bump with secondary beam of bridge was reappeared by running nonlinear calculation and loading program which was written by apdl program language. the closest deforming result was gotten, and the deforming of main beam, secondary beam and end beam and inner stress distribution status were calculated
採用大型三維有限元軟體ansys對該起重機以及小車架等進行了建模、應用apdl語言編寫加載程序、進行非線性計算,再現龍門橫梁與起重機副梁碰撞過程,最後得到與實際變形結果最接近的一種狀態,得出起重機橋架主梁、副梁、端梁的變形以及其內部的應力分佈情況。 -
Rules for construction of overhead and gantry cranes top running bridge, multiple girder
橋式起重機和龍門起重機的建造規則 -
Interpretations : overhead and gantry cranes top running bridge, single or multiple girder, top running trolley hoist
說明書:高架和龍門起重機說明
分享友人