geologic section 中文意思是什麼

geologic section 解釋
【地質學;地理學】地質剖面。

  • geologic : adj. 地質學的,地質的。 a geologic survey 地質調查。adv. -ically
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. Strengthening ill geologic section road chasm side slope with prestressed achor pile grid beam

    預應力錨桿格梁加固不良地質地段路塹邊坡
  2. By knowing the surface information of the geologic bodies, the planar section map and three - dimensional section map can be generated along arbitrary directions, which reflect the outer profile and inner structure of the geologic bodies

    提供了從任意方向對三維地質體剖切生成平面或立體剖面圖的方法,使地質體的整體輪廓和內部結構得到直觀的反映。
  3. This article described the deformation features of taojiaba landslide and analyzed the inner factors, geologic setting, topography, morphology, stratum, lithology and texture, and the external influence factors, precipitation, flood, human activity, neotectonic activity and earthquake, and the transform features of landslide in the near future, and evaluate stability of landslide through the section coefficient method calculation on basis for landslide mechanism analysis and control work

    摘要陶家壩滑坡基本特徵顯示,滑坡變形的主要影響因素有:地質環境因素(地形地貌、地層巖性、物質結構) 、外界影響因素(降水因素、洪水因素、人為因素、新構造及地震) ,以及滑坡近期變形特徵,通過剖面遞推系數法計算,對滑坡的穩定性進行了評價,為滑坡機制分析和優化整治措施提供依據。
  4. Accordingly, the dune deposits of the section since 150 ka bp can be divided into 38 alternate evolvement processes of desert and inter - desert periods, which accord with the sedimentary cycles of the section. it is further suggested from now climate in the area that the 38 inter - succession processes of dune deposits and fluvio - lacustrine or palaeosols in past 150 ka actually result from the alternate evolvement of the ancient east asia winter and summer monsoons in the mu us desert during the long geologic times

    從這一認識出發,將米浪溝灣剖面150ka以來的砂丘堆積劃分為38個旋迴的沙漠期與間沙漠期交替演化過程,並認為,該剖面自那時以來發生的38個砂丘沉積與河湖相或古土壤的演替過程,實際上是這一長期地質時代毛烏素沙漠受東亞冬夏古代季風影響交替演化所致。
  5. According to the geological background of the eastern section of daye maopu ~ yangxin liangjianqiao fracture zone, the characters of the known mineral deposits and the comprehensive analysis of the previous geologic work, and in combination of the characters of the known mineral deposits in the western section and the successful ore searching experience of jiguanzui copper - gold deposit, this paper analyses that there is large amount of ore searching information of hidden porphyry copper - molybdenum - gold deposit in the place where the eastern section of the east - west fracture zone and the edge of yangxin volcanic - rock sedimentary basin intersect, and infers that there occurs the copper - molybdenum - gold ore - forming massif at the edge of yangxin volcanic - rock sedimentary basin

    摘要通過大冶毛鋪陽新兩劍橋東西向斷裂帶東段地質背景、已知礦床地質特徵及前人地質工作的綜合分析,結合西段已知礦床的特徵和雞冠嘴銅金礦床成功的找礦經驗,分析東西向斷裂帶的東段與陽新火山巖沉積盆地邊緣交匯地段存在大量的隱伏斑巖型銅鉬金礦床的找礦信息,推斷陽新火山巖沉積盆地邊緣存在隱伏含銅鉬金成礦巖體。
  6. Based on the four geologic structural section ( 2 pieces ne - sw direction, 2 pieces nearly ew direction ) which controlled different structural area and several supplementary profiles and several other auxiliary sections, summarize and analyze the structural style research area. surface structural styles shown on great profiles were discussed in different structural section after continual observation

    以野外測制的控制不同構造區的四條地質構造剖面(北東-南西向兩條、近東西向兩條)及若干輔助剖面為基礎,對研究區的構造樣式進行了總結和分析。
  7. Research on filling methods of geologic histogram and stratum section

    地質柱狀圖及地層斷面圖的填充方法研究
  8. For the needs of second - term project for pudong airport there is possibility to construct a tunnel of serving driveway under the operating runway, but it s obviously of great difficulty, and nowdays there are few such projects for reference, so it is urgent to carry out the research to make sure of the feasibility for the construction based on the analysis of geologic information, cross section of the line and restriction of construction, in this paper three construction schemes and the effects of each scheme were analysed : cut and cover method, pipe roof culvert box advancing method. shield driving method

    摘要浦東國際機場二期工程建設存在著在運營跑道下實施地下穿越的可能性,在運營跑道下實施地下穿越難度很大,而目前國內外軟土地區在跑道下實施地下穿越工程很少,因此論文通過研究分析了服務車道地下穿越跑道區域的可行性及方案。
  9. Drawing of section and column on three - dimensional geologic model

    三維工程地質模型的剖面圖和柱狀圖繪制
分享友人